SearcharxivSearch

arXiv subjects

M. Lamont

Publications and source records attributed to M. Lamont.

At least 19 recordsLinked to original sources

Comparative evaluation of future collider options

In anticipation of the completion of the High-Luminosity Large Hadron Collider (HL-LHC) programme by the end of 2041, CERN is preparing to launch a new major facility in the mid-2040s. According to the 2020 update of the European Strategy for Particle Physics (ESPP), the highest-priority next collider is an electron-positron Higgs factory, followed in the longer term by a hadron-hadron collider at the highest achievable energy. The CERN directorate established a Future Colliders Comparative Evaluation working group in June 2023. This group brings together project leaders and domain experts to conduct a consistent evaluation of the Future Circular Collider (FCC) and alternative scenarios based on shared assumptions and standardized criteria. This report presents a comparative evaluation of proposed future collider projects submitted as input for the Update of the European Strategy for Particle Physics. These proposals are compared considering main performance parameters, environmental impact and sustainability, technical maturity, cost of construction and operation, required human resources, and realistic implementation timelines. An overview of the international collider projects within a similar timeframe, notably the CEPC in China and the ILC in Japan is also presented, as well as a short review of the status and prospects of new accelerator techniques.

physics.acc-ph

Summary Report of the Physics Beyond Colliders Study at CERN

The Physics Beyond Collider (PBC) Study Group was initially mandated by the CERN Management to prepare the previous European Particle Physics Strategy Update for CERN projects other than the high-energy frontier colliders. The main findings were summarized in an PBC Summary Report submitted to the Strategy Update. Following the Update process, the PBC Study Group was confirmed on a permanent basis with an updated mandate taking into account the strategy recommendations. The Study Group is now in charge of supporting the proponents of new ideas to address the technical issues and physics motivation of the projects ahead of their review by the CERN Scientific Committees and decision by the Management. The present document updates the previous PBC summary report to inform the new ongoing European Particle Physics Strategy Update process, taking into account the evolution of the CERN and worldwide landscapes and the new projects under consideration within the Study Group.

hep-ex

Snowmass'21 Accelerator Frontier Report

In 2020-2022, extensive discussions and deliberations have taken place in corresponding topical working groups of the Snowmass Accelerator Frontier (AF) and in numerous joint meetings with other Frontiers, Snowmass-wide meetings, a series of Colloquium-style Agoras, cross-Frontier Forums on muon and electron-positron colliders and the collider Implementation Task Force (ITF). The outcomes of these activities are summarized in this Accelerator Frontier report.

physics.acc-ph

Accelerators for Rare Processes and Physics Beyond Colliders: Report of the AF5 Topical Group to Snowmass 2021

This report summarizes the findings of the AF5 Topical Subgroup to Snowmass 2021, which investigated accelerators for rare processes and physics beyond colliders. The report focuses primarily on opportunities for dark sector searches and the need for coordinated development of the Fermilab experimental program for PIP-II and beyond. In addition, a number of other physics opportunities are cataloged and suggestions for synergistic R & D opportunities with various areas of technological development are discussed.

hep-ex

European Strategy for Particle Physics -- Accelerator R&D Roadmap

The 2020 update of the European Strategy for Particle Physics emphasised the importance of an intensified and well-coordinated programme of accelerator R&D, supporting the design and delivery of future particle accelerators in a timely, affordable and sustainable way. This report sets out a roadmap for European accelerator R&D for the next five to ten years, covering five topical areas identified in the Strategy update. The R&D objectives include: improvement of the performance and cost-performance of magnet and radio-frequency acceleration systems; investigations of the potential of laser / plasma acceleration and energy-recovery linac techniques; and development of new concepts for muon beams and muon colliders. The goal of the roadmap is to document the collective view of the field on the next steps for the R&D programme, and to provide the evidence base to support subsequent decisions on prioritisation, resourcing and implementation.

physics.acc-ph

Storage Ring to Search for Electric Dipole Moments of Charged Particles -- Feasibility Study

The proposed method exploits charged particles confined as a storage ring beam (proton, deuteron, possibly $^3$He) to search for an intrinsic electric dipole moment (EDM) aligned along the particle spin axis. Statistical sensitivities could approach 10$^{-29}$ e$\cdot$cm. The challenge will be to reduce systematic errors to similar levels. The ring will be adjusted to preserve the spin polarisation, initially parallel to the particle velocity, for times in excess of 15 minutes. Large radial electric fields, acting through the EDM, will rotate the polarisation from the longitudinal to the vertical direction. The slow rise in the vertical polarisation component, detected through scattering from a target, signals the EDM. The project strategy is outlined. A stepwise plan is foreseen, starting with ongoing COSY activities that demonstrate technical feasibility. Achievements to date include reduced polarization measurement errors, long horizontal plane polarization lifetimes, and control of the polarization direction through feedback from scattering measurements. The project continues with a proof-of-capability measurement (precursor experiment; first direct deuteron EDM measurement), an intermediate prototype ring (proof-of-principle; demonstrator for key technologies), and finally a high-precision electric-field storage ring.

hep-ex

A primary electron beam facility at CERN -- eSPS Conceptual design report

The design of a primary electron beam facility at CERN is described. The study has been carried out within the framework of the wider Physics Beyond Colliders study. It re-enables the Super Proton Synchrotron (SPS) as an electron accelerator, and leverages the development invested in Compact Linear Collider (CLIC) technology for its injector and as an accelerator research and development infrastructure. The facility would be relevant for several of the key priorities in the 2020 update of the European Strategy for Particle Physics, such as an electron-positron Higgs factory, accelerator R\&D, dark sector physics, and neutrino physics. In addition, it could serve experiments in nuclear physics. The electron beam delivered by this facility would provide access to light dark matter production significantly beyond the targets predicted by a thermal dark matter origin, and for natures of dark matter particles that are not accessible by direct detection experiments. It would also enable electro-nuclear measurements crucial for precise modelling the energy dependence of neutrino-nucleus interactions, which is needed to precisely measure neutrino oscillations as a function of energy. The implementation of the facility is the natural next step in the development of X-band high-gradient acceleration technology, a key technology for compact and cost-effective electron/positron linacs. It would also become the only facility with multi-GeV drive bunches and truly independent electron witness bunches for plasma wakefield acceleration. A second phase capable to deliver positron witness bunches would make it a complete facility for plasma wakefield collider studies. [...]

physics.acc-ph

SPS Beam Dump Facility -- Comprehensive Design Study

The proposed Beam Dump Facility (BDF) is foreseen to be located at the North Area of the SPS. It is designed to be able to serve both beam dump like and fixed target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector models, and flavour physics measurements. In the first instance, exploitation of the facility, in beam dump mode, is envisaged to be for the Search for Hidden Particle (SHiP) experiment. Following the first evaluation of the BDF in 2014-2016, CERN management launched a Comprehensive Design Study over three years for the facility. The BDF study team has since executed an in-depth feasibility study of proton delivery to target, the target complex, and the underground experimental area, including prototyping of key sub-systems and evaluations of the radiological aspects and safety. A first iteration of detailed integration and civil engineering studies have been performed in order to produce a realistic schedule and cost. This document gives a detailed overview of the proposed facility together with the results of the studies, and draws up a possible road map for a three-year Technical Design Report phase, followed by a 5 to 6 year construction phase.

physics.acc-ph

Beam impact tests of a prototype target for the Beam Dump Facility at CERN: experimental setup and preliminary analysis of the online results

The Beam Dump Facility (BDF) is a project for a new facility at CERN dedicated to high intensity beam dump and fixed target experiments. Currently in its design phase, the first aim of the facility is to search for Light Dark Matter and Hidden Sector models with the Search for Hidden Particles (SHiP) experiment. At the core of the facility sits a dense target/dump, whose function is to absorb safely the 400 GeV/c Super Proton Synchrotron (SPS) beam and to maximize the production of charm and beauty mesons. An average power of 300 kW will be deposited on the target, which will be subjected to unprecedented conditions in terms of temperature, structural loads and irradiation. In order to provide a representative validation of the target design, a prototype target has been designed, manufactured and tested under the SPS fixed-target proton beam during 2018, up to an average beam power of 50 kW, corresponding to 350 kJ per pulse. The present contribution details the target prototype design and experimental setup, as well as a first evaluation of the measurements performed during beam irradiation. The analysis of the collected data suggests that a representative reproduction of the operational conditions of the Beam Dump Facility target was achieved during the prototype tests, which will be complemented by a Post Irradiation Examination campaign during 2020.

physics.ins-det

Design of a Helium Passivation System for the Target Vessel of the Beam Dump Facility at CERN

The Beam Dump Facility (BDF) is a proposed general-purpose facility at CERN, dedicated to fixed target and beam dump experiments, currently being developed in the context of the Physics Beyond Colliders program. The design of the facility will allow to host different types of experiments, of which SHiP is planned to be the initial one. The core of the facility is a high-density target/dump absorbing the full intensity of the SPS beam and generating a cascade of particles that are detected downstream the target complex. The target and its shielding blocks are positioned inside a vessel, which is planned to be passivized with helium, in order to reduce the activation of the gas surrounding the target and to extend the operational life of materials and equipment. The passivation system that will be in charge of purifying and circulating the helium is a critical component for the operation of the facility. Fluid dynamics simulations have been performed to study the circulation of the helium through the vessel. A detailed design of the helium passivation system and its main components has been developed.

physics.ins-det

Design of a high power production target for the Beam Dump Facility at CERN

The Beam Dump Facility (BDF) project is a proposed general-purpose facility at CERN, dedicated to beam dump and fixed target experiments. In its initial phase, the facility is foreseen to be exploited by the Search for Hidden Particles (SHiP) experiment. Physics requirements call for a pulsed 400 GeV/c proton beam as well as the highest possible number of protons on target (POT) each year of operation, in order to search for feebly interacting particles. The target/dump assembly lies at the heart of the facility, with the aim of safely absorbing the full high intensity Super Proton Synchrotron (SPS) beam, while maximizing the production of charmed and beauty mesons. High-Z materials are required for the target/dump, in order to have the shortest possible absorber and reduce muon background for the downstream experiment. The high average power deposited on target (305 kW) creates a challenge for heat removal. During the BDF facility Comprehensive Design Study (CDS), launched by CERN in 2016, extensive studies have been carried out in order to define and assess the target assembly design. These studies are described in the present contribution, which details the proposed design of the BDF production target, as well as the material selection process and the optimization of the target configuration and beam dilution. One of the specific challenges and novelty of this work is the need to consider new target materials, such as a molybdenum alloy (TZM) as core absorbing material and Ta2.5W as cladding. Thermo-structural and fluid dynamics calculations have been performed to evaluate the reliability of the target and its cooling system under beam operation. In the framework of the target comprehensive design, a preliminary mechanical design of the full target assembly has also been carried out, assessing the feasibility of the whole target system.

physics.ins-det

Gamma Factory at CERN -- novel research tools made of light

We discuss the possibility of creating novel research tools by producing and storing highly relativistic beams of highly ionised atoms in the CERN accelerator complex, and by exciting their atomic degrees of freedom with lasers to produce high-energy photon beams. Intensity of such photon beams would be by several orders of magnitude higher than offered by the presently operating light sources, in the particularly interesting gamma-ray energy domain of 0.1-400 MeV. In this energy range, the high-intensity photon beams can be used to produce secondary beams of polarised electrons, polarised positrons, polarised muons, neutrinos, neutrons and radioactive ions. New research opportunities in a wide domain of fundamental and applied physics can be opened by the Gamma Factory scientific programme based on the above primary and secondary beams.

physics.acc-ph

Design Development for the Beam Dump Facility Target Complex at CERN

CERN has launched a study phase to evaluate the feasibility of a new high-intensity beam dump facility at the CERN Super Proton Synchrotron accelerator with the primary goal of exploring Hidden Sector models and searching for Light Dark Matter, but which also offers opportunities for other fixed target flavour physics programs such as rare tau lepton decays and tau neutrino studies. The new facility will require - among other infrastructure - a target complex in which a dense target/dump will be installed, capable of absorbing the entire energy of the beam extracted from the SPS accelerator. In theory, the target/dump could produce very weakly interacting particles, to be investigated by a suite of particle detectors to be located downstream of the target complex. As part of the study, a development design of the target complex has been produced, taking into account the handling and remote handling operations needed through the lifetime of the facility. Two different handling concepts have been studied and both resulting designs are presented.

physics.ins-det

Physics Beyond Colliders at CERN: Beyond the Standard Model Working Group Report

The Physics Beyond Colliders initiative is an exploratory study aimed at exploiting the full scientific potential of the CERN's accelerator complex and scientific infrastructures through projects complementary to the LHC and other possible future colliders. These projects will target fundamental physics questions in modern particle physics. This document presents the status of the proposals presented in the framework of the Beyond the Standard Model physics working group, and explore their physics reach and the impact that CERN could have in the next 10-20 years on the international landscape.

hep-ex

Summary Report of Physics Beyond Colliders at CERN

Physics Beyond Colliders is an exploratory study aimed at exploiting the full scientific potential of CERN's accelerator complex and its scientific infrastructure in the next two decades through projects complementary to the LHC, HL-LHC and other possible future colliders. These projects should target fundamental physics questions that are similar in spirit to those addressed by high-energy colliders, but that require different types of beams and experiments. A kick-off workshop held in September 2016 identified a number of areas of interest and working groups have been set-up to study and develop these directions. All projects currently under consideration are presented including physics motivation, a brief outline of the experimental set-up and the status of the corresponding beam and detector technological studies. The proposals are also put in context of the worldwide landscape and their implementation issues are discussed.

hep-ex

Feasibility Study for an EDM Storage Ring

This project exploits charged particles confined as a storage ring beam (proton, deuteron, possibly $^3$He) to search for an intrinsic electric dipole moment (EDM, $\vec d$) aligned along the particle spin axis. Statistical sensitivities can approach $10^{-29}$~e$\cdot$cm. The challenge will be to reduce systematic errors to similar levels. The ring will be adjusted to preserve the spin polarization, initially parallel to the particle velocity, for times in excess of 15 minutes. Large radial electric fields, acting through the EDM, will rotate the polarization ($\vec d \times\vec E$). The slow rise in the vertical polarization component, detected through scattering from a target, signals the EDM. The project strategy is outlined. It foresees a step-wise plan, starting with ongoing COSY activities that demonstrate technical feasibility. Achievements to date include reduced polarization measurement errors, long horizontal-plane polarization lifetimes, and control of the polarization direction through feedback from the scattering measurements. The project continues with a proof-of-capability measurement (precursor experiment; first direct deuteron EDM measurement), an intermediate prototype ring (proof-of-principle; demonstrator for key technologies), and finally the high precision electric-field storage ring.

physics.acc-ph

Parametric gain and wavelength conversion via third order nonlinear optics a CMOS compatible waveguide

We demonstrate sub-picosecond wavelength conversion in the C-band via four wave mixing in a 45cm long high index doped silica spiral waveguide. We achieve an on/off conversion efficiency (signal to idler) of +16.5dB as well as a parametric gain of +15dB for a peak pump power of 38W over a wavelength range of 100nm. Furthermore, we demonstrated a minimum gain of +5dB over a wavelength range as large as 200nm.

physics.optics

Commissioning and Operation

Chapter 16 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community of about 7,000 scientists working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will need a major upgrade in the 2020s. This will increase its luminosity (rate of collisions) by a factor of five beyond the original design value and the integrated luminosity (total collisions created) by a factor ten. The LHC is already a highly complex and exquisitely optimised machine so this upgrade must be carefully conceived and will require about ten years to implement. The new configuration, known as High Luminosity LHC (HL-LHC), will rely on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11-12 tesla superconducting magnets, compact superconducting cavities for beam rotation with ultra-precise phase control, new technology and physical processes for beam collimation and 300 metre-long high-power superconducting links with negligible energy dissipation. The present document describes the technologies and components that will be used to realise the project and is intended to serve as the basis for the detailed engineering design of HL-LHC.

physics.acc-ph