Design and Implementation of Scalable Communication Interfaces for Reliable and Stable Real-time Co-Simulation of Power Systems

Co-simulation offers an integrated approach for modeling the large-scale integration of inverter-based resources (IBRs) into transmission and distribution grids. This paper presents a scalable communication interface design and implementation to enable reliable and stable real-time co-simulation of power systems with high IBR penetration. The communication interface is categorized into two types: local and remote. In local scenarios, where subsystems are connected within a single local area network (LAN), low-latency communication facilitates the seamless integration of electromagnetic transient (EMT) and phasor-domain models, enabling efficient interactions with power and energy management algorithms. For remote scenarios, data exchange is achieved via internet-based file sharing or VPN-enabled communication. The performance of both methods is evaluated using OPAL-RT as a real-time simulator, demonstrating scalability, effectiveness, and challenges specific to real-time co-simulation applications. To mitigate instability arising from data resolution mismatches in time-sensitive co-simulations, a real-time data extrapolation method is proposed. This approach significantly enhances stability and reliability, ensuring more accurate simulation outcomes. The implementation code is available on GitHub, providing researchers the tools to replicate and expand upon this work.

eess.SY

Invisible Manipulation Deep Reinforcement Learning Enhanced Stealthy Attacks on Battery Energy Management Systems

This paper introduces "invisible manipulation," an innovative cyber-attack mechanism achieved through strategically timed stealthy false data injection attacks (SFDIAs). By stealthily manipulating measurements of a critical asset prior to the target time period, the attacker can subtly guide the engineering system toward a predetermined operational state without detection. Using the battery energy management system (BEMS) as a case study, we employ deep reinforcement learning (DRL) to generate synthetic measurements, such as battery voltage and current, that align closely with actual measurements. These synthetic measurements, falling within the acceptable error margin of residual-based bad data detection algorithm provided by state estimation, can evade detection and mislead Extended Kalman-filter-based State of Charge estimation. Subsequently, considering the deceptive data as valid inputs, the BEMS will operate the BESS towards the attacker desired operational states when the targeted time period come. The use of the DRL-based scheme allows us to covert an online optimization problem into an offline training process, thereby alleviating the computational burden for real-time implementation. Comprehensive testing on a high-fidelity microgrid real-time simulation testbed validates the effectiveness and adaptability of the proposed methods in achieving different attack objectives.

eess.SY

Assessment of Transmission-level Fault Impacts on 3-phase and 1-phase Distribution IBR Operation

The widespread deployment of inverter-based resources (IBRs) renders distribution systems susceptible to transmission-level faults. This paper presents a comprehensive analysis of the impact of transmission-level faults on 3-phase and 1-phase distribution IBR operation. To evaluate distributed IBR tripping across various phases and locations on a distribution feeder, we conduct simulations of both symmetrical and unsymmetrical transmission faults at progressively greater electrical distances on a real-time transmission and distribution (T&D) co-simulation platform. The IBR power-to-load ratios (PLRs) at 50%, 100%, and 300% are considered to emulate low, medium, and high IBR conditions. Our results indicate that, while 1-phase and 2-phase faults typically trigger fewer IBR trips when compared to 3-phase faults, a significant power imbalance arises from the tripping of 1-phase IBRs on the affected phases. The imbalance can result in significant power quality problems and unintended equipment tripping. It may be necessary to design fault-ride-through mechanisms specifically tailored to 1-phase IBRs to help mitigate the power imbalances caused by unbalanced faults.

eess.SY

Under-frequency Load Shedding for Power Reserve Management in Islanded Microgrids

This paper introduces under-frequency load shedding (UFLS) schemes specially designed to fulfill the power reserve requirements in islanded microgrids (MGs), where only one grid-forming resource is available for frequency regulation. When the power consumption of the MG exceeds a pre-defined threshold, the MG frequency will be lowered to various setpoints, thereby triggering UFLS for different levels of load reduction. Three types of controllable devices are considered for executing UFLS: sectionalizers, smart meters, and controllable appliances. To avoid unnecessary UFLS activation, various time delay settings are analyzed, allowing short-lived power spikes caused by events like motor startups or cold-load pickups to be disregarded. We tested the proposed UFLS schemes on a modified IEEE 123-bus system on the OPAL-RT eMEGASIM platform. Simulation results verify the efficacy of the proposed approaches in restoring power reserves, maintaining phase power balance, and effectively handling short-lived power fluctuations. Furthermore, in comparison to sectionalizer-based UFLS, using smart meters or controllable loads for UFLS allows for a more accurate per-phase load shedding in a progressive manner. As a result, it leads to better balanced three-phase voltage and serves more loads.

eess.SY

MultiLoad-GAN: A GAN-Based Synthetic Load Group Generation Method Considering Spatial-Temporal Correlations

This paper presents a deep-learning framework, Multi-load Generative Adversarial Network (MultiLoad-GAN), for generating a group of synthetic load profiles (SLPs) simultaneously. The main contribution of MultiLoad-GAN is the capture of spatial-temporal correlations among a group of loads that are served by the same distribution transformer. This enables the generation of a large amount of correlated SLPs required for microgrid and distribution system studies. The novelty and uniqueness of the MultiLoad-GAN framework are three-fold. First, to the best of our knowledge, this is the first method for generating a group of load profiles bearing realistic spatial-temporal correlations simultaneously. Second, two complementary realisticness metrics for evaluating generated load profiles are developed: computing statistics based on domain knowledge and comparing high-level features via a deep-learning classifier. Third, to tackle data scarcity, a novel iterative data augmentation mechanism is developed to generate training samples for enhancing the training of both the classifier and the MultiLoad-GAN model. Simulation results show that MultiLoad-GAN can generate more realistic load profiles than existing approaches, especially in group level characteristics. With little finetuning, MultiLoad-GAN can be readily extended to generate a group of load or PV profiles for a feeder or a service area.

eess.SP

A Novel Feeder-level Microgrid Unit Commitment Algorithm Considering Cold-load Pickup, Phase Balancing, and Reconfiguration

This paper presents a novel 2-stage microgrid unit commitment (Microgrid-UC) algorithm considering cold-load pickup (CLPU) effects, three-phase load balancing requirements, and feasible reconfiguration options. Microgrid-UC schedules the operation of switches, generators, battery energy storage systems, and demand response resources to supply 3-phase unbalanced loads in an islanded microgrid for multiple days. A performance-based CLPU model is developed to estimate additional energy needs of CLPU so that CLPU can be formulated into the traditional 2-stage UC scheduling process. A per-phase demand response budget term is added to the 1st stage UC objective function to meet 3-phase load unbalance limits. To reduce computational complexity in the 1st stage UC, we replace the spanning tree method with a feasible reconfiguration topology list method. The proposed algorithm is developed on a modified IEEE 123-bus system and tested on the real-time simulation testbed using actual load and PV data. Simulation results show that Microgrid-UC successfully accounts for CLPU, phase imbalance, and feeder reconfiguration requirements.

eess.SY

Load Profile Inpainting for Missing Load Data Restoration and Baseline Estimation

This paper introduces a Generative Adversarial Nets (GAN) based, Load Profile Inpainting Network (Load-PIN) for restoring missing load data segments and estimating the baseline for a demand response event. The inputs are time series load data before and after the inpainting period together with explanatory variables (e.g., weather data). We propose a Generator structure consisting of a coarse network and a fine-tuning network. The coarse network provides an initial estimation of the data segment in the inpainting period. The fine-tuning network consists of self-attention blocks and gated convolution layers for adjusting the initial estimations. Loss functions are specially designed for the fine-tuning and the discriminator networks to enhance both the point-to-point accuracy and realisticness of the results. We test the Load-PIN on three real-world data sets for two applications: patching missing data and deriving baselines of conservation voltage reduction (CVR) events. We benchmark the performance of Load-PIN with five existing deep-learning methods. Our simulation results show that, compared with the state-of-the-art methods, Load-PIN can handle varying-length missing data events and achieve 15-30% accuracy improvement.

eess.SP

An Iterative Bidirectional Gradient Boosting Approach for CVR Baseline Estimation

This paper presents a novel Iterative Bidirectional Gradient Boosting Model (IBi-GBM) for estimating the baseline of Conservation Voltage Reduction (CVR) programs. In contrast to many existing methods, we treat CVR baseline estimation as a missing data retrieval problem. The approach involves dividing the load and its corresponding temperature profiles into three periods: pre-CVR, CVR, and post-CVR. To restore the missing load profile during the CVR period, the method employs a three-step process. First, a forward-pass GBM is executed using data from the pre-CVR period as inputs. Subsequently, a backward-pass GBM is applied using data from the post-CVR period. The two restored load profiles are reconciled, considering pre-calculated weights derived from forecasting accuracy, and only the leftmost and rightmost points are retained. The newly restored points are then included as inputs for the subsequent iteration. This iterative procedure continues until the original load data in the CVR period is fully restored. We develop IBi-GBM using actual smart meter and Supervisory Control and Data Acquisition (SCADA) data. Our results demonstrate that IBi-GBM exhibits robust performance across various data resolutions and in different seasons and outperforms existing methods by achieving a 1-2% reduction in normalized Root Mean Square Error (nRMSE).

eess.SY

A TCN-based Hybrid Forecasting Framework for Hours-ahead Utility-scale PV Forecasting

This paper presents a Temporal Convolutional Network (TCN) based hybrid PV forecasting framework for enhancing hours-ahead utility-scale PV forecasting. The hybrid framework consists of two forecasting models: a physics-based trend forecasting (TF) model and a data-driven cloud-event forecasting (CF) model. Three TCNs are integrated in the framework for: i) blending the inputs from different Numerical Weather Prediction sources for the TF model to achieve superior performance on forecasting hourly PV profiles, ii) capturing spatial-temporal correlations between detector sites and the target site in the CF model to achieve more accurate forecast of intra-hour PV power drops, and iii) reconciling TF and CF results to obtain coherent hours-ahead PV forecast with both hourly trends and intra-hour fluctuations well preserved. To automatically identify the most contributive neighboring sites for forming a detector network, a scenario-based correlation analysis method is developed, which significantly improves the capability of the CF model on capturing large power fluctuations caused by cloud movements. The framework is developed, tested, and validated using actual PV data collected from 95 PV farms in North Carolina. Simulation results show that the performance of 6 hours ahead PV power forecasting is improved by approximately 20% compared with state-of-the-art methods.

eess.SP

SA-HMTS: A Secure and Adaptive Hierarchical Multi-timescale Framework for Resilient Load Restoration Using A Community Microgrid

Distribution system integrated community microgrids (CMGs) can partake in restoring loads during extended duration outages. At such times, the CMG is challenged with limited resource availability, absence of robust grid support, and heightened demand-supply uncertainty. This paper proposes a secure and adaptive three-stage hierarchical multi-timescale framework for scheduling and real-time (RT) dispatch of CMGs with hybrid PV systems to address these challenges. The framework enables the CMG to dynamically expand its boundary to support the neighboring grid sections and is adaptive to the changing forecast error impacts. The first stage solves a stochastic extended duration scheduling (EDS) problem to obtain referral plans for optimal resource rationing. The intermediate near-real-time (NRT) scheduling stage updates the EDS schedule closer to the dispatch time using newly obtained forecasts, followed by the RT dispatch stage. To make the dispatch decisions more secure and robust against forecast errors, a novel concept called delayed recourse is proposed. The methodology is evaluated via numerical simulations on a modified IEEE 123-bus system and validated using OpenDSS/hardware-in-loop simulations. The results show superior performance in maximizing load supply and continuous secure CMG operation under numerous operating scenarios.

eess.SY

ProfileSR-GAN: A GAN based Super-Resolution Method for Generating High-Resolution Load Profiles

It is a common practice for utilities to down-sample smart meter measurements from high resolution (e.g. 1-min or 1-sec) to low resolution (e.g. 15-, 30- or 60-min) to lower the data transmission and storage cost. However, down-sampling can remove high-frequency components from time-series load profiles, making them unsuitable for in-depth studies such as quasi-static power flow analysis or non-intrusive load monitoring (NILM). Thus, in this paper, we propose ProfileSR-GAN: a Generative Adversarial Network (GAN) based load profile super-resolution (LPSR) framework for restoring high-frequency components lost through the smoothing effect of the down-sampling process. The LPSR problem is formulated as a Maximum-a-Prior problem. When training the ProfileSR-GAN generator network, to make the generated profiles more realistic, we introduce two new shape-related losses in addition to conventionally used content loss: adversarial loss and feature-matching loss. Moreover, a new set of shape-based evaluation metrics are proposed to evaluate the realisticness of the generated profiles. Simulation results show that ProfileSR-GAN outperforms Mean-Square Loss based methods in all shape-based metrics. The successful application in NILM further demonstrates that ProfileSR-GAN is effective in recovering high-resolution realistic waveforms.

eess.SP

Maximum Power Reference Tracking Algorithm for Power Curtailment of Photovoltaic Systems

This paper presents an algorithm for power curtail-ment of photovoltaic (PV) systems under fast solar irradiance intermittency. Based on the Perturb and Observe (P&O) technique, the method contains an adaptive gain that is compensated in real-time to account for moments of lower power availability. In addition, an accumulator is added to the calculation of the step size to reduce the overshoot caused by large irradiance swings. A testbed of a three-phase single-stage, 500 kVA PV system is developed on the OPAL-RT eMEGAsim real-time simulator. Field irradiance data and a regulation signal from PJM (RTO) are used to compare the performance of the proposed method with other techniques found in the literature. Results indicate an operation with smaller overshoot, less dc-link voltage oscillations, and improved power reference tracking capability.