Modeling Light Signals Using Data from the First Pulsed Neutron Source Program at the DUNE Vertical Drift ColdBox Test Facility at CERN Neutrino Platform

In this paper, we present a first quantitative test of detected light signals produced in a pulsed neutron source run in a small vertical drift LArTPC at the CERN neutrino platform ColdBox test facility. The ColdBox cryostat, detectors, neutron sources, and particle interactions are modeled and simulated using Fluka. A good agreement is found in the detected number of photoelectrons, with values below 650 photoelectrons in both data and simulation, for all four X-ARAPUCA photodetectors on the cathode in the LArTPC. A time constant is also fitted from the neutron-beam-off light signal spectrum and found consistent between data and MC. Several important systematic effects are discussed and serve as guides for future runs at larger LArTPCs.

hep-ex

Characterization and Novel Application of Power Over Fiber for Electronics in a Harsh Environment

Power-over-Fiber (PoF) technology has been used extensively in settings where high voltages require isolation from ground. In a novel application of PoF, power is provided to photon detector modules located on a surface at $\sim$ 300 kV with respect to ground in the planned DUNE experiment. In cryogenic environments, PoF offers a reliable means of power transmission, leveraging optical fibers to transfer power with minimal system degradation. PoF technology excels in maintaining low noise levels when delivering power to sensitive electronic systems operating in extreme temperatures and high voltage environments. This paper presents the R$\&$D effort of PoF in extreme conditions and underscores its capacity to revolutionize power delivery and management in critical applications, offering a dependable solution with low noise, optimal efficiency, and superior isolation.

physics.ins-det

Physics Opportunities at a Beam Dump Facility at PIP-II at Fermilab and Beyond

The Fermilab Proton-Improvement-Plan-II (PIP-II) is being implemented in order to support the precision neutrino oscillation measurements at the Deep Underground Neutrino Experiment, the U.S. flagship neutrino experiment. The PIP-II LINAC is presently under construction and is expected to provide 800~MeV protons with 2~mA current. This white paper summarizes the outcome of the first workshop on May 10 through 13, 2023, to exploit this capability for new physics opportunities in the kinematic regime that are unavailable to other facilities, in particular a potential beam dump facility implemented at the end of the LINAC. Various new physics opportunities have been discussed in a wide range of kinematic regime, from eV scale to keV and MeV. We also emphasize that the timely establishment of the beam dump facility at Fermilab is essential to exploit these new physics opportunities.

hep-ex

Recent Improvements in the Beam Capture at Fermilab Booster for High Intensity Operation

The Fermilab Booster uses multi-turn beam injection with all its cavities phased such that beam sees a net zero RF voltage even when each station is at the same maxi-mum voltage. During beam capture the RF voltage is increased slowly by using its paraphase system. At the end of the capture the feedback is turned on for beam acceleration. It is vital for present operations as well as during the PIP-II era that both the HLRF and LLRF systems provide the proper intended phase and RF voltage to preserve the longitudinal emittance from injection to extraction. In this paper, we describe the original architecture of the cavity phase distribution, our recent beam-based RF phase measurements, observed significant deviation in the relative phases between cavities and correction effort. Results from the improved capture for high intensity beam are also presented.

physics.acc-ph

The FNAL Booster 2nd Harmonic RF Cavity

A second harmonic RF cavity which uses perpendicularly biased garnet for frequency tuning is currently being constructed for use in the Fermilab Booster. The cavity will operate at twice the fundamental RF frequency, from ~76 - 106 MHz, and will be turned on only during injection, and transition or extraction. Its main purpose is to reduce beam loss as required by Fermilab's Proton Improvement Plan (PIP). After three years of optimization and study, the cavity design has been finalized and all constituent parts have been received. We discuss the design aspects of the cavity and its associated systems, component testing, and status of the cavity construction.

physics.acc-ph

Garnet Ring Measurements For The Fermilab Booster 2nd Harmonic Cavity

A perpendicularly biased tuneable 2nd harmonic cavity is being constructed for use in the Fermilab Booster. The cavity's tuner uses National Magnetics AL800 garnet as the tuning media. For quality control, the magnetic properties of the material and the uniformity of the properties within the tuner must be assessed. We describe two tests which are performed on the rings and on their corresponding witness samples.

physics.acc-ph

Injection Bucket Jitter Compensation Using Phase Lock System At Fermilab Booster

The extraction bucket position in the Fermilab Booster is controlled with a cogging process that involves the comparison of the Booster RF count and the Recycler Ring revolution marker. A one RF bucket jitter in the extraction bucket position results from the variability of the process that phase matches the Booster to the Recycler. However, the new slow phase lock process used to lock the frequency and phase of the Booster RF to the Recycler RF has been made digital and programmable and has been modified to correct the extraction notch position. The beam loss at the Recycler injection has been reduced by 20%. Beam studies and the phase lock system will be discussed in this paper.

physics.acc-ph

Static Magnetization Properties Of AL800 Garnet Material

A second harmonic tunable RF cavity is being developed for the Fermilab Booster. This device, which promises reduction of the particle beam loss at the injection, transition, and extraction stages, employs perpendicularly biased garnet material for frequency tuning. The required range of the tuning is significantly wider than in previously built and tested tunable RF devices. As a result, the magnetic field in the garnet comes fairly close to the gyromagnetic resonance line at the lower end of the frequency range. The chosen design concept of a tuner for the cavity cannot ensure uniform magnetic field in the garnet material; thus, it is important to know the static magnetic properties of the material to avoid significant increase in the local RF loss power density. This report summarizes studies performed at Fermilab to understand variations in the magnetic properties of the AL800 garnet material used to build the tuner of the cavity.

physics.acc-ph

An Overview of the New Test Stand for H- Ion Sources at FNAL

A new test stand at FNAL is being constructed to carry out experiments to develop and upgrade the present magnetron-type sources of H- ions of up to 80 mA at 35 keV in the context of the Proton Improvement Plan (PIP). The aim of this plan is to provide high-power proton beams for the experiments at FNAL. The technical details of the construction and layout of this test stand are presented, along with a prospective set of diagnostics to monitor the sources.

physics.acc-ph

Development of Cogging at the Fermilab Booster

The development of magnetic cogging is part of the Fermilab Booster upgrade within the Proton Improvement Plan (PIP). The Booster is going to send 2.25E17 protons/hour which is almost double the present flux, 1.4E17 protons/hour to the Main Injector (MI) and Recycler (RR). The extraction kicker gap has to synchronize to the MI and RR injection bucket in order to avoid a beam loss at the rising edge of the extraction and injection kickers. Magnetic cogging is able to control the revolution frequency and the position of the gap using the magnetic field from dipole correctors while radial position feedback keeps the beam at the central orbit. The new cogging is expected to reduce beam loss due to the orbit changes and reduce beam energy loss when the gap is created. The progress of the magnetic cogging system development is going to be discussed in this paper.

physics.acc-ph

Current and Planned High Proton Flux Operations at the FNAL Booster

The Fermilab Proton Source machines, constituted by Pre-Injector, conventional Linac and Booster synchrotron, at Fermi National Accelerator Laboratory (Fermilab) had have a long history of successful beam operations. Built in late '60s, the Fermilab Proton Source began operations early in the '70s and since then it has successful provided protons to support the laboratory physics experiments. During the past decade, Booster performance reached unprecedented proton flux delivery of the order of 1.0-1.1E17 protons per hour, corresponding to 40 kW of beam power while maintained an allowed upper limit of 525 W of beam loss in the tunnel. In order to achieve this historical performance, major hardware upgrades were made in the machine combined with improvements in beam orbit control and operational awareness. Once again, the Proton Source has been charged to double their beam throughput, while maintaining the present residual activation levels, to meet the laboratory Intensity Frontier program goals until new machines are built and operational to replace them. In this paper we will discuss the plans involved in reaching even higher beam throughput in Booster.

physics.acc-ph

FNAL Proton Source High Intensity Operations and Beam Loss Control

The 40-year-old Fermilab Proton Source machines, constituted by the Pre-Injector, Linac and the synchrotron Booster, have been the workhorse of the Fermi National Accelerator Laboratory (Fermilab). During this time, the High Energy Physics Program has demanded an increase in proton throughput, especially during the past decade with the beginning of the neutrino program at Fermilab. In order to achieve a successful program, major upgrades and changes were made in Booster. Once again, the Proton Source has been charged to double their beam throughput, while maintain the present residual activation levels, to meet the laboratory Intensity Frontier program goals until new machines are built and operational to replace the Proton Source machines. This paper discusses the present performance of Booster and the plans involved in reaching even higher intensities.

physics.acc-ph

Observation of Instabilities of Coherent Transverse Ocillations in the Fermilab Booster

The Fermilab Booster - built more than 40 years ago - operates well above the design proton beam intensity of 4x10**12 ppp. Still, the Fermilab neutrino experiments call for even higher intensity of 5.5x10**12 ppp. A multitude of intensity related effects must be overcome in order to meet this goal including suppression of coherent dipole instabilities of transverse oscillations which manifest themselves as a sudden drop in the beam current. In this report we present the results of observation of these instabilities at different tune, coupling and chromaticity settings and discuss possible cures.

physics.acc-ph

Alignment and Aperture Scan at the Fermilab Booster

The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is going to be the source of issues. The booster accelerates beam from 400 MeV to 8 GeV and extracts to the Main Injector. Several percent of the beam is lost within 3 msec after the injection. The aperture at injection energy was measured and compared with the survey data. The magnets are going to be realigned in March 2012 in order to increase the aperture. The beam studies, analysis of the scan and alignment data, and the result of the magnet moves will be discussed in this paper.

physics.acc-ph

An experimentally robust technique for halo measurement using the IPM at the Fermilab Booster

We propose a model-independent quantity, $L/G$, to characterize non-Gaussian tails in beam profiles observed with the Fermilab Booster Ion Profile Monitor. This quantity can be considered a measure of beam halo in the Booster. We use beam dynamics and detector simulations to demonstrate that $L/G$ is superior to kurtosis as an experimental measurement of beam halo when realistic beam shapes, detector effects and uncertainties are taken into account. We include the rationale and method of calculation for $L/G$ in addition to results of the experimental studies in the Booster where we show that $L/G$ is a useful halo discriminator.

physics.acc-ph

Synchronization of the Fermilab Booster and Main Injector for Multiple Batch Injection

To date, the 120 GeV Fermilab Main Injector accelerator has accelerated a single batch of protons from the 8 GeV rapid-cycling Booster synchrotron for production of antiprotons for Run II. In the future, the Main Injector must accelerate 6 or more Booster batches simultaneously; the first will be extracted to the antiproton source, while the remaining are extracted for the NuMI/MINOS (Neutrinos at the Main Injector / Main Injector Neutrino Oscillation Search) neutrino experiment. Performing this multi-batch operation while avoiding unacceptable radioactivation of the beamlines requires a previously unnecessary synchronization between the accelerators. We describe a mechanism and present results of advancing or retarding the longitudinal progress of the Booster beam by active feedback radial manipulation of the beam during the acceleration period.

physics.acc-ph