Abstract
Negatively answering a question posed by Mnich and Wiese (Math. Program. 154(1-2):533-562), we show that P2|prec,$p_j{\in}\{1,2\}$|$C_{\max}$, the problem of finding a non-preemptive minimum-makespan schedule for precedence-constrained jobs of lengths 1 and 2 on two parallel identical machines, is W[2]-hard parameterized by the width of the partial order giving the precedence constraints. To this end, we show that Shuffle Product, the problem of deciding whether a given word can be obtained by interleaving the letters of $k$ other given words, is W[2]-hard parameterized by $k$, thus additionally answering a question posed by Rizzi and Vialette (CSR 2013). Finally, refining a geometric algorithm due to Servakh (Diskretn. Anal. Issled. Oper. 7(1):75-82), we show that the more general Resource-Constrained Project Scheduling problem is fixed-parameter tractable parameterized by the partial order width combined with the maximum allowed difference between the earliest possible and factual starting time of a job.
Explore related subjects
Keep this discovery
René van Bevern, Robert Bredereck, Laurent Bulteau, Christian Komusiewicz, Nimrod Talmon, Gerhard J. Woeginger. 2016-05-03. Precedence-constrained scheduling problems parameterized by partial order width. https://arxiv.org/abs/1605.00901
Cite the original work for its findings. Save a collection to share your selection of sources.