SearcharxivSearch

arXiv subjects

Paolo Barbato

Publications and source records attributed to Paolo Barbato.

2 recordsLinked to original sources

Repurposing acquisition devices into trigger-based timing synchronization of breakdown events during MITICA high voltage holding experiments

A critical requirement for MITICA -- a full-scale prototype of the heating Neutral Beam Injectors hosted at the Consorzio RFX Neutral Beam Test Facility for the ITER experiment -- is the capability to withstand a continuous voltage of 1MV across the vacuum gaps insulating the beam source from the grounded vessel. To validate such feature, a dedicated voltage-holding test campaign was conducted throughout 2024 and 2025 using a full-scale mock-up of the beam source. The tests also involved an accurate characterization of the associated breakdown events: vacuum dielectric failures which result in rapid potential drops and generate strong current discharges. This contribution will present a relative time reconstruction architecture based on cost-effective, embedded RedPitaya (Zynq-7000 FPGA) devices repurposed as timing hubs. These nodes function as configurable trigger multiplexers while simultaneously recording trigger signals as transients to facilitate the offline reconstruction of event sequences. The method allows self-calibration through measuring the static intrinsic delays of the optical fibers and internal logics, generating delay offsets to synchronize acquired waveforms across a sparse, connected-graph topology of both acquisition devices and hubs themselves.

physics.comp-ph

Partial Discharges detection in 1 MV power supplies in MITICA experiment, the ITER Heating Neutral Beam Injector prototype

MITICA (Megavolt ITER Injector & Concept Advancement), the full scale prototype of ITER Heating Neutral Beam, is under realization at the Neutral Beam Test Facility (Padova, Italy). It is designed to deliver 16.5 MW to ITER plasma, obtained by accelerating negative Deuterium ions up to 1 MeV for a total ion current of 40 A and then neutralized. MITICA Acceleration Power Supply is composed of several non-standard equipment, beyond industrial standard for insulation voltage level (-1 MVdc) and dimensions. Voltage withstand tests (up to 1.265 MVdc) have been performed in five subsequent steps (from 2018 to 2019), according to the installation progress, after connecting equipment belonging to different procurements. During integrated commissioning, started in 2021, two breakdowns occurred in a position of the HV plant not still identified, so they could be occurred either in air or in SF6. To identify the locations of possible weak insulation points, the existing diagnostics for partial discharge detection (the precursor of breakdowns) as a first step have been improved on air-insulated parts by consisting in a set of instrumentation, like capacitive probes and off-the-shelf instruments for AC application (acoustic and electromagnetic sensors). The paper deals with the instruments qualification to assess their suitability for DC usage and then with the investigation performed in MITICA, in particular: 1) sensitivity assessment campaign, with artificially produced corona effect to identify the minimum threshold of each diagnostics 2) voltage application to MITICA plant, moving the instrumentation around equipment and increasing progressively the voltage looking for corona phenomena to identify possible weak insulation points.

physics.plasm-ph