Searcharxiv⌕ Search

arXiv subjects

Zhichao Gao

Publications and source records attributed to Zhichao Gao.

4 recordsLinked to original sources

USB Gym: A Gymnasium Testbed for Closed-Loop Ultrasound View Matching

Background and Objective: Our main goal is ultrasound guidance: moving a probe until its image matches a target view. Published methods for each part of a guide are evaluated in separate simulators. We asked whether these methods, combined into one guide, are good enough. Methods: We built USB Gym, a testbed whose standard engine simulates ultrasound from public patient CT, with a network drawing organ textures from CT labels. Its guide has three replaceable parts (slots), an organ segmenter, a controller and a reward, which received 20 published methods, each run on the same 60 episodes of six held-out patients. In each slot, a published method replaced ours only if detectably better on these patients. The better of this combination and our original guide on 20 new CTs is the benchmark baseline. A pose oracle, reading the exact probe pose available only in simulation, set the reference. The results below are exploratory. Results: On these CTs, the probe started on average 16.0 mm from the target view; the pose oracle brought it to 1.5 mm. Of the results known when the combination was fixed, only an image-similarity reward (SSIM) was slightly but detectably better, so the combination was our guide with that reward. This combination was the benchmark baseline, ending at 13.7 mm (16% of the oracle's progress). Conclusions: Combining untuned published methods with ours did not guide the probe near the target view; the task remains under-explored. The testbed accepts new methods; no guide was tested on hardware.

cs.CV↗

Agentic Verifier-in-the-Loop Solver Orchestration for Cell-Free Massive MIMO Downlink Power Control

Cell-free massive multiple-input multiple-output (MIMO) systems can provide uniformly strong service through distributed access points, but performance still depends critically on downlink power control. Existing methods are typically selected offline and then applied uniformly across channel and load regimes, even though no single solver is uniformly best. We therefore propose VISO-PC, a verifier-in-the-loop solver-orchestration framework in which an agent routes among trusted solvers rather than generating power coefficients directly. Given a structured instance descriptor, the router selects an initial solver and fallback order, and an independent verifier accepts only candidates that satisfy the constraints and produce a valid verified common rate. For fairness-oriented downlink cell-free power control under per-AP constraints, verification-aware orchestration improves accepted rate over all fixed single-solver baselines on a reproducible prototype benchmark. Moreover, a lightweight memory-based router matches the accepted rate of a strong rule-based router while reducing average runtime and fallback rate. These results show that solver orchestration is a practical agentic layer for cell-free massive MIMO downlink power control.

cs.IT↗

Nuclear reaction measurements of 80.5 MeV/u 12C beam bombarding on C, W, Cu, Au, Pb targets

To get the energy spectrum distribution and cross-sections of emitted light charged particles and explore the nuclear reaction, a experiment of 80.5 MeV/u 12C beam bombarding on C, W, Cu, Au, Pb targets has been carried out at Institute of Modern Physics, Chinese Academy of Science. 30, 60 and 120 degree relative to the incident beam have been detected using three sets of telescope detectors. The results indicate that there is a tendency that heavier targets have larger double differential cross-sections and the emitted fragments are more likely to go forward. Besides, the decrease of cross-sections of fragments producing with the increasing emitted angles may follow some kind of pattern.

nucl-ex↗

Design of a 200-MHz Continuous-Wave Radio Frequency Quadrupole Accelerator for Boron Neutron Capture Therapy

A high-intensity continuous wave (CW) radio frequency quadrupole (RFQ) accelerator is designed for boron neutron capture therapy (BNCT). The transmission efficiency of a 20-mA proton beam accelerated from 30 keV to 2.5 MeV can reach 98.7% at an operating frequency of 200 MHz. The beam dynamics has good tolerance to errors. By comparing the high-frequency parameters of quadrilateral and octagonal RFQ cross-sections, the quadrilateral structure of the four-vane cavity is selected owing to its multiple advantages, such as a smaller cross section at the same frequency and easy processing. In addition, tuners and undercuts are designed to tune the frequency of the cavity and achieve a flat electric field distribution along the cavity. In this paper, the beam dynamics simulation and electromagnetic design are presented in detail.

physics.acc-ph↗