Bayesian-Monte Carlo Schedule Updating for Construction Digital Twins: A Probabilistic Framework for Dynamic Project Forecasting

Construction projects frequently experience schedule delays and forecasting uncertainty due to variability in labor productivity, material availability, weather conditions, and project coordination. Conventional deterministic scheduling methods such as the Critical Path Method (CPM) assume fixed activity durations and therefore cannot adequately represent dynamic project uncertainty. This study presents a Bayesian-Monte Carlo probabilistic schedule updating framework for construction digital twin environments. The proposed methodology integrates stochastic activity-duration modeling, Bayesian recursive updating, Monte Carlo simulation, and uncertainty propagation within a unified computational framework for adaptive schedule forecasting. Activity durations are modeled using lognormal probability distributions and continuously updated through Bayesian inference as new project observations become available. Monte Carlo simulation is then used to propagate updated uncertainty throughout project networks and generate probabilistic completion-time forecasts, delay-risk estimates, and activity criticality measures. Simulation experiments using PSPLIB benchmark project networks demonstrate that the proposed framework improves forecasting accuracy and uncertainty representation compared with deterministic CPM and static probabilistic scheduling approaches. The framework further supports adaptive project forecasting through integration of BIM reports, drone observations, IoT telemetry, productivity logs, and site monitoring data.

cs.CE

Lean 5.0: A Predictive, Human-AI, and Ethically Grounded Paradigm for Construction Management

This paper introduces Lean 5.0, a human-centric evolution of Lean-Digital integration that connects predictive analytics, AI collaboration, and continuous learning within Industry 5.0 and Construction 5.0 contexts. A systematic literature review (2019-2024) and a 12-week empirical validation study demonstrate measurable performance gains, including a 13% increase in Plan Percent Complete (PPC), 22% reduction in rework, and 42% improvement in forecast accuracy. The study adopts a mixed-method Design Science Research (DSR) approach aligned with PRISMA 2020 guidelines. The paper also examines integration with digital twin and blockchain technologies to improve traceability, auditability, and lifecycle transparency. Despite limitations related to sample size, single-case design, and study duration, the findings show that Lean 5.0 provides a transformative paradigm connecting human cognition with predictive control in construction management.

cs.CE

Simulation-Based Validation of an Integrated 4D/5D Digital-Twin Framework for Predictive Construction Control

Persistent cost and schedule deviations remain a major challenge in the U.S. construction industry, revealing the limitations of deterministic CPM and static document-based estimating. This study presents an integrated 4D/5D digital-twin framework that couples Building Information Modeling (BIM) with natural-language processing (NLP)-based cost mapping, computer-vision (CV)-driven progress measurement, Bayesian probabilistic CPM updating, and deep-reinforcement-learning (DRL) resource-leveling. A nine-month case implementation on a Dallas-Fort Worth mid-rise project demonstrated measurable gains in accuracy and efficiency: 43% reduction in estimating labor, 6% reduction in overtime, and 30% project-buffer utilization, while maintaining an on-time finish at 128 days within P50-P80 confidence bounds. The digital-twin sandbox also enabled real-time "what-if" forecasting and traceable cost-schedule alignment through a 5D knowledge graph. Findings confirm that integrating AI-based analytics with probabilistic CPM and DRL enhances forecasting precision, transparency, and control resilience. The validated workflow establishes a practical pathway toward predictive, adaptive, and auditable construction management.

cs.CE

Integrated 4D/5D Digital-Twin Framework for Cost Estimation and Probabilistic Schedule Control: A Texas Mid-Rise Case Study

Persistent cost and schedule overruns in U.S. building projects expose limitations of conventional, document-based estimating and deterministic Critical Path Method (CPM) scheduling, which remain inflexible under uncertainty and lag dynamic field conditions. This study presents an integrated 4D/5D digital-twin framework unifying Building Information Modeling (BIM), natural language processing (NLP), reality capture, computer vision, Bayesian risk modeling, and deep reinforcement learning (DRL) for construction cost and schedule control. The system automates project-control functions by: (a) mapping contract documents to standardized cost items using transformer-based NLP (0.883 weighted F1 score); (b) aligning photogrammetry and LiDAR data with BIM to compute earned value; (c) deriving real-time activity completion from site imagery (0.891 micro accuracy); (d) updating probabilistic CPM forecasts via Bayesian inference and Monte Carlo simulation; (e) using DRL for adaptive resource allocation (75% adoption rate); and (f) providing 4D/5D decision sandbox for predictive analysis. A Texas mid-rise case study demonstrates localized cost adjustment using RSMeans City Cost Index and Bureau of Labor Statistics wage data. Results show 43% reduction in estimating labor, 6% overtime reduction (91 hours), and project completion matching P50 probabilistic forecast of 128 days, confirming improved estimation accuracy and responsiveness.

cs.CE

Shapiro like steps reveals molecular nanomagnets' spin dynamics

We present an accurate way to detect spin dynamics of a nutating molecular nanomagnet by inserting it in a tunnel Josephson junction and studying the current voltage (I-V) characteristic. The spin nutation of the molecular nanomagnet is generated by applying two circularly polarized magnetic fields. We demonstrate that modulation of the Josephson current by the nutation of the molecular nanomagnet's spin appears as a stepwise structure like Shapiro steps in the I-V characteristic of the junction. Width and heights of these Shapiro-like steps are determined by two parameters of the spin nutation, frequency and amplitude of the nutation, which are simply tuned by the applied magnetic fields.