SearcharxivSearch

arXiv subjects

S. Leo

Publications and source records attributed to S. Leo.

2 recordsLinked to original sources

Performance of the Muon $g-2$ calorimeter and readout systems measured with test beam data

A single calorimeter station for the Muon $g-2$ experiment at Fermilab includes the following subsystems: a 54-element array of PbF$_{2}$ Cherenkov crystals read out by large-area SiPMs, bias and slow-control electronics, a suite of 800 MSPS waveform digitizers, a clock and control distribution network, a gain calibration and monitoring system, and a GPU-based frontend read out through a MIDAS data acquisition environment. The entire system performance was evaluated using 2.5 - 5 GeV electrons at the End Station Test Beam at SLAC. This paper includes a description of the individual subsystems and the results of measurements of the energy response and resolution, energy-scale stability, timing resolution, and spatial uniformity. All measured performances meet or exceed the $g-2$ experimental requirements. Based on the success of the tests, the complete production of the required 24 calorimeter stations has been made and installation into the main experiment is complete. Furthermore, the calorimeter response measurements determined here informed the design of the reconstruction algorithms that are now employed in the running $g-2$ experiment.

physics.ins-det

Muon (g-2) Technical Design Report

The Muon (g-2) Experiment, E989 at Fermilab, will measure the muon anomalous magnetic moment a factor-of-four more precisely than was done in E821 at the Brookhaven National Laboratory AGS. The E821 result appears to be greater than the Standard-Model prediction by more than three standard deviations. When combined with expected improvement in the Standard-Model hadronic contributions, E989 should be able to determine definitively whether or not the E821 result is evidence for physics beyond the Standard Model. After a review of the physics motivation and the basic technique, which will use the muon storage ring built at BNL and now relocated to Fermilab, the design of the new experiment is presented. This document was created in partial fulfillment of the requirements necessary to obtain DOE CD-2/3 approval.

physics.ins-det