arXiv · 1706.08264
Adaptive Strategies for The Open-Pit Mine Optimal Scheduling Problem
Abstract
Within the mining discipline, mine planning is the component that studies how to transform the information about the ore resources into value for the owner. For open-pit mines, an optimal block scheduling maximizes the discounted value of the extracted blocks (period by period), called the net present value (NPV). However, to be feasible, a mine schedule must respect the slope constraints. The optimal open-pit block scheduling problem (OPBSP) consists, therefore, in finding such an optimal schedule. On the one hand, we introduce the dynamical optimization approach to mine scheduling in the deterministic case, and we propose a class of (suboptimal) adaptive strategies, the so-called index strategies. We show that they provide upper and lower bounds for the NPV, and we provide numerical results. On the other hand, we introduce a theoretical framework for OPBSP under uncertainty and learning.
Explore related subjects
Keep this discovery
Michel De Lara, Nelson Morales, Nathanaël Beeker. 2017-06-26. Adaptive Strategies for The Open-Pit Mine Optimal Scheduling Problem. https://arxiv.org/abs/1706.08264
Cite the original work for its findings. Save a collection to share your selection of sources.