SearcharxivSearch

arXiv subjects

M. R. Jones

Publications and source records attributed to M. R. Jones.

3 recordsLinked to original sources

Latent variable models for simultaneous EOV identification and removal in population-based SHM

The robust treatment of environmental and operational variability (EOV) is an open challenge in population-based structural health monitoring (PBSHM). The difficulty is compounded in the case that the EOV signals are unmeasured. A common approach in conventional SHM is to apply \emph{projection-based} methods that discard subspaces of healthy feature data, reasoning that the EOV signal dominates the variance of the measured features. However, a common pitfall of projection-based approaches is that when damage acts close to the same variance-dominant direction, damage sensitivity is removed along with the EOV. An alternative identifying assumption for the removal of particular unmeasured EOVs is slowness; the latent EOV process is characterised by its long temporal correlation. In this paper, the latent EOV is cast as a state-space Gaussian process, enabling tractable $\mathcal{O}(T)$ inference via a Kalman filter. A robust hierarchical Bayesian identification framework is developed that enables population-level identification of latent EOVs and EOV-free residual features, using a Laplace approximation. The approach is first validated on a single laboratory-scale benchmark structure from the literature, subject to thermal EOVs, demonstrating robust damage detection and EOV recovery. The method is then applied to a simulated nine-turbine offshore wind farm with staggered deployment and damage, where it delivers a substantial true-positive uplift over projection and cointegration-based baselines at matched false-positive rates.

eess.SP

A probabilistic approach for acoustic emission based monitoring techniques: with application to structural health monitoring

It has been demonstrated that acoustic-emission (AE), inspection of structures can offer advantages over other types of monitoring techniques in the detection of damage; namely, an increased sensitivity to damage, as well as an ability to localise its source. There are, however, numerous challenges associated with the analysis of AE data. One issue is the high sampling frequencies required to capture AE activity. In just a few seconds, a recording can generate very high volumes of data, of which a significant portion may be of little interest for analysis. Identifying the individual AE events in a recorded time-series is therefore a necessary procedure to reduce the size of the dataset. Another challenge that is also generally encountered in practice, is determining the sources of AE, which is an important exercise if one wishes to enhance the quality of the diagnostic scheme. In this paper, a state-of-the-art technique is presented that can automatically identify AE events, and simultaneously help in their characterisation from a probabilistic perspective. A nonparametric Bayesian approach, based on the Dirichlet process (DP), is employed to overcome some of the challenges associated with these tasks. Two main sets of AE data are considered in this work: (1) from a journal bearing in operation, and (2) from an Airbus A320 main landing gear subjected to fatigue testing.

stat.AP

Physically Meaningful Uncertainty Quantification in Probabilistic Wind Turbine Power Curve Models as a Damage Sensitive Feature

A wind turbines' power curve is easily accessible damage sensitive data, and as such is a key part of structural health monitoring in wind turbines. Power curve models can be constructed in a number of ways, but the authors argue that probabilistic methods carry inherent benefits in this use case, such as uncertainty quantification and allowing uncertainty propagation analysis. Many probabilistic power curve models have a key limitation in that they are not physically meaningful - they return mean and uncertainty predictions outside of what is physically possible (the maximum and minimum power outputs of the wind turbine). This paper investigates the use of two bounded Gaussian Processes in order to produce physically meaningful probabilistic power curve models. The first model investigated was a warped heteroscedastic Gaussian process, and was found to be ineffective due to specific shortcomings of the Gaussian Process in relation to the warping function. The second model - an approximated Gaussian Process with a Beta likelihood was highly successful and demonstrated that a working bounded probabilistic model results in better predictive uncertainty than a corresponding unbounded one without meaningful loss in predictive accuracy. Such a bounded model thus offers increased accuracy for performance monitoring and increased operator confidence in the model due to guaranteed physical plausibility.

cs.LG