SearcharxivSearch

arXiv subjects

R. Matev

Publications and source records attributed to R. Matev.

11 recordsLinked to original sources

Operation and performance of the Probe for Luminosity Measurement at LHCb

The Probe for LUminosity MEasurement (PLUME) detector is a dedicated luminosity monitor at the LHCb interaction point. It is a hodoscope comprising 48 Hamamatsu R760 photomultiplier tubes that detect Cherenkov light produced by particles travelling in the direction opposite to the LHCb spectrometer acceptance. PLUME provides real-time, bunch-by-bunch luminosity measurements during LHCb data taking and serves as the primary detector for controlling the luminosity levelling process at LHCb. In addition, its data are used offline, together with other dedicated counters from LHCb sub-systems, to determine the integrated luminosity delivered to the experiment. This paper reports on the detector's operational performance during the 2024-2026 data-taking period of Run 3. The integrated luminosity recorded by the LHCb experiment in $pp$ collisions at $\sqrt{s} = 13.6$ TeV during this period, as measured by the PLUME online luminosity counters for detector performance monitoring, amounts to $\mathcal{L} = (26.71 \pm 1.07)$ fb$^{-1}$. The luminosity values used in physics analyses are determined separately through dedicated offline calibrations based on van der Meer scans and Beam Gas Imaging techniques, and will be reported in a dedicated publication, as they are beyond the scope of this paper.

hep-ex

A Comparison of CPU and GPU implementations for the LHCb Experiment Run 3 Trigger

The LHCb experiment at CERN is undergoing an upgrade in preparation for the Run 3 data taking period of the LHC. As part of this upgrade the trigger is moving to a fully software implementation operating at the LHC bunch crossing rate. We present an evaluation of a CPU-based and a GPU-based implementation of the first stage of the High Level Trigger. After a detailed comparison both options are found to be viable. This document summarizes the performance and implementation details of these options, the outcome of which has led to the choice of the GPU-based implementation as the baseline.

physics.ins-det

Design and performance of the LHCb trigger and full real-time reconstruction in Run 2 of the LHC

The LHCb collaboration has redesigned its trigger to enable the full offline detector reconstruction to be performed in real time. Together with the real-time alignment and calibration of the detector, and a software infrastructure to make persistent the high-level physics objects produced during real-time processing, this redesign enabled the widespread deployment of real-time analysis during Run 2. We describe the design of the Run 2 trigger and real-time reconstruction, and present data-driven performance measurements for a representative sample of LHCb's physics programme.

hep-ex

A comprehensive real-time analysis model at the LHCb experiment

An evolved real-time data processing strategy is proposed for high-energy physics experiments, and its implementation at the LHCb experiment is presented. The reduced event model allows not only the signal candidate firing the trigger to be persisted, as previously available, but also an arbitrary set of other reconstructed or raw objects from the event. This allows for higher trigger rates for a given output data bandwidth, when compared to the traditional model of saving the full raw detector data for each trigger, whilst accommodating inclusive triggers and preserving data mining capabilities. The gains in physics reach and savings in computing resources already made possible by the model are discussed, along with the prospects of employing it more widely for Run 3 of the Large Hadron Collider.

hep-ex

Baby MIND: A magnetized segmented neutrino detector for the WAGASCI experiment

T2K (Tokai-to-Kamioka) is a long-baseline neutrino experiment in Japan designed to study various parameters of neutrino oscillations. A near detector complex (ND280) is located 280~m downstream of the production target and measures neutrino beam parameters before any oscillations occur. ND280's measurements are used to predict the number and spectra of neutrinos in the Super-Kamiokande detector at the distance of 295~km. The difference in the target material between the far (water) and near (scintillator, hydrocarbon) detectors leads to the main non-cancelling systematic uncertainty for the oscillation analysis. In order to reduce this uncertainty a new WAter-Grid-And-SCintillator detector (WAGASCI) has been developed. A magnetized iron neutrino detector (Baby MIND) will be used to measure momentum and charge identification of the outgoing muons from charged current interactions. The Baby MIND modules are composed of magnetized iron plates and long plastic scintillator bars read out at the both ends with wavelength shifting fibers and silicon photomultipliers. The front-end electronics board has been developed to perform the readout and digitization of the signals from the scintillator bars. Detector elements were tested with cosmic rays and in the PS beam at CERN. The obtained results are presented in this paper.

physics.ins-det

Baby MIND Experiment Construction Status

Baby MIND is a magnetized iron neutrino detector, with novel design features, and is planned to serve as a downstream magnetized muon spectrometer for the WAGASCI experiment on the T2K neutrino beam line in Japan. One of the main goals of this experiment is to reduce systematic uncertainties relevant to CP-violation searches, by measuring the neutrino contamination in the anti-neutrino beam mode of T2K. Baby MIND is currently being constructed at CERN, and is planned to be operational in Japan in October 2017.

physics.ins-det

Baby MIND: A magnetised spectrometer for the WAGASCI experiment

The WAGASCI experiment being built at the J-PARC neutrino beam line will measure the difference in cross sections from neutrinos interacting with a water and scintillator targets, in order to constrain neutrino cross sections, essential for the T2K neutrino oscillation measurements. A prototype Magnetised Iron Neutrino Detector (MIND), called Baby MIND, is being constructed at CERN to act as a magnetic spectrometer behind the main WAGASCI target to be able to measure the charge and momentum of the outgoing muon from neutrino charged current interactions.

physics.ins-det

Tesla : an application for real-time data analysis in High Energy Physics

Upgrades to the LHCb computing infrastructure in the first long shutdown of the LHC have allowed for high quality decay information to be calculated by the software trigger making a separate offline event reconstruction unnecessary. Furthermore, the storage space of the triggered candidate is an order of magnitude smaller than the entire raw event that would otherwise need to be persisted. Tesla, following the LHCb renowned physicist naming convention, is an application designed to process the information calculated by the trigger, with the resulting output used to directly perform physics measurements.

physics.ins-det

Proposal for SPS beam time for the baby MIND and TASD neutrino detector prototypes

The design, construction and testing of neutrino detector prototypes at CERN are ongoing activities. This document reports on the design of solid state baby MIND and TASD detector prototypes and outlines requirements for a test beam at CERN to test these, tentatively planned on the H8 beamline in the North Area, which is equipped with a large aperture magnet. The current proposal is submitted to be considered in light of the recently approved projects related to neutrino activities with the SPS in the North Area in the medium term 2015-2020.

physics.ins-det

A Very Intense Neutrino Super Beam Experiment for Leptonic CP Violation Discovery based on the European Spallation Source Linac: A Snowmass 2013 White Paper

Very intense neutrino beams and large neutrino detectors will be needed in order to enable the discovery of CP violation in the leptonic sector. We propose to use the proton linac of the European Spallation Source currently under construction in Lund, Sweden to deliver, in parallel with the spallation neutron production, a very intense, cost effective and high performance neutrino beam. The baseline program for the European Spallation Source linac is that it will be fully operational at 5 MW average power by 2022, producing 2 GeV 2.86 ms long proton pulses at a rate of 14 Hz. Our proposal is to upgrade the linac to 10 MW average power and 28 Hz, producing 14 pulses/s for neutron production and 14 pulses/s for neutrino production. Furthermore, because of the high current required in the pulsed neutrino horn, the length of the pulses used for neutrino production needs to be compressed to a few $μ$s with the aid of an accumulator ring. A long baseline experiment using this Super Beam and a megaton underground Water Cherenkov detector located in existing mines 300-600 km from Lund will make it possible to discover leptonic CP violation at 5 $σ$ significance level in up to 50% of the leptonic Dirac CP-violating phase range. This experiment could also determine the neutrino mass hierarchy at a significance level of more than 3 $σ$ if this issue will not already have been settled by other experiments by then. The mass hierarchy performance could be increased by combining the neutrino beam results with those obtained from atmospheric neutrinos detected by the same large volume detector. This detector will also be used to measure the proton lifetime, detect cosmological neutrinos and neutrinos from supernova explosions. Results on the sensitivity to leptonic CP violation and the neutrino mass hierarchy are presented.

hep-ex

Interim Design Report

The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires an Interim Design Report to be delivered midway through the project as a step on the way to the RDR. This document, the IDR, has two functions: it marks the point in the IDS-NF at which the emphasis turns to the engineering studies required to deliver the RDR and it documents baseline concepts for the accelerator complex, the neutrino detectors, and the instrumentation systems. The IDS-NF is, in essence, a site-independent study. Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific issues to be addressed in the cost analysis that will be presented in the RDR. The choice of example sites should not be interpreted as implying a preferred choice of site for the facility.

hep-ex