AC Assessment of DC Power Flow Screening for Data Center Hosting Capacity and Siting

A screening procedure based on direct current (DC) power flow estimates the data center hosting capacity of a candidate bus, termed the DC-screened capacity, and selects the generator commitment that supports it. This paper assesses that estimate under the alternating current (AC) network model. With the selected commitment fixed, an AC optimal power flow reoptimizes dispatch and voltages to find the largest data center load the bus can carry, termed the AC-assessed capacity. On a synthetic Texas system with 123 buses, the DC-screened capacity exceeds the AC-assessed capacity at 113 buses. Across all 123, the ratio of DC-screened to AC-assessed capacity has a median of 143% (a 43% overestimate) and a maximum of 1,070%. At these 113 buses, the DC-screened capacity violates a branch apparent power limit or a generator reactive power limit in the AC model, two limits the DC model omits. The overestimate changes decisions: a 1-GW project passes DC screening at every bus but exceeds the AC-assessed capacity at 37, and the bus ranked first by DC screening has 205.5 MW less AC-assessed capacity than the bus ranked second. Reporting the AC-assessed capacity beside each DC-screened capacity lets planners reject oversized projects or choose better sites.

eess.SY↗

Impact of Data Center Load on Co-Optimized Generation and Transmission Expansion Planning with Embedded Unit Commitment

The rapid growth of hyperscale data centers challenges grid expansion planning, yet existing studies focus largely on operational flexibility rather than long-term investment decisions. This paper examines how large data center loads sited at multiple buses affect co-optimized Transmission Expansion Planning (TEP) and Generation Expansion Planning (GEP). The problem is formulated as a multi-year, Unit Commitment (UC)-embedded mixed-integer linear program on the modified IEEE 24-bus Reliability Test System (RTS-24) with Electric Reliability Council of Texas (ERCOT)-calibrated renewable energy profiles. A 500 MW data center load, about 17.5% of the base-year peak, is allocated across four buses by voltage level, generation headroom, renewable co-location, and network connectivity. Integrating this load raises the 15-year net present value of total system cost by 1,794 million USD (+61.6%) and the system-average locational marginal price (LMP) by 45.2%, with operating cost dominating capital investment (84.2% versus 15.8%). Renewable curtailment remains negligible: existing renewables are already near full utilization, so the added demand is served almost entirely by incremental thermal generation. Most notably, the load shifts the optimal plan from transmission-only to generation-only, replacing the base-case 230 kV reinforcement with a new 400 MW combined-cycle gas turbine and showing that strategically sited generation can substitute for network reinforcement.

eess.SY↗

Impact of Security Modeling Fidelity on Hyperscale Data Center Hosting Capacity Assessment

This paper assesses hyperscale data center hosting capacity in transmission grids. Hosting capacity (HC) analysis quantifies the maximum additional load a bus can accommodate without violating operational constraints. This paper defines data center HC as the maximum time-invariant active power demand at a single target bus over a 24-hour peak-day horizon, and evaluates it under four models of increasing fidelity (i.e., the extent to which the model enforces real-world operational security requirements) on the modified IEEE 24-bus system: (i) DC optimal power flow (DC-OPF) without unit commitment (UC), (ii) basic SCUC (security-constrained unit commitment) without reliability constraints, (iii) SCUC with spinning reserve, and (iv) N-SCUC with both reserve and branch-contingency security. Comparing these models quantifies the impact of unit commitment, reserve requirements, and N-1 security on bus-level HC estimates. The N-SCUC yields an average HC of 444 MW; omitting N-1 security raises this to 532 MW, a 19.8% overestimation. The DC-OPF and basic SCUC models further overestimate HC, indicating a trade-off between model complexity and estimation accuracy.

eess.SY↗

GridMind: LLMs-Powered Agents for Power System Analysis and Operations

The complexity of traditional power system analysis workflows presents significant barriers to efficient decision-making in modern electric grids. This paper presents GridMind, a multi-agent AI system that integrates Large Language Models (LLMs) with deterministic engineering solvers to enable conversational scientific computing for power system analysis. The system employs specialized agents coordinating AC Optimal Power Flow and N-1 contingency analysis through natural language interfaces while maintaining numerical precision via function calls. GridMind addresses workflow integration, knowledge accessibility, context preservation, and expert decision-support augmentation. Experimental evaluation on IEEE test cases demonstrates that the proposed agentic framework consistently delivers correct solutions across all tested language models, with smaller LLMs achieving comparable analytical accuracy with reduced computational latency. This work establishes agentic AI as a viable paradigm for scientific computing, demonstrating how conversational interfaces can enhance accessibility while preserving numerical rigor essential for critical engineering applications.

cs.AI↗

Assessing the Reliability Benefits of Energy Storage as a Transmission Asset

Utilizing energy storage solutions to reduce the need for traditional transmission investments has been recognized by system planners and supported by federal policies in recent years. This work demonstrates the need for detailed reliability assessment for quantitative comparison of the reliability benefits of energy storage and traditional transmission investments. First, a mixed-integer linear programming expansion planning model considering candidate transmission lines and storage technologies is solved to find the least-cost investment decisions. Next, operations under the resulting system configuration are simulated in a probabilistic reliability assessment which accounts for weather-dependent forced outages. The outcome of this work, when applied to TPPs, is to further equalize the consideration of energy storage compared to traditional transmission assets by capturing the value of storage for system reliability.