SearcharxivSearch

arXiv subjects

Shayan Sengupta

Publications and source records attributed to Shayan Sengupta.

3 recordsLinked to original sources

Characterizing Job Power Elasticity for Power-Flexible AI Training

Large language model (LLM) training is among the fastest-growing sources of electricity demand in modern data centers, and power availability is a primary bottleneck to continued AI infrastructure growth. Making the power consumption of these workloads flexible could unlock additional power for AI growth, limit increases in electricity prices, and improve the utilization of existing grid infrastructure. However, to realize this flexibility, we must first understand how the performance of training workloads changes when GPU power is reduced. This paper presents the first systematic characterization of \emph{job power elasticity} (the sensitivity of throughput to power reductions) in LLM training. To quantify elasticity, we introduce the \emph{Power Flexibility Index (PFI)}, a normalized metric that quantifies the performance cost of power reductions and provides a control primitive for SLA-aware power flexibility. We collect data from 131 LLM training runs on H200 (plus 24 H200 validation runs and 34 matched H100 runs), including both dense and mixture-of-experts models, pretraining and fine-tuning tasks, and up to 32 GPUs. We find that LLM training jobs exhibit substantial but variable power elasticity, and we identify telemetry signals that predict PFI at runtime. Finally, we demonstrate that PFI-aware power allocation maximizes total tokens/second throughput under power constraints. Under a 30\% power reduction, PFI-aware power allocation recovers ~1.5k tokens/s per job, 63\% of the performance gap between an equal-weight allocation and an oracle with perfect information. Our results establish power elasticity as a measurable property of training jobs and provide a foundation for power-aware, grid-responsive AI infrastructure.

cs.AI

Power-Flexible AI Data Centers: A New Paradigm for Grid-Responsive Compute

The rapid expansion of artificial intelligence (AI) infrastructure is driving unprecedented growth in electricity demand from data centers. Traditional power-system planning treats large computing facilities as inflexible peak loads, leading to costly infrastructure upgrades and long delays in grid interconnection. Recent work has shown that AI clusters can reduce electricity consumption during peak demand through software-based workload orchestration. This article explores how modern GPU-based AI data centers can operate as grid-interactive assets that respond dynamically to power system conditions. We describe an architecture integrating grid signals, workload scheduling, and power telemetry for fine-grained cluster power control. Experimental results from a real-world deployment on a 130 kW GPU cluster demonstrate multiple forms of flexibility, including rapid load reduction, sustained curtailment, and carbon-aware operation while preserving service levels for priority jobs. We further demonstrate performance-aware load shifting across geographically distributed clusters, enabling workloads to migrate toward regions with lower grid stress. Together, these capabilities transform AI infrastructure from static electricity consumers into flexible resources that support grid reliability, accelerate interconnection, and improve computing sustainability.

cs.DC

Turning AI Data Centers into Grid-Interactive Assets: Results from a Field Demonstration in Phoenix, Arizona

Artificial intelligence (AI) is fueling exponential electricity demand growth, threatening grid reliability, raising prices for communities paying for new energy infrastructure, and stunting AI innovation as data centers wait for interconnection to constrained grids. This paper presents the first field demonstration, in collaboration with major corporate partners, of a software-only approach--Emerald Conductor--that transforms AI data centers into flexible grid resources that can efficiently and immediately harness existing power systems without massive infrastructure buildout. Conducted at a 256-GPU cluster running representative AI workloads within a commercial, hyperscale cloud data center in Phoenix, Arizona, the trial achieved a 25% reduction in cluster power usage for three hours during peak grid events while maintaining AI quality of service (QoS) guarantees. By orchestrating AI workloads based on real-time grid signals without hardware modifications or energy storage, this platform reimagines data centers as grid-interactive assets that enhance grid reliability, advance affordability, and accelerate AI's development.

cs.DC