SearcharxivSearch

arXiv subjects

N. Ellis

Publications and source records attributed to N. Ellis.

5 recordsLinked to original sources

CentOS Linux for the ATLAS MUCTPI Upgrade

A new Muon-to-Central-Trigger Processor Interface (MUCTPI) was built as part of the upgrade of the ATLAS Level-1 trigger system for the next Run of the Large Hadron Collider at CERN. The MUCTPI has 208 high-speed optical serial links for receiving muon candidates from the muon trigger detectors. Three high-end FPGAs are used for real-time processing of the muon candidates, for sending trigger information to other parts of the trigger system, and for sending summary information to the data acquisition and monitoring system. A System-on-Chip (SoC) is used for the control, configuration and monitoring of the hardware and the operation of the MUCTPI. The SoC consists of an FPGA part and a processor system. The FPGA part provides communication with the processing FPGAs, while the processor system runs software for communication with the run-control system of the ATLAS experiment. In this paper we will describe our experience with running CentOS Linux on the SoC. Cross-compilation together with the existing framework for building of the ATLAS trigger and data acquisition (TDAQ) software is being used in order to allow the deployment of the TDAQ software directly on the SoC.

physics.ins-det

Trigger and data acquisition

The lectures address some of the issues of triggering and data acquisition in large high-energy physics experiments. Emphasis is placed on hadron-collider experiments that present a particularly challenging environment for event selection and data collection. However, the lectures also explain how T/DAQ systems have evolved over the years to meet new challenges. Some examples are given from early experience with LHC T/DAQ systems during the 2008 single-beam operations.

physics.ins-det

A configuration system for the ATLAS trigger

The ATLAS detector at CERN's Large Hadron Collider will be exposed to proton-proton collisions from beams crossing at 40 MHz that have to be reduced to the few 100 Hz allowed by the storage systems. A three-level trigger system has been designed to achieve this goal. We describe the configuration system under construction for the ATLAS trigger chain. It provides the trigger system with all the parameters required for decision taking and to record its history. The same system configures the event reconstruction, Monte Carlo simulation and data analysis, and provides tools for accessing and manipulating the configuration data in all contexts.

physics.ins-det

Bottom Production

We review the prospects for bottom production physics at the LHC.

hep-ph