Mokhtar Bozorg

Publications and source records attributed to Mokhtar Bozorg.

4 recordsLinked to original sources

Optimal wind farm energy and reserve scheduling incorporating wake interactions

This paper proposes a novel approach for optimal energy and reserve scheduling of wind farms by explicitly modelling wake interactions to enhance market participation and operational efficiency. Conventional methods often neglect wake effects, relying on power curve estimations that represent an upper limit and reduce market performance. To address this, a two-stage stochastic programming framework is developed, integrating a wake-aware power estimation model within the FLORIS simulation software. Wind and reserve uncertainties are addressed through scenario generation and reduction, enabling wind power producers to optimise participation in day-ahead energy and ancillary services markets, with particular focus on the Frequency Restoration Reserve (FRR). The wake-aware model provides more realistic power output predictions based on site-specific wind and atmospheric conditions, improving scheduling accuracy and reducing imbalance penalties. Wake steering is further employed to mitigate wake-induced losses and increase income through participation in ancillary services. The proposed approach is evaluated through a case study of the London Array offshore wind farm participating in the Great Britain (GB) electricity markets. Results show that conventional methods estimate production 12-13% higher, leading to imbalance penalties and 3% lower revenue compared with the wake-aware approach accounting for wake interactions. Moreover, the steering-enhanced approach yields an additional 1-2% increase in income relative to the wake-aware baseline. These findings underscore the value of accounting for wake interactions in wind farm scheduling and demonstrate the economic and operational benefits of active wake management, offering insights for improving grid stability and profitability as wind penetration continues to rise.

physics.flu-dyn

A Flow-based Distributed Trading Mechanism in Regional Electricity Market with Energy Hub

The concept of Energy Hub (EH) has been emerged to accommodate renewable energy sources in a multi-energy system to deploy the synergies between electricity and other energy sources. However, the market mechanisms for the integration of the EHs into the energy markets are not sufficiently elaborated. This paper proposes a flow-based two-level distributed trading mechanism in the regional electricity market with EH. At the lower level, the regional system operator coordinates the regional grids transactions in two markets, the local energy market with EH and the wholesale market of the upstream grid. Every nodal agent as an independent stakeholder leverages price discrepancy to cross arbitrage from different markets. At the upper level, the EH is a third player intending to maximize profit from trading in the regional electricity market and gas market. The regional electricity market clearing problem is formulated as a mathematical program with equilibrium constraints, for which we develop an ADMM-based distributed algorithm to obtain the equilibrium solution. The DC power flow is decomposed into optimization problems for the regional system operator and agents at different nodes, which can be solved in a distributed manner to achieve global optimality without violating the privacy of players. Case studies based on a realistic regional grid verify the effectiveness of the proposed algorithm and show that the mechanism is effective in decomposing power flow and increasing energy efficiency.

math.OC

Greedy Placement of Measurement Devices on Distribution Grids based on Enhanced Distflow State Estimation

The needs for improving observability of medium and low voltage distribution networks has been significantly increased, in recent year. In this paper, we focus on practical approaches for placement of affordable Measurement Devices (MDs), which are providing three phases voltage, current, and power measurements with certain level of precision. The placement procedure is composed of a state-estimation algorithm and of a greedy placement scheme. The proposed state-estimation algorithm is based on the Distflow model, enhanced to consider the shunt elements (e.g., cable capacitances) of the network, which are not negligible in low voltage networks with underground cables. The greedy placement scheme is formulated such that it finds the location of minimum required number of MDs while certain grid observability limits are satisfied. These limits are defined as the accuracy of state-estimation results in terms of voltage magnitudes and line currents over all nodes and lines, respectively. The effectiveness of the proposed placement procedure has been validated on a realistic test grid of 10 medium voltage nodes and 75 low voltage nodes, whose topology and parameters were made available from the Distribution System Operator (DSO) of the city of Geneva, Switzerland.

math.OC

Dispatch and Primary Frequency Control with Electrochemical Storage: a System-wise Verification

Uncertainty levels in forecasting of renewable generation and demand are known to affect the amount of reserve required to operate the power grid with a given level of reliability. In this paper, we quantify the effects on the system reserve and reliability, due to the local dispatch of stochastic demand and renewable generation. The analysis is performed considering the model of the IEEE 39-bus system, with detailed dynamic models of conventional generation, wind generation, demand and an under-frequency load shedding mechanism. The analysis compares to cases: the base case, where renewable generation and demand power are stochastic and the power reserve is provided by conventional generation, against the case where the operation of traditionally stochastic resources is dispatched according to pre-established dispatch plans thanks to controlling local flexibility. Simulations reproduce the post-contingency dynamic behavior of the grid due to outages of generators. The contingencies are selected to trigger under frequency load shedding mechanisms, hence to demonstrate the different levels of system operation reliability for the two case studies. Simulation results show that dispatching traditionally stochastic generation scores better regarding to expected energy not served, producing an increase of the system reliability.

eess.SP