SearcharxivSearch

arXiv subjects

K. Akai

Publications and source records attributed to K. Akai.

5 recordsLinked to original sources

Optimization of RF phase and beam loading distribution among RF stations in SuperKEKB

SuperKEKB is the e-/e+ collider which targets the world highest luminosity. In recent operation, SuperKEKB achieved a new world record of $4.71\times 10^{34} cm^{-2}s^{-1}$ for luminosity with the beam current of 1.4 A. In the future, the beam current will be increased further to aim at the design value of 3.6 A and much higher luminosity. The RF system consists of 38 cavities (30 klystron stations), which share the huge beam loading brought by high current beam with each other cavities. For beam stability and power efficiency, it is important to distribute the beam loading properly among RF cavities. It is equivalent to adjust the acceleration phase of each cavity. However, it is difficult to evaluate the acceleration phase using only the pickup signal. Therefore, we established a method to evaluate the beam loading balance among RF stations from the RF power measurement for each cavity, and to adjust the acceleration phase. This report introduces the method for evaluating and optimizing the beam loading (acceleration phase) among stations in SuperKEKB, which has a large number of RF stations, and its operation.

physics.acc-ph

LLRF controls in SuperKEKB Phase-1 commissioning

First beam commissioning of SuperKEKB (Phase-1), which is an asymmetry double ring collider of 7-GeV electron and 4-GeV positron beams, which had started from February, has been successfully accomplished at the end of June 2016, and the desired beam current for Phase-1 was achieved in both rings. This paper summarize the operation results related to low level RF (LLRF) control issues during the Phase-1 commissioning, including the system tuning, the coupled bunch instability and the bunch gap transient effect. RF system of SuperKEKB consists of about thirty klystron stations in both rings. Newly developed LLRF control systems were applied to the nine stations among the thirty for Phase-1. The RF reference signal distribution system has been also upgraded for SuperKEKB. These new systems worked well without serious problem and they contributed to smooth progress of the commissioning. The old existing systems, which had been used in the KEKB operation, were still reused for the most stations, and they also worked as soundly as performed in the KEKB operation.

physics.acc-ph

Belle II Technical Design Report

The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under construction, to increase the luminosity by two orders of magnitude during a three-year shutdown, with an ultimate goal of 8E35 /cm^2 /s luminosity. To exploit the increased luminosity, an upgrade of the Belle detector has been proposed. A new international collaboration Belle-II, is being formed. The Technical Design Report presents physics motivation, basic methods of the accelerator upgrade, as well as key improvements of the detector.

physics.ins-det

KEKB Beam Collision Stability at the Picosecond Timing and Micron Position Resolution as observed with the Belle Detector

Using the Belle detector we study the characteristics of beam collisions at the KEKB 3.5 GeV $e^+$ on 8 GeV $e^-$ asymmetric energy collider. We investigate the collision timing {\tip} and its $z$-coordinate along the beam axis {\zip} as a function of the position of the colliding bunch in a beam train. The various {\tip} and {\zip} behaviors observed by Belle are attributed to beam loading effects in the radio frequency cavities that accelerate the beams with a beam abort gap. We report these results in detail and discuss the prospects for the SuperKEKB collider.

physics.ins-det

Compensation of the Crossing Angle with Crab Cavities at KEKB

Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than the geometrical gain has been achieved, further study is necessary and under way to reach the prediction of simulation.

physics.ins-det