arXiv · 1308.1833
The prototyping/early construction phase of the BAIKAL-GVD project
Abstract
The Prototyping phase of the BAIKAL-GVD project has been started in April 2011 with the deployment of a three string engineering array which comprises all basic elements and systems of the Gigaton Volume Detector (GVD) in Lake Baikal. In April 2012 the version of engineering array which comprises the first full-scale string of the GVD demonstration cluster has been deployed and operated during 2012. The first stage of the GVD demonstration cluster which consists of three strings is deployed in April 2013. We review the Prototyping phase of the BAIKAL-GVD project and describe the configuration and design of the 2013 engineering array.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
A. D. Avrorin, A. V. Avrorin, V. M. Aynutdinov, R. Bannasch, I. A. Belolaptikov, D. Yu. Bogorodsky, V. B. Brudanin, N. M. Budnev, I. A. Danilchenko, G. V. Domogatsky, A. A. Doroshenko, A. N. Dyachok, Zh-A. M. Dzhilkibaev, S. V. Fialkovsky, A. R. Gafarov, O. N. Gaponenko, K. V. Golubkov, T. I. Gress, Z. Honz, K. G. Kebkal, O. G. Kebkal, K. V. Konishchev, E. N. Konstantinov, A. V. Korobchenko, A. P. Koshechkin, F. K. Koshel, V. A. Kozhin, V. F. Kulepov, D. A. Kuleshov, V. I. Ljashuk, A. I. Lolenko, M. B. Milenin, R. A. Mirgazov, E. A. Osipova, A. I. Panfilov, L. V. Panjkov, A. A. Perevalov, E. N. Pliskovsky, V. A. Poleshuk, M. I. Rozanov, V. F. Rubtsov, E. V. Rjabov, B. A. Shaybonov, A. A. Sheifler, A. V. Skurikhin, A. A. Smagina, O. V. Suvorova, B. A. Tarashchansky, S. A. Yakovlev, A. V. Zagorodnikov, V. A. Zhukov, V. L. Zurbanov. 2013-08-08. The prototyping/early construction phase of the BAIKAL-GVD project. https://doi.org/10.1016/j.nima.2013.10.064
Cite the original work for its findings. Save a collection to share your selection of sources.