SearcharxivSearch

arXiv subjects

M. Chorowski

Publications and source records attributed to M. Chorowski.

5 recordsLinked to original sources

Polish national input to the 2026 update of the European Strategy for Particle Physics

The Polish high energy physics (HEP) community fully recognizes the urgent need to host at CERN a flagship project implementing a broad, long-term, and comprehensive vision of particle physics research and pursuing technological advances. Thus, we give preference and declare willingness to actively engage and participate in every aspect of the FCC project (both FCC-ee and FCC-hh), particularly accelerator development, detector construction, theoretical calculations, and physics analyses. As the e+e- Higgs Factory is the top priority for our field, the proposal to build a linear collider facility at CERN, opening up complementary physics prospects, should be considered as the second option. Polish teams declare strong support and are fully committed to contribute to the full exploitation of all aspects of the physics potential of the LHC and the HL-LHC programmes. To ensure the long-term development of particle physics, we also support the continuation of the high-field magnet research programme, as well as investigating other scenarios including, in particular, linear acceleration techniques and new acceleration technologies such as plasma acceleration, the muon collider and Gamma Factory. In addition, CERN should continue to provide support to fixed-target programmes at SPS as well as other non-collider and non-accelerator experiments at CERN. Participation in major projects conducted in and outside Europe should also be fostered. Education, communication, and outreach of particle physics are of paramount importance for the future of our field. An increased effort coordinated at the European level and resources allocated in all Member States are essential to effectively support future large-scale particle physics projects.

hep-ex

PIP-II Linac Cryogenic Distribution System Design Challenges

The PIP-II linac Cryogenic Distribution System (CDS) is characterized by extremely small heat inflows and robust mechanical design. It consists of a Distribution Valve Box (DVB), Intermediate Transfer Line, Tunnel Transfer Line, comprising 25 Bayonet Cans, and ends with a Turnaround Can. Multiple helium streams, each characterized by distinct helium parameters, flow through each of these elements. The CDS geometry allows maintaining an acceptable pressure drop for each helium stream, considering the planned flows and helium parameters in different operation modes. This is particularly crucial for the return line of helium vapors, which return from cryomodules to the cold compressors and thus have very restrictive pressure drop requirements. On both sides of the DVB there are fixed supports for process pipes. One of the DVB design challenges was to route the process pipes in such a way that their shape provided sufficient compensation for thermal shrinkage. This ensures th at the forces resulting from thermal shrinkage acting on the cryogenic valves remain at a level acceptable to the manufacturer. The required thermal budget of the CDS was achieved by thermo-mechanical optimization of its components, like process pipes fixed supports in Bayonet Cans.

physics.acc-ph

Design Parameters and Commissioning of Vertical Inserts Used for Testing the XFEL Superconducting Cavities

The European XFEL is a new research facility currently under construction at DESY in the Hamburg area in Germany. From 2015 on, it will generate extremely intense X-ray flashes that will be used by researchers from all over the world. The superconducting XFEL linear accelerator consists of 100 accelerator modules with more than 800 RF-cavities inside. The accelerator modules, superconducting magnets and cavities will be tested in the accelerator module test facility (AMTF). This paper gives an overview of the design parameters and the commissioning of the vertical insert, used in two cryostats (XATC) of the AMTF-hall. The Insert serves as a holder for 4 nine-cell cavities. This gives the possibility to cool down 4 cavities to 2K in parallel and, consequently, to reduce the testing time. The following RF measurement, selected as quality check, will be done separately for each cavity. Afterwards the cavities will be warmed up again and will be sent to the accelerator module assembly.

physics.acc-ph

The ArDM experiment

The aim of the ArDM project is the development and operation of a one ton double-phase liquid argon detector for direct Dark Matter searches. The detector measures both the scintillation light and the ionization charge from ionizing radiation using two independent readout systems. This paper briefly describes the detector concept and presents preliminary results from the ArDM R&D program, including a 3 l prototype developed to test the charge readout system.

physics.ins-det

The LAGUNA design study- towards giant liquid based underground detectors for neutrino physics and astrophysics and proton decay searches

The feasibility of a next generation neutrino observatory in Europe is being considered within the LAGUNA design study. To accommodate giant neutrino detectors and shield them from cosmic rays, a new very large underground infrastructure is required. Seven potential candidate sites in different parts of Europe and at several distances from CERN are being studied: Boulby (UK), Canfranc (Spain), Fréjus (France/Italy), Pyhäsalmi (Finland), Polkowice-Sieroszowice (Poland), Slanic (Romania) and Umbria (Italy). The design study aims at the comprehensive and coordinated technical assessment of each site, at a coherent cost estimation, and at a prioritization of the sites within the summer 2010.

physics.ins-det