SearcharxivSearch

arXiv subjects

R. M. Bodenstein

Publications and source records attributed to R. M. Bodenstein.

3 recordsLinked to original sources

White Paper on a Novel FFA-Based CEBAF Upgrade to 22 GeV

We present a conceptual design for a cost-effective upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) to 22 GeV using non-scaling fixed-field alternating-gradient (FFA) arcs built from Halbach-style permanent magnets. Building on the eight-pass energy-recovery demonstration at the Cornell--BNL CBETA test accelerator, the design replaces the highest-energy recirculation arcs with a pair of FFA arcs that simultaneously transport six passes spanning a factor-of-two momentum range. We describe the machine layout; including the injector, recirculating linacs, spreaders and recombiners, FFA arcs, splitters, transition and extraction regions; together with beam-dynamics validation studies covering emittance growth, synchrotron-radiation-driven depolarization, and orbit correction, and we summarize permanent-magnet design, prototyping, and radiation-resiliency results. This white paper documents the accelerator physics underpinning a staged path to 22 GeV that preserves CEBAF's multi-hall, high-luminosity, polarized-beam capabilities.

physics.acc-ph

The Continuous Electron Beam Accelerator Facility at 12 GeV

This review paper describes the energy-upgraded CEBAF accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing eighty-eight superconducting cavities that have operated CW at an average accelerating gradient of 20 MV/m. After reviewing the attributes and performance of the previous 6 GeV CEBAF accelerator, we discuss the upgraded CEBAF accelerator system in detail with particular attention paid to the new beam acceleration systems. In addition to doubling the acceleration in each linac, the upgrade included improving the beam recirculation magnets, adding more helium cooling capacity to allow the newly installed modules to run cold, adding a new experimental hall, and improving numerous other accelerator components. We review several of the techniques deployed to operate and analyze the accelerator performance, and document system operating experience and performance. In the final portion of the document, we present much of the current planning regarding projects to improve accelerator performance and enhance operating margins, and our plans for ensuring CEBAF operates reliably into the future. For the benefit of potential users of CEBAF, the performance and quality measures for beam delivered to each of the experimental halls is summarized in the appendix.

physics.acc-ph

Design and operation of a prototype interaction point beam collision feedback system for the International Linear Collider

A high-resolution, intratrain position feedback system has been developed to achieve and maintain collisions at the proposed future electron-positron International Linear Collider (ILC). A prototype has been commissioned and tested with a beam in the extraction line of the Accelerator Test Facility at the High Energy Accelerator Research Organization in Japan. It consists of a stripline beam position monitor (BPM) with analogue signal-processing electronics, a custom digital board to perform the feedback calculation, and a stripline kicker driven by a high-current amplifier. The closed-loop feedback latency is 148 ns. For a three-bunch train with 154 ns bunch spacing, the feedback system has been used to stabilize the third bunch to 450 nm. The kicker response is linear, and the feedback performance is maintained, over a correction range of over $\pm$60 μm. The propagation of the correction has been confirmed by using an independent stripline BPM located downstream of the feedback system. The system has been demonstrated to meet the BPM resolution, beam kick, and latency requirements for the ILC.

physics.acc-ph