DCGen 1.1 Technical Report: Generating Datacenter Configurations (including IT, Power, Cooling)

Diversification of digital applications and workloads has driven the development of diverse datacenter architectures on ever-larger scales. These datacenters consist of complex IT, power, and cooling systems with interdependencies that influence configuration and performance. As datacenters scale and power density increase, designing realistic models becomes more difficult, particularly for research, because it requires understanding all layers of the datacenter and how they interact. Consequently, many studies rely on outdated or unrealistic designs. To support research in datacenter hardware design principles, operational dynamics, cooling mechanisms, and interactions of these facilities with the electrical grid, we have designed DCGen, a tool which can generate a variety of datacenter configurations (including IT hardware, cooling and power distribution infrastructures) at various electrical power, compute capability, and area targets.The tool captures power and space characteristics of IT, cooling, and power infrastructures at both the rack and datacenter levels, enabling modeling of power, energy, and space. DCGen leverages specific use cases such as AI training, AI inference, and cloud services, to select reference and canonical IT hardware configurations, producing realistic mixes of server types. It can target datacenter scale in terms of both power (e.g., 10 MW, 100 MW, 1 GW) and compute capability. For cooling and power distribution infrastructures, DCGen chooses components from a production equipment catalog that optimizes for space or power efficiency while meeting the datacenter capacity requirements. This tool supports research using realistic datacenter designs through ``what-if'' scenario exploration, including studies of power density evolution over time, grid interconnection capacity planning, datacenter-grid interactions, and space management.

cs.DC↗

Exploding AI Power Use: an Opportunity to Rethink Grid Planning and Management

The unprecedented rapid growth of computing demand for AI is projected to increase global annual datacenter (DC) growth from 7.2% to 11.3%. We project the 5-year AI DC demand for several power grids and assess whether they will allow desired AI growth (resource adequacy). If not, several "desperate measures" -- grid policies that enable more load growth and maintain grid reliability by sacrificing new DC reliability are considered. We find that two DC hotspots -- EirGrid (Ireland) and Dominion (US) -- will have difficulty accommodating new DCs needed by the AI growth. In EirGrid, relaxing new DC reliability guarantees increases the power available to 1.6x--4.1x while maintaining 99.6% actual power availability for the new DCs, sufficient for the 5-year AI demand. In Dominion, relaxing reliability guarantees increases available DC capacity similarly (1.5x--4.6x) but not enough for the 5-year AI demand. New DCs only receive 89% power availability. Study of other US power grids -- SPP, CAISO, ERCOT -- shows that sufficient capacity exists for the projected AI load growth. Our results suggest the need to rethink adequacy assessment and also grid planning and management. New research opportunities include coordinated planning, reliability models that incorporate load flexibility, and adaptive load abstractions.

cs.DC↗