SearcharxivSearch

arXiv · 1506.01526

Coherent network analysis for continuous gravitational wave signals in a pulsar timing array: Pulsar phases as extrinsic parameters

Abstract

Supermassive black hole binaries are one of the primary targets for gravitational wave searches using pulsar timing arrays. Gravitational wave signals from such systems are well represented by parametrized models, allowing the standard Generalized Likelihood Ratio Test (GLRT) to be used for their detection and estimation. However, there is a dichotomy in how the GLRT can be implemented for pulsar timing arrays: there are two possible ways in which one can split the set of signal parameters for semi-analytical and numerical extremization. The straightforward extension of the method used for continuous signals in ground-based gravitational wave searches, where the so-called pulsar phase parameters are maximized numerically, was addressed in an earlier paper (Wang et al. 2014). In this paper, we report the first study of the performance of the second approach where the pulsar phases are maximized semi-analytically. This approach is scalable since the number of parameters left over for numerical optimization does not depend on the size of the pulsar timing array. Our results show that, for the same array size (9 pulsars), the new method performs somewhat worse in parameter estimation, but not in detection, than the previous method where the pulsar phases were maximized numerically. The origin of the performance discrepancy is likely to be in the ill-posedness that is intrinsic to any network analysis method. However, scalability of the new method allows the ill-posedness to be mitigated by simply adding more pulsars to the array. This is shown explicitly by taking a larger array of pulsars.

Explore related subjects

Keep this discovery

BibTeXRIS

Yan Wang, Soumya D. Mohanty, Fredrick A. Jenet. 2015-06-04. Coherent network analysis for continuous gravitational wave signals in a pulsar timing array: Pulsar phases as extrinsic parameters. https://arxiv.org/abs/1506.01526

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The EDD Radio Astronomy Backend Framework

Modern digital radio astronomy receivers produce increasingly wide-bandwidth, high bit-rate data streams that necessitate the development of flexible, scalable, and maintainable backend processing and recording systems. Historically, such backend instrumentation has been tightly coupled to telescope observing modes, limiting reuse between observatories and science cases. We present the Effelsberg Direct Digitisation (EDD) backend framework, a software-defined architecture for constructing real-time radio astronomy backends on commodity off-the-shelf computing infrastructure. We describe its design, implementation, supported observing modes, and operational deployments. EDD separates a common core framework from plugin-provided observing capabilities. The core provides orchestration, telescope interfaces, pipeline lifecycle management, monitoring, and deployment tooling, while plugins implement processing pipelines for specific observing modes. The framework is designed to support both single-dish and interferometric instruments through site-specific configuration and plugin selection. EDD currently supports spectroscopy and spectropolarimetry, pulsar timing and searching, baseband recording, very long baseline interferometry, correlation, and beamforming. Operational deployments include the Effelsberg 100-m telescope, the SKA-MPI prototype dish, the Thai National Radio Telescope, and the ARGOS interferometric prototype array. By separating common services, observing-mode plugins, and site-specific configuration, it allows backend capabilities to be deployed across heterogeneous telescope environments and provides a community resource for broadband radio astronomy instrumentation.

astro-ph.IM

Bayesian Superiority in On/Off analysis

We present a detailed comparison of Bayesian criteria with three non-informative priors - flat, Jeffreys, and scale-invariant - for testing a signal against an unknown background and compare them with the classical frequentist Li-Ma approach in the On/Off problem. We perform Monte Carlo simulations for various background levels and evaluate the Li-Ma and Bayesian criteria by their Type I error rates. We then simulate a nonzero signal and compare the criteria in terms of Type II error rates. We find that the Bayesian criterion with the Jeffreys prior yields lower Type I and Type II error rates than the Li-Ma criterion. In addition, we show that the Bayesian criteria are more robust than the Li-Ma criterion when the background distribution is overdispersed relative to the Poisson distribution.

astro-ph.IM

An RFSoC-based Backend and Timing System for the Balloon-borne Very Long Baseline Interferometry Experiment

We present the design and performance characterization of the digital backend and precision-timing system for the Balloon-borne Very Long Baseline Interferometry Experiment (BVEX), a pathfinder for high-frequency stratospheric VLBI at 22 GHz. The backend uses one of the four 14-bit analog-to-digital converter inputs on an AMD-Xilinx RFSoC 4x2. Although the converters support sampling rates up to 5 GSPS, the flight configuration digitizes the 2-4 GHz intermediate frequency at 4.096 GSPS. CASPER firmware provides both a high-resolution spectrometer for pointing and receiver verification, and a VLBI acquisition chain with two-bit requantization that records at a rate of about 8.2 Gbps. The timestamped data packets are sent over 100 Gigabit Ethernet (GbE) to a 16 TB NVMe array in a storage computer that draws approximately 70-80 W. The timing chain uses a Rakon oven-controlled crystal oscillator as a timing reference while a time-interval counter measures its drift relative to a GPS reference with approximately 60 ps resolution. This is the first deployment of an RFSoC-based VLBI backend and precision-timing system on a stratospheric balloon. Ground tests validated the backend, spectrometer, and timing chain. The August 2025 CSA STRATOS flight ended before reaching the target float altitude because of a balloon failure, and as a result no science observations were obtained. For the planned 2027 reflight, we are developing a conduction-cooled data storage computer with 24 TB of NVMe capacity and a direct data path from the 100 GbE interface to the NVMe array.

astro-ph.IM