SearcharxivSearch

arXiv subjects

Suzanne L. Sheehy

Publications and source records attributed to Suzanne L. Sheehy.

3 recordsLinked to original sources

Failure modes and downtime of radiotherapy linear accelerators and Multi-Leaf Collimators in Indonesia

The lack of equitable access to radiotherapy linear accelerators (LINACs) is a substantial barrier to cancer care in Low and Middle-Income Countries (LMICs). Aside from the issue of cost, there are also issues of robustness of state-of-the-art LINACs in LMICs, which are subject to mechanical and electrical breakdowns, which can result in downtimes ranging from days to months. Recent research has identified disparities in failure frequency and downtimes between LMICs (Nigeria, Botswana) and a High-Income Countries (HIC, the UK), and highlighted the need for additional data and study particularly relating to Multi-Leaf Collimators (MLCs). This study analyses data from 14 Indonesian Hospitals with a total of 19 LINACs and shows the pathways to failure of radiotherapy LINACs and frequency of breakdowns with an additional focus on the Multi-Leaf Collimator (MLC) subsystem. We found that LINACs throughout Indonesia are out of operation for 7 times longer than HICs and the Mean Time Between Failures of a LINAC in Indonesia is 341.58 Hours, or about 14 days. Furthermore, of the LINACs with an MLC fitted, $59.02^{+1.98}_{-1.61}$% of mechanical faults are due to the MLC and $57.14^{+0.78}_{-1.27}$% of cases requiring a replacement component are related to the MLC. These results outline the need to reassess the current generation of RT LINACs and ultimately work towards guiding future designs to be robust enough for all environments.

physics.acc-ph

Beam delivery systems for linac-based proton therapy

This report presents a design of a gantry for proton therapy based on the concept of adiabatic transition. The use of fixed-field alternating gradient magnets allows a large momentum acceptance and supports fast energy modulation. The optical performance of the gantry has been analysed using a beam tracking code. Several optimisations of the lattice and transition sections have been investigated to reduce size and ensure applicability to pencil beam scanning. Matching of the full energy range results in an increase in the size of the gantry, but reduces the weight and cost significantly compared to those that pertain to facilities in operation.

physics.acc-ph

Comparative analysis of radiotherapy LINAC downtime and failure modes in the UK, Nigeria and Botswana

The lack of radiotherapy linear accelerators (LINACs) in Low- and Middle- Income Countries (LMICs) has been recognised as a major barrier to providing quality cancer care in these regions, along with a shortfall in the number of highly qualified personnel. It is expected that additional challenges will be faced in operating precise, high tech radiotherapy equipment in these environments, and anecdotal evidence suggests that LINACs have greater downtime and higher failure rates of components than their counterparts in High-Income Countries. To guide future developments such as the design of a LINAC tailored for use in LMIC environments, it is important to take a data-driven approach to any re-engineering of the technology. However, no detailed statistical data on LINAC downtime and failure modes has been previously collected or presented in the literature. This work presents the first known comparative analysis of failure modes and downtime of current generation LINACs in radiotherapy centres, with the aim of determining any correlations between LINAC environment and performance. Logbooks kept by radiotherapy personnel on the operation of their LINAC were obtained and analysed from centres in Oxford (UK), Abuja, Benin, Enugu, Lagos, Sokoto (Nigeria) and Gaborone (Botswana). By deconstructing the LINAC into 12 different subsystems, it is found that the vacuum subsystem only fails in the LMIC centres and the failure rate in an LMIC environment is more than twice as large in 6 of the 12 subsystems compared to the High Income Country (HIC). Additionally, it is shown that despite accounting for only 3.4% of total number of faults, the LINAC faults which take more than an hour to repair account for 74.6% of the total downtime. The results of this study inform future attempts to mitigate the problems affecting LINACs in LMIC environments.

physics.acc-ph