Searcharxiv⌕ Search

arXiv subjects

William A. Pellico

Publications and source records attributed to William A. Pellico.

5 recordsLinked to original sources

AI-Enabled Operations at Fermi Complex: Multivariate Time Series Prediction for Outage Prediction and Diagnosis

The Main Control Room of the Fermilab accelerator complex continuously gathers extensive time-series data from thousands of sensors monitoring the beam. However, unplanned events such as trips or voltage fluctuations often result in beam outages, causing operational downtime. This downtime not only consumes operator effort in diagnosing and addressing the issue but also leads to unnecessary energy consumption by idle machines awaiting beam restoration. The current threshold-based alarm system is reactive and faces challenges including frequent false alarms and inconsistent outage-cause labeling. To address these limitations, we propose an AI-enabled framework that leverages predictive analytics and automated labeling. Using data from $2,703$ Linac devices and $80$ operator-labeled outages, we evaluate state-of-the-art deep learning architectures, including recurrent, attention-based, and linear models, for beam outage prediction. Additionally, we assess a Random Forest-based labeling system for providing consistent, confidence-scored outage annotations. Our findings highlight the strengths and weaknesses of these architectures for beam outage prediction and identify critical gaps that must be addressed to fully harness AI for transitioning downtime handling from reactive to predictive, ultimately reducing downtime and improving decision-making in accelerator management.

cs.LG↗

Real-time Artificial Intelligence for Accelerator Control: A Study at the Fermilab Booster

We describe a method for precisely regulating the gradient magnet power supply at the Fermilab Booster accelerator complex using a neural network trained via reinforcement learning. We demonstrate preliminary results by training a surrogate machine-learning model on real accelerator data to emulate the Booster environment, and using this surrogate model in turn to train the neural network for its regulation task. We additionally show how the neural networks to be deployed for control purposes may be compiled to execute on field-programmable gate arrays. This capability is important for operational stability in complicated environments such as an accelerator facility.

physics.acc-ph↗

Instrumentation Developments and Beam Studies for the Fermilab Proton Improvement Plan LINAC Upgrade and New RFQ Front-End

Fermilab is developing a Proton Improvement Plan (PIP) to increase throughput of its proton source. The plan addresses hardware modifications to increase repetition rate and improve beam loss while ensuring viable operation of the proton source through 2025. The first phase of the PIP will enable the Fermilab proton source to deliver 1.8e17 protons per hour by mid-2013. As part of this initial upgrade, Fermilab plans to install a new front-end consisting of dual H- ion sources and a 201 MHz pulsed RFQ. This paper will present beam studies measurements of this new front-end and discuss new beam instrumentation upgrades for the Fermilab linac.

physics.acc-ph↗

Study Report of the Booster Transition Jump System

There are more than 15 years since the transition-jump system (TJS) was installed. Because of the quad steering, which is caused by the beam not being well centered through all the gamma-T quads, the TJS has never been used in the operation. Based upon the recent calculation, the short 12 gamma-T quad had the worst offset in the vertical direction, and it was lowered 4 mm. Afterwards, the orbit error caused by the gamma-T quad steering has been largely removed, and this encourages our efforts of commissioning the TJS to reach its design goal.

physics.acc-ph↗

Booster 6-GeV Study

Since a wider aperture has been obtained along the Booster beam line, this opens the opportunity for Booster running a higher intensity beam than ever before. Sooner or later, the available RF accelerating voltage will become a new limit for the beam intensity. Either by increasing the RFSUM or by reducing the accelerating rate can achieve the similar goal. The motivation for the 6-GeV study is to gain the relative accelerating voltage via a slower acceleration.

physics.acc-ph↗