SearcharxivSearch

arXiv subjects

Michael Sheehan

Publications and source records attributed to Michael Sheehan.

2 recordsLinked to original sources

Horizon-Aware Forecasting of Passenger Assistance Demand for Rail Station Workforce Planning

Passenger assistance services are essential for accessible rail travel, yet demand varies substantially across stations and over time, creating challenges for workforce planning and staff rostering. This paper presents a data-driven decision support framework for forecasting station-level passenger assistance demand and translating forecasts into workforce plans. The forecasting component applies a horizon-aware Prophet modelling approach using multi-source operational data, while the planning component maps demand forecasts to staffing requirements under service and operational constraints through an interpretable red-amber-green risk framework. The approach has been implemented within a production-grade system to support routine planning and staffing decisions across LNER-managed stations. Results demonstrate improved forecast accuracy relative to year-on-year baseline methods, with absolute error reduced by up to 76.9%, and show that forecast-informed staffing is associated with an approximate 50% reduction in failed passenger assistance deliveries attributable to staff availability. These findings highlight the value of integrating interpretable forecasting with operational work.

stat.AP

Gemini multi-conjugate adaptive optics system review I: Design, trade-offs and integration

The Gemini Multi-conjugate adaptive optics System (GeMS) at the Gemini South telescope in Cerro Pach{\'o}n is the first sodium-based multi-Laser Guide Star (LGS) adaptive optics system. It uses five LGSs and two deformable mirrors to measure and compensate for atmospheric distortions. The GeMS project started in 1999, and saw first light in 2011. It is now in regular operation, producing images close to the diffraction limit in the near infrared, with uniform quality over a field of view of two square arcminutes. The present paper (I) is the first one in a two-paper review of GeMS. It describes the system, explains why and how it was built, discusses the design choices and trade-offs, and presents the main issues encountered during the course of the project. Finally, we briefly present the results of the system first light.

astro-ph.IM