Searcharxiv⌕ Search

arXiv subjects

Tomas Kåberger

Publications and source records attributed to Tomas Kåberger.

3 recordsLinked to original sources

EnergyNet in Practice: Long Grid, Short Grids and Mobility-Based Energy Peering

Electrification is planned as a network problem: more demand, more upstream capacity, local resources waiting for reinforcement. We argue that a material part of that bill, in money and time, follows from architecture, not electrification itself, and propose the Short Grid as the deployment unit: a locally controlled building, block or campus whose demand, generation, storage and local market operate behind Energy Routers enforcing an approved connection envelope to the Long Grid. Because the envelope governs exchange, not installed capacity, local resources can grow and many sites can build in parallel at the pace of PV and EV installation, not grid reinforcement. PV and EV batteries dominate today, but the architecture is general: any generation or storage, fixed or mobile, fits behind the same boundary and interfaces. EnergyNet Operators coordinate exchange among Short Grids and with the Long Grid; protection stays local; Vehicle-to-EnergyNet (V2EN) and Mobility-Based Energy Peering (MEP) make mobility-financed batteries accessible within and between them; priority-based operation protects critical services in shortage. We test it in models, not yet the field: a ten-building neighbourhood in Lund, Sweden; a bus-linked microgrid pair at Stanford and Half Moon Bay; and a proposed 20-site network in Rockaway, New York. Households and services are the largest demand category in Sweden, Denmark, Norway, California and New York (484 TWh/yr); halving their grid imports would be about 242 TWh. Europe's network investment to 2040 is estimated above EUR 1.2 trillion; modelling shows it depends on system design. Negagrid value, following the negawatt, counts network investment avoided, downsized or deferred, net of local substitute costs. "Don't pay twice": build coordinated local capability first; reinforce the Long Grid for what remains.

eess.SY↗

Quantifying EnergyNet performance: a simulation-based framework for decentralized energy networks

Power transmission and distribution infrastructure connects generation with consumers. Extreme weather, infrastructure failures, and geopolitical conflicts increasingly disrupt these connections, leaving large groups without electricity until service is restored. Local generation, storage, and controllable loads pose challenges but also enable new ways to organize energy systems. EnergyNet is a decentralized architecture of interconnected power electronic Energy Routers. Each coordinates local loads, generation, storage, and grid connections. Bidirectional Energy Links enable exchange between routers, while the Energy Protocol communicates needs and availability to coordinate transfers. EnergyNet can operate with or without the public grid. This paper develops a quantitative framework for modeling and evaluating EnergyNet. It represents topology, prioritized loads, generation, storage, grid connections, links, and component limits. Receding-horizon optimization calculates energy allocation and exchange, supporting also disturbance and reliability analysis. A three-router case illustrates energy sharing and islanded operation. The framework then models a Stanford University campus microgrid and an off-grid microgrid in Half Moon Bay. Under low-solar conditions, electric bus visits support the off-grid microgrid while preserving transport service. Finally, the paper models an EnergyNet under construction in Lund, Sweden, comprising ten buildings and 278 apartments. Full service is maintained in summer and winter and after the loss of one grid interface or Energy Link. Losing two links partitions the network; service in the island depends on local resources and repair time. Reliability screening identifies partitioning as rare but credible. Monte Carlo analysis shows full critical service in sampled summer conditions and median continuous critical service of approximately 92% in winter.

eess.SY↗

EnergyNet Explained: Internetification of Energy Distribution

In developing EnergyNet we have leveraged and are extending lessons from telecom's shift from a centralized, circuit-switched phone system to decentralized, packet-switched data networks. EnergyNet utilizes 1) an Energy Router that enforces galvanic separation and utilizes software-controlled energy flows over a DC backplane, 2) Energy Local and Wide Area Networks (ELAN/EWAN) based on DC microgrids that interconnect through an open Energy Protocol (EP), and 3) a control plane comprised of the Energy Router Operating System (EROS) and EP Server which is managed at operator scale through an Energy Network Management System (ENMS). We distinguish the architectural contribution (Tier-1 including components, interfaces, and operating model) from expected outcomes contingent on adoption (Tier-2). The latter includes local-first autonomy with global interoperability, near-real-time operation with local buffering, removal of EV-charging bottlenecks, freed grid capacity for data centers and industrial electrification, as well as a trend toward low, predictable, fixed-cost clean energy. Evidence from early municipal demonstrators illustrates feasibility and migration paths. The contribution is a coherent, open, and testable blueprint for software-defined, decentralized energy distribution, aligning power-systems engineering with networking principles and offering a practical route from legacy, synchronous grids to resilient, digitally routed energy distribution systems.

eess.SY↗