Test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies for the High Luminosity LHC upgrade

The US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1/Q3 quadrupole optical components of the High Luminosity LHC upgrade at CERN. Total of 10 cryo-assemblies containing two Nb3Sn quadrupole magnets per cold mass will be delivered within this program. After the successful test of the first pre-series cryo-assembly in 2023, two more cryo-assemblies were tested at Fermilab's horizontal test facility. Production overview and the test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies are summarized in this paper. After the first test, to increase the capability of the horizontal test facility, various improvements have been made. These improvements are also described in this paper.

physics.acc-ph

First results of AUP Nb3Sn quadrupole horizontal tests

The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the field strength. This will be the first ever large-scale implementation of Nb3Sn magnets in a particle accelerator. The High-Luminosity LHC Upgrade, HL-LHC is a CERN project with a world-wide collaboration. It is under construction and utilizes Nb3Sn Magnets (named MQXF) as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC. This paper will present the program to fabricate the Nb3Sn superconducting magnets. We are reporting the status of the HL-LHC AUP project present the results from horizontal tests of the first fully assembled cryo-assembly.

physics.acc-ph

Quench Performance of the First Pre-series AUP Cryo-assembly

The High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include eight cryo-assemblies that are expected to be fabricated and delivered to CERN by the US HL-LHC Accelerator Upgrade Project (AUP) as part of the U.S. contributions to the HL-LHC. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 and Q3 inner triplet optical elements in front of the two interaction points. Each cryo-assembly consists of two 4.2 m long Nb3Sn quadrupole magnets with aperture 150 mm and operating gradient 132.6 T/m. The first pre-series cryo-assembly has been fabricated and successfully tested at the horizontal test facility at Fermi National Accelerator Laboratory. In this manuscript we report the quench test results of the LQXFA/B-01 cryo-assembly. The primary objective of the horizontal test is full cryo-assembly qualification and validation of the performance requirements.

physics.acc-ph

Effect of CLIQ on training of HL-LHC quadrupole magnets

The high-luminosity LHC upgrade requires stronger than LHC low-beta quadrupole magnets to reach the luminosity goals of the project. The project is well advanced and HL-LHC quadrupole magnets are currently being commissioned in US Labs (MQXFA magnets) and CERN (MQXFB magnets). Those are the first Nb3Sn magnets to be used in any large particle accelerator. At development stages, many Nb3Sn accelerator sub-scale models showed relatively slow training and MQXFA magnets were projected to have low tens of quenches before reaching operational field. Recently it was shown that dedicated capacitor-based devices can affect Nb3Sn magnet training, and it was suggested that CLIQ, a capacitor-based device intended for quench protection, can do too. The present paper investigates effects on training likely induced by CLIQ, using the base fact that only half the coils in a quadrupole experience upward current modulation at quench because of capacitor discharge. The study encompasses all MQXFA production magnets trained at BNL to date. No other high-statistics data from identical magnets (series) with CLIQ protection exist so far. Implications and opportunities stemming from data analysis are discussed and conclusions drawn.

physics.acc-ph

Magnetic Measurements and Alignment Results of LQXFA/B Cold Mass Assemblies at Fermilab

MQXFA production series quadrupole magnets are being built for the Hi-Lumi (HL) LHC upgrade by the US Accelerator Upgrade Project (US-HL-LHC AUP). These magnets are being placed in pairs, as a cold mass, within cryostats at Fermilab, and are being tested to assess alignment and magnetic performance at Fermilab's horizontal test stand facility. The ~10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis position, and for magnet variations in positioning and local field profile. This paper describes the results of the magnetic and alignment measurements which characterize the first LQXFA/B assembly.

physics.acc-ph

Application of Distributed Fiber Optic Strain Sensors to LMQXFA Cold Mass Welding

The future High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include the low-beta inner triplets (Q1, Q2a/b, Q3) for two LHC insertion regions. The Q1, Q3 components consist of eight 10 m-long LMQXFA cryo-assemblies fabricated by the HL-LHC Accelerator Upgrade Project. Each LMQXFA Cold mass contains two Nb3Sn magnets connected in series. A stainless-steel shell is welded around the two magnets before the insertion into the cryostat. There is a limit on how much coil preload increase induced by the shell welding is allowed. Distributed Rayleigh backscattering fiber optics sensors were used for the first time to obtain a strain map over a wide area of a Nb3Sn magnet cold mass shell. Data were collected during welding of the first LMQXFA cold mass and the results confirm that the increase of the coil pole azimuthal pre-stress after welding do not exceed requirements.

physics.acc-ph

Commissioning, Performance, and Effect of the Quench Current-boosting Device on a Dedicated Superconducting Magnet

Superconducting magnet training is one of the accelerator related issues attracting attention due to significant operational costs and time budget associated to it. It is especially worrisome that magnets based on the next-generation Nb3Sn technology are affected by long training. While various efforts are underway to better understand and resolve the problem a parallel path could also be investigated, a path bypassing the issue. Following the concept of fast induced over-current during magnet powering, FNAL has developed an upgradable capacitor-based device to discharge through a superconducting magnet at quench detection or operator chosen time. The 0.4 F/1 kV device has been tested on a 1-m-long dipole-coil in a mirror magnet configuration and conclusive results on magnet training elimination have been observed. In this paper we discuss the main characteristics of the device, compare simulated response and actual performance, elaborate on test drivers and outcomes. Next steps and perspectives for future use are debated.

physics.ins-det

Challenges and Lessons Learned from fabrication, testing and analysis of eight MQXFA Low Beta Quadrupole magnets for HL-LHC

By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some criteria and were disassembled. Lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this paper, we present a summary of: 1) the fabrication and test data of all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.

physics.acc-ph

White Paper on Leading-Edge technology And Feasibility-directed (LEAF) Program aimed at readiness demonstration for Energy Frontier Circular Colliders by the next decade

In this White Paper for the Snowmass 2021 Process, we propose the establishment of a magnet Leading-Edge technology And Feasibility-directed Program (LEAF Program) to achieve readiness for a future collider decision on the timescale of the next decade. The LEAF Program would rely on, and be synergetic with, generic R&D efforts presently covered - in the US - by the Magnet Development Program (MDP), the Conductor Procurement and R&D (CPRD) Program and other activities in the Office of HEP supported by Early Career Awards (ECA) or Lab Directed R&D (LDRD) funds. Where possible, ties to synergetic efforts in other Offices of DOE or NSF are highlighted and suggested as wider Collaborative efforts on the National scale. International efforts are also mentioned as potential partners in the LEAF Program. We envision the LEAF Program to concentrate on demonstrating the feasibility of magnets for muon colliders as well as next generation high energy hadron colliders, pursuing, where necessary and warranted by the nature of the application, the transition from R&D models to long models/prototypes. The LEAF Program will naturally drive accelerator-quality and experiment-interface design considerations. LEAF will also concentrate, where necessary, on cost reduction and/or industrialization steps.

physics.acc-ph

Fabrication and installation of the Mu2e cryogenic distribution system

The muon-to-electron conversion (Mu2e) experiment at Fermilab will be used to search for the charged lepton flavor-violating conversion of muons to electrons in the field of an atomic nucleus. The Mu2e experiment is currently in the construction stage. The scope of this paper is the cryogenic distribution system and superconducting power leads for four superconducting solenoid magnets: Production Solenoid (PS), an Upstream and Downstream Transport Solenoids (TSu and TSd) and Detector Solenoid (DS). The design of the cryogenic distribution system and the fabrication of several sub-systems was reported previously. This paper reports on additional fabrication and installation progress that has been performed over the past two years. Lessons learned during fabrication and testing of the cryogenic distribution system components are described. In particular, the challenges and solutions implemented for aluminum welding are reported. A description of the process used to qualify the welding procedure and welders for welding the aluminium stabilized NbTi superconducting power leads is provided. Additionally, the progress made with regards to installing the power leads into the cryogenic Feedboxes is covered.

physics.acc-ph

Magnetic Measurements of HL-LHC AUP Cryo-Assemblies at Fermilab

LQXFA/B production series cryogenic assemblies are being built for the LHC upgrade by the HL-LHC Accelerator Upgrade Project (AUP). These contain a pair of MQXFA quadrupole magnets combined as a cold mass within a vacuum vessel, and are to be installed in the IR regions of the LHC. The LQXFA/B are being tested at 1.9 K to assess alignment and magnetic performance at Fermilab's horizontal test facility. The ~10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis location, and for variations in axis position and local field profile. A multi-probe, PCB-based rotating coil and Single Stretched Wire system are employed for these measurements. To accurately determine rotating coil location and angles within the cold mass, a laser tracker is utilized to record multiple targets at one end of the probe. This paper describes the measurements, probes/equipment, and techniques used to perform the necessary characterization of the cold mass.

physics.acc-ph

A Quench Detection and Monitoring System for Superconducting Magnets at Fermilab

A quench detection system was developed for protecting and monitoring the superconducting solenoids for the Muon-to-Electron Conversion Experiment (Mu2e) at Fermilab. The quench system was designed for a high level of dependability and long-term continuous operation. It is based on three tiers: Tier-I, FPGA-based Digital Quench Detection (DQD); Tier-II, Analog Quench Detection (AQD); and Tier-3, the quench controls and data management system. The Tier-I and Tier-II are completely independent and fully redundant systems. The Tier-3 system is based on National Instruments (NI) C-RIO and provides the user interface for quench controls and data management. It is independent from Tiers I & II. The DQD provides both quench detection and quench characterization (monitoring) capability. Both DQD and AQD have built-in high voltage isolation and user programmable gains and attenuations. The DQD and AQD also includes user configured current dependent thresholding and validation times. A 1st article of the three-tier system was fully implemented on the new Fermilab magnet test stand for the HL-LHC Accelerator Up-grade Project (AUP). It successfully provided quench protection and monitoring (QPM) for a cold superconducting bus test in November 2020. The Mu2e quench detection design has since been implemented for production testing of the AUP magnets. A detailed description of the system along with results from the AUP superconducting bus test will be presented.

physics.ins-det

Mu2e Technical Design Report

The Mu2e experiment at Fermilab will search for charged lepton flavor violation via the coherent conversion process mu- N --> e- N with a sensitivity approximately four orders of magnitude better than the current world's best limits for this process. The experiment's sensitivity offers discovery potential over a wide array of new physics models and probes mass scales well beyond the reach of the LHC. We describe herein the preliminary design of the proposed Mu2e experiment. This document was created in partial fulfillment of the requirements necessary to obtain DOE CD-2 approval.

physics.ins-det

Mu2e Conceptual Design Report

Mu2e at Fermilab will search for charged lepton flavor violation via the coherent conversion process mu- N --> e- N with a sensitivity approximately four orders of magnitude better than the current world's best limits for this process. The experiment's sensitivity offers discovery potential over a wide array of new physics models and probes mass scales well beyond the reach of the LHC. We describe herein the conceptual design of the proposed Mu2e experiment. This document was created in partial fulfillment of the requirements necessary to obtain DOE CD-1 approval, which was granted July 11, 2012.

physics.ins-det