An Optimized Expansion Auction Integrating Energy, Flexibility, and Network Constraints

Auction mechanisms are widely used to support generation investments. In the US, capacity auctions serve as supply-adequacy instruments to address the missing-money problem, whereas in Latin America, energy and capacity auctions procure long-term contracts to support generation expansion. In both settings, accreditation metrics, such as Firm Energy (FE) and Effective Load Carrying Capability (ELCC), are used to approximate the reliability contribution of selected units and winning projects are selected based on a financial offer. This approach fails to recognize the actual contribution of winners to the multiple services they provide to the system. This limitation becomes more significant with high shares of renewables, as the value of each resource increasingly depends on network and technological constraints, as well as on complementarities within the generation portfolio. Inspired by short-term auctions, such as day-ahead markets, this paper proposes a joint optimization-based auction for generation and transmission investments that internalizes these interactions, capturing the intrinsic value of generation candidates without requiring the computation of FE or ELCC metrics. The auctioneer determines the winning portfolio through an expansion-planning model that explicitly represents network constraints, operational interactions, reliability standards, and multiple scenarios. A case study of the Brazilian system indicates lower system costs, lower risk, and a more diverse portfolio relative to the stylized decoupled procurement approaches currently deployed in many systems.

math.OC↗

Co-Optimized Generation, Transmission, and Storage Expansion: System Value and Optimal Duration of Pumped-Storage Hydropower

Expansion planning models usually fix storage duration before optimization, setting how much storage power to build but not for how long it can discharge. We present a generation-transmission-storage expansion framework in which candidates of many durations compete on annualized cost, making the duration mix an optimization outcome. It is a rolling-horizon, two-stage stochastic linear program, each five-year stage is a full year at hourly resolution under ten coherent inflow, wind, and solar scenarios. We apply it to the Brazilian Interconnected System over 2030-2050, where demand roughly doubles to 1,716 TWh/year and variable renewable energy (VRE) supplies most new capacity. Two cases are compared: 36 pumped-storage hydropower (PSH) candidates over four subsystems and nine durations (4-144 h) alongside 4-h battery energy storage systems (BESS), and BESS alone. With PSH available, the model builds 31.2 GW / 755 GWh of PSH and no BESS, dominated by 12-h capacity with 4.9 GW of 72-h units. Without PSH it builds 38 GW / 152 GWh of BESS and 7.8 GW more gas-fired capacity, mostly open-cycle peakers. PSH lowers 2050 annualized system cost by US$ 5.0 billion/year (6.8%), operating cost by 23.5%, thermal generation by 34 TWh/year, and long-run marginal cost by 20%; 2035 VRE curtailment falls from 8.4% to 3.2%. The magnitudes are specific to Brazil, but the underlying mechanism is general: limiting storage candidates to a single duration understates the system's optimal energy-storage requirement and overstates its residual need for thermal capacity.