Gridded RF Gun Design for SRF Linac Applications

The thermionic gridded gun is described which generates short electron bunches for further acceleration in a Nb3Sn conduction cooled SRF linac. The gun is built into the first cavity of the 250 keV injector [1] for the 20 kW, 10 MeV, 1.3 GHz CW conduction cooled one-cavity linac. The beam current is 2 mA. The RF gun design is presented as well as the results of perveance measurements, which are in a good agreement with the design parameters. The design of the RF resonator of the gun is presented also. The beam generated by the gun is matched to the injector to provide lack of current interception in the SRF cavity.

physics.acc-ph

Beam Dynamics simulations for ERDC project -- SRF linac for industrial use

Compact conductively cooled SRF industrial linacs can provide unique parameters of the electron beam for industrial applications. (up to 10MeV, 1MW). For ERDC project we designed normal conducting RF injector with thermal RF gridded gun integrated in first cell of multi-cell cavities. For design of the RF gun we used MICHELLE software to simulate and optimize parameters of the beam. Output file was converted to ASTRA format and most beam dynamic simulations in multi-cell normal conducting cavity and cryomodule were performed by using ASTRA software. For cross-checking we compare results of MICHELLE and AS-TRA in first few cells. At the end of injector beam reach ~250keV energy which allow to trap bunch in acceleration regime without losses in TESLA like 1.3 GHz cavity. Short solenoid at the end of injector allow to regulate transverse beam size in cryomodule to match beam to extraction system and also reduce charge losses in accelerator.

physics.acc-ph

Performance of PIP-II High-beta 650 Cryomodule After Transatlantic Shipping

After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may have arisen from the transport of the cryomodule. While measurements taken at room temperature after the conclusion of shipment indicated that there were no negative impacts on cavity alignment, beamline vacuum, or cavity frequency, testing at 2K was required to validate other aspects such as tuner operation, cavity coupling, cryogenic system integrity, and cavity performance. Results of this latest round of limited 2K testing will be presented.

physics.acc-ph

Design, Manufacturing, Assembly, and Lessons Learned of the Pre-production 325 MHz Couplers for the PIP-II Project at Fermilab

Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were procured by both Fermilab and IJCLAB for this effort. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life cycle, including design, manufacturing, and assembly, along with the lessons learned at each stage.

physics.acc-ph

Transportation Fatigue Testing of the pHB650 Power Coupler Antenna for the PIP-II Project at Fermilab

The PIP-II Project will see international shipment of cryomodules from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the internal components. Of particular concern is the coupler ceramic window and surrounding brazes, which will see stresses during an excitation event. Since the antenna design is new, and because of the setback failure would create, a cyclic stress test was devised for the antenna. This paper presents the experimental methods, setup, and results of the test.

physics.acc-ph

Design, Manufacturing, Assembly, Testing, And Lessons Learned Of The Prototype 650 Mhz Couplers

Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning, and the lessons learned at each stage.

physics.acc-ph

An 8 GEV Linac As The Booster Replacement In The Fermilab Power Upgrade

Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or MI The new linac takes ~1 GeV beam from the PIP-II linac and accelerates it to ~ 2 GeV in a 650 MHz SRF linac, and then accelerates to ~8 GeV in an SRF pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. This Booster Replacement linac (BRL) will increase MI beam power to DUNE to more than 2.5 MW and enable next-generation intensity frontier experiments.

physics.acc-ph

Key directions for research and development of superconducting radio frequency cavities

Radio frequency superconductivity is a cornerstone technology for many future HEP particle accelerators and experiments from colliders to proton drivers for neutrino facilities to searches for dark matter. While the performance of superconducting RF (SRF) cavities has improved significantly over the last decades, and the SRF technology has enabled new applications, the proposed HEP facilities and experiments pose new challenges. To address these challenges, the field continues to generate new ideas and there seems to be a vast room for improvements. In this paper we discuss the key research directions that are aligned with and address the future HEP needs.

physics.acc-ph

Future Collider Options for the US

The United States has a rich history in high energy particle accelerators and colliders -- both lepton and hadron machines, which have enabled several major discoveries in elementary particle physics. To ensure continued progress in the field, U.S. leadership as a key partner in building next generation collider facilities abroad is essential; also critically important is the exploring of options to host a future collider in the U.S. The "Snowmass" study and the subsequent Particle Physics Project Prioritization Panel (P5) process provide the timely opportunity to develop strategies for both. What we do now will shape the future of our field and whether the U.S. will remain a world leader in these areas. In this white paper, we briefly discuss the US engagement in proposed collider projects abroad and describe future collider options for the U.S. We also call for initiating an integrated R\&D program for future colliders.

hep-ex

An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade: a Snowmass 2021 White Paper

Following the PIP-II 800 MeV Linac, Fermilab will need an accelerator that extends from that linac to the MI injection energy of ~8 GeV, completing the modernization of the Fermilab high-intensity accelerator complex. This will maximize the beam available for neutrino production for the long baseline DUNE experiment to greater than 2.5 MW and enable a next generation of intensity frontier experiments. In this white paper, we propose an 8 GeV Linac for that purpose. The Linac consists of an extension of the PIP-II Linac to ~2 GeV using PIP-II 650 MHz SRF cryomodules, followed by a 2 -->8.0 GeV Linac composed of 1300 MHz SRF cryomodules, based upon the LCLS-II cryomodules developed at Fermilab. The 8 GeV Linac will incorporate recent improvements in SRF technology. The research needed to implement this Linac is described.

physics.acc-ph

Design of a medium energy, high average power superconducting e-beam accelerator for environmental applications

We present the technical and engineering design of a medium energy (10 MeV) and high average power (1 MW) electron beam accelerator intended for irradiation treatment of high volume industrial and municipal wastewater. The accelerator uses superconducting radiofrequency (SRF) cavity technology for producing the high average beam power with $>$90% RF to beam efficiency. The design of the accelerator is simplified and tailored for industrial settings by adopting the cryocooler conduction-cooling technique for the SRF cavity instead of a conventional liquid helium bath cryo-system. The technical design is supplemented with a detailed analysis of capital and operating cost of the accelerator. The designed accelerator can treat up to 12 million gallons per day of wastewater, requires capital of $\sim\$$8M for construction, and has $\sim$13.5 cents/ton/kGy in material processing cost.

physics.acc-ph

LCLS-II-HE verification cryomodule high gradient performance and quench behavior

An 8-cavity, 1.3 GHz, LCLS-II-HE cryomodule was assembled and tested at Fermilab to verify performance before the start of production. Its cavities were processed with a novel nitrogen doping treatment to improve gradient performance. The cryomodule was tested with a modified protocol to process sporadic quenches, which were observed in LCLS-II production cryomodules and are attributed to multipacting. Dedicated vertical test experiments support the attribution to multipacting. The verification cryomodule achieved an acceleration voltage of 200 MV in continuous wave mode, corresponding to an average accelerating gradient of 24.1 MV/m, significantly exceeding the specification of 173 MV. The average Q0 (3.0x10^10) also exceeded its specification (2.7x10^10). After processing, no field emission was observed up to the maximum gradient of each cavity. This paper reviews the cryomodule performance and discusses operational issues and mitigations implemented during the several month program.

physics.acc-ph

Ring-Based Electron Cooling System for the EIC

This report describes a concept of an EIC cooling system, based on a proven induction linac technology with a dc electron beam. The system would operate in a full energy range of proton beams (100 - 270 GeV) and would provide 50-100 A electron beams, circulating in a cooler ring for 5 ms. Every 5 ms a new electron pulse would be injected into the cooler ring to provide continuous cooling at collisions. Operations with a 10-ms cycle is possible but it will reduce the cooling rates by ~30$\%$. The system is capable of delivering the required performance in the entire EIC energy range with emittance cooling times of less than 1-2 hours.

physics.acc-ph

Achievement of Ultra-High Quality Factor in Prototype Cryomodule for LCLS-II

Quality factor is a primary cost driver for high energy, continuous wave (CW) SRF linacs like the LCLS-II X-ray free electron laser currently under construction. Taking this into account, several innovations were introduced in the LCLS-II cryomodule design to push substantially beyond the previous state-of-the-art quality factor achieved in operation. This includes the first ever implementation of the nitrogen doping cavity treatment, the capability to provide high mass flow cooldown to improve expulsion of magnetic flux based on recent R&D, high performance magnetic shielding, and other critical subcomponents. To evaluate the implementation of these new cryomodule features, two prototype cryomodules were produced. In this paper, we present results from the prototype cryomodule assembled at Fermilab, which achieved unprecedented cavity quality factors of 3.0e10 at a nominal cryomodule voltage. We overview cavity performance, procedures to achieve ambient magnetic field < 5 mG at the cavity wall, and the successful demonstration of high mass flow cooldown in a cryomodule. The cavity performance under various cool down conditions are presented as well to show the impact of flux expulsion on Q0.

physics.acc-ph

The Role of Magnetic Flux Expulsion to Reach Q0>3x10^10 in SRF Cryomodules

When a superconducting radiofrequency cavity is cooled through its critical temperature, ambient magnetic flux can become "frozen in" to the superconductor, resulting in degradation of the quality factor. This is especially problematic in applications where quality factor is a cost driver, such as in the CW linac for LCLS-II. Previously, it had been unknown how to prevent flux from being trapped during cooldown in bulk niobium cavities, but recent R&D studies showed near-full flux expulsion can be achieved through high temperature heat treatment and cooling cavities through the superconducting transition with a spatial thermal gradient over the surface. In this paper, we describe the first accelerator implementation of these procedures, in cryomodules that are currently being produced for LCLS-II. We compare the performance of cavities under different conditions of heat treatment and thermal gradient during cooldown, showing a substantial improvement in performance when both are applied, enabling cryomodules to reach and, in many cases, exceed a Q0 of ~3x10^10.

physics.acc-ph

Commissioning And First Results From The Fermilab Cryomodule Test Stand

A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.

physics.acc-ph

Initial Beam Dynamics Simulations of a High-Average-Current Field-Emission Electron Source in a Superconducting RadioFrequency Gun

High-power electron beams are sought-after tools in support to a wide array of societal applications. This paper investigates the production of high-power electron beams by combining a high-current field-emission electron source to a superconducting radio-frequency (SRF) cavity. We especially carry out beam-dynamics simulations that demonstrate the viability of the scheme to form $\sim$ 300 kW average-power electron beam using a 1+1/2-cell SRF gun.

physics.acc-ph

Analysis and Measurement of the Transfer Matrix of a 9-cell 1.3-GHz Superconducting Cavity

Superconducting linacs are capable of producing intense, stable, high-quality electron beams that have found widespread applications in science and industry. The 9-cell 1.3-GHz superconducting standing-wave accelerating RF cavity originally developed for $e^+/e^-$ linear-collider applications [B. Aunes, {\em et al.} Phys. Rev. ST Accel. Beams {\bf 3}, 092001 (2000)] has been broadly employed in various superconducting-linac designs. In this paper we discuss the transfer matrix of such a cavity and present its measurement performed at the Fermilab Accelerator Science and Technology (FAST) facility. The experimental results are found to be in agreement with analytical calculations and numerical simulations.

physics.acc-ph