SearcharxivSearch

arXiv subjects

Li-Jun Dan

Publications and source records attributed to Li-Jun Dan.

2 recordsLinked to original sources

SVOM/VT: Flight Model Verification and Pre-launch Testing

This paper presents pre-launch testing and calibration results for the SVOM/VT (Space-based Variable Objects Monitor, Visible Telescope) Flight Model (FM), validating its performance under simulated space conditions through thermal vacuum cycling, energy concentration analysis, stray light suppression, and CCD/electronics calibrations (gain, noise, quantum efficiency). The results confirm full compliance with design requirements: stray light suppression achieves point-source transmittance $<10^{-7}$ at $30^\circ$ off-axis, thermal control maintains stable CCD temperatures ($-75^\circ$C for the red channel, $-65^\circ$C for the blue channel), and detection sensitivity meets the limiting magnitude of 22.50 (SNR $>$ 3 with 300 seconds exposure). Early in-orbit tests further validate performance, yielding limiting magnitudes of 22.70 (V-band, red) and 22.78 (blue), consistent with pre-launch specifications.

astro-ph.IM

SVOM/VT: Real-Time Onboard Data Processing

The SVOM Visible Telescope (VT) is critical for the rapid identification of gamma-ray burst (GRB) optical counterparts, particularly for high-redshift candidates that require immediate infrared spectroscopic follow-up. To address the stringent bandwidth constraints of the VHF downlink while ensuring real-time data availability, we developed the VT Onboard Data Processing Pipeline (VOPP).This paper details the software architecture, algorithms, and hardware implementation of VOPP using an FPGA and a CPU. The pipeline performs essential real-time tasks, including image quality assessment, dark and flat-field correction, and optimized image stacking to mitigate cosmic ray contamination and variable background noise. Furthermore, it generates compact source catalogs and highly compressed 1-bit images to facilitate rapid downlink.In-flight performance analysis confirms the pipeline's robustness, demonstrating the availability of VT VHF data for 78 percent of promptly slewed SVOM GRBs, with 56 percent leading to the identification of optical counterparts, typically within 18 minutes post-trigger.

astro-ph.IM