Building image classification models remains cumbersome in data-scarce domains, where collecting large labeled datasets is impractical. In-context learning (ICL) is a promising paradigm for few-shot image classification (FSIC), but prior work has underexplored the relative importance of encoder pretraining versus fusion-layer training data. We present PictSure, a vision-only ICL family of models that demonstrates the potential of easy-to-use fusion transformer architectures, as well as the need for better embedding representations across a wider range of image domains. In both in-domain and out-of-domain evaluations, we find that representation quality induced by pretraining strongly correlates with downstream ICL performance. Crucially, varying the training dataset for the fusion transformer, from ImageNet alone to diverse multi-domain mixtures, provides limited additional performance gains under the evaluated settings, demonstrating that the fusion layer appears capable of adapting effectively once embeddings are sufficiently structured. These results show that the bottleneck in visual ICL is representation quality, not fusion-module training diversity. To facilitate adoption and reproducibility, we release all model weights as open-source artifacts and provide an MCP server that exposes PictSure as a callable tool for LLM-based agentic systems, enabling few-shot image classification to be invoked directly within AI pipelines without integration overhead. Code can be found at https://github.com/PictSure and models at https://huggingface.co/pictsure.

cs.CV

Scheduling with Many Shared Resources

Consider the many shared resource scheduling problem where jobs have to be scheduled on identical parallel machines with the goal of minimizing the makespan. However, each job needs exactly one additional shared resource in order to be executed and hence prevents the execution of jobs that need the same resource while being processed. Previously a $(2m/(m+1))$-approximation was the best known result for this problem. Furthermore, a $6/5$-approximation for the case with only two machines was known as well as a PTAS for the case with a constant number of machines. We present a simple and fast 5/3-approximation and a much more involved but still reasonable 1.5-approximation. Furthermore, we provide a PTAS for the case with only a constant number of machines, which is arguably simpler and faster than the previously known one, as well as a PTAS with resource augmentation for the general case. The approximation schemes make use of the N-fold integer programming machinery, which has found more and more applications in the field of scheduling recently. It is plausible that the latter results can be improved and extended to more general cases. Lastly, we give a $5/4 - \varepsilon$ inapproximability result for the natural problem extension where each job may need up to a constant number (in particular $3$) of different resources.

cs.DS

(In-)Approximability Results for Interval, Resource Restricted, and Low Rank Scheduling

We consider variants of the restricted assignment problem where a set of jobs has to be assigned to a set of machines, for each job a size and a set of eligible machines is given, and the jobs may only be assigned to eligible machines with the goal of makespan minimization. For the variant with interval restrictions, where the machines can be arranged on a path such that each job is eligible on a subpath, we present the first better than $2$-approximation and an improved inapproximability result. In particular, we give a $(2-\frac{1}{24})$-approximation and show that no better than $9/8$-approximation is possible, unless P=NP. Furthermore, we consider restricted assignment with $R$ resource restrictions and rank $D$ unrelated scheduling. In the former problem, a machine may process a job if it can meet its resource requirements regarding $R$ (renewable) resources. In the latter, the size of a job is dependent on the machine it is assigned to and the corresponding processing time matrix has rank at most $D$. The problem with interval restrictions includes the 1 resource variant, is encompassed by the 2 resource variant, and regarding approximation the $R$ resource variant is essentially a special case of the rank $R+1$ problem. We show that no better than $3/2$, $8/7$, and $3/2$-approximation is possible (unless P=NP) for the 3 resource, 2 resource, and rank 3 variant, respectively. Both the approximation result for the interval case and the inapproximability result for the rank 3 variant are solutions to open challenges stated in previous works. Lastly, we also consider the reverse objective, that is, maximizing the minimal load any machine receives, and achieve similar results.

cs.DS

Server Cloud Scheduling

Consider a set of jobs connected to a directed acyclic task graph with a fixed source and sink. The edges of this graph model precedence constraints and the jobs have to be scheduled with respect to those. We introduce the Server Cloud Scheduling problem, in which the jobs have to be processed either on a single local machine or on one of many cloud machines. Both the source and the sink have to be scheduled on the local machine. For each job, processing times both on the server and in the cloud are given. Furthermore, for each edge in the task graph, a communication delay is included in the input and has to be taken into account if one of the two jobs is scheduled on the server, the other in the cloud. The server can process jobs sequentially, whereas the cloud can serve as many as needed in parallel, but induces costs. We consider both makespan and cost minimization. The main results are an FPTAS with respect for the makespan objective for a fairly general case and strong hardness for the case with unit processing times and delays.

cs.DS

Approximating Weighted Completion Time for Order Scheduling with Setup Times

Consider a scheduling problem in which jobs need to be processed on a single machine. Each job has a weight and is composed of several operations belonging to different families. The machine needs to perform a setup between the processing of operations of different families. A job is completed when its latest operation completes and the goal is to minimize the total weighted completion time of all jobs. We study this problem from the perspective of approximability and provide constant factor approximations as well as an inapproximability result. Prior to this work, only the NP-hardness of the unweighted case and the polynomial solvability of a certain special case were known.

cs.DS