SearcharxivSearch

arXiv · 1907.03526

Inapproximability Results for Scheduling with Interval and Resource Restrictions

Abstract

In the restricted assignment problem, the input consists of a set of machines and a set of jobs each with a processing time and a subset of eligible machines. The goal is to find an assignment of the jobs to the machines minimizing the makespan, that is, the maximum summed up processing time any machine receives. Herein, jobs should only be assigned to those machines on which they are eligible. It is well-known that there is no polynomial time approximation algorithm with an approximation guarantee of less than 1.5 for the restricted assignment problem unless P=NP. In this work, we show hardness results for variants of the restricted assignment problem with particular types of restrictions. In the case of interval restrictions the machines can be totally ordered such that jobs are eligible on consecutive machines. We resolve the open question of whether the problem admits a polynomial time approximation scheme (PTAS) in the negative (unless P=NP). There are several special cases of this problem known to admit a PTAS. Furthermore, we consider a variant with resource restriction where each machine has capacities and each job demands for a fixed number of resources. A job is eligible on a machine if its demand is at most the capacity of the machine for each resource. For one resource, this problem is known to admit a PTAS, for two, the case of interval restrictions is contained, and in general, the problem is closely related to unrelated scheduling with a low rank processing time matrix. We show that there is no polynomial time approximation algorithm with a rate smaller than 48/47 or 1.5 for scheduling with resource restrictions with 2 or 4 resources, respectively, unless P=NP. All our results can be extended to the so called Santa Claus variants of the problems where the goal is to maximize the minimal processing time any machine receives.

Explore related subjects

Keep this discovery

BibTeXRIS

Marten Maack, Klaus Jansen. 2019-07-08. Inapproximability Results for Scheduling with Interval and Resource Restrictions. https://arxiv.org/abs/1907.03526

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The Computational Complexity of Holant Problems on 4-regular Graphs from the Stable Subgroup Sequence of $SL(2,\mathbb{C})$

The Holant framework provides a general setting for studying counting problems and includes graph homomorphisms (\#GH) and counting constraint satisfaction problems (\#CSP) as special cases. Over the past twenty years, a series of computational complexity dichotomies have been established for Holant problems, but the classification for complex-valued signatures is still open. The main obstacle is the case in which all signatures have even arity. In this paper, we establish a dichotomy for Holant problems with a complex-valued 4-ary signature, which is a key base case for the full classification of Holant problems. We present a new strategy by introducing Schur's theorem, the classification of finite subgroups of $\mathrm{SL}(2,\mathbb{C})$ and stable subgroup sequences into the proof. These new techniques are of independent interest.

cs.CC

Topology inside NC$^1$

We show that ACC$^0$ is precisely what can be computed with constant-width circuits of polynomial size and polylogarithmic genus. This extends a characterization given by Hansen, showing that planar constant-width circuits also characterize ACC$^0$. Thus polylogarithmic genus provides no additional computational power in this model. We consider other generalizations of planarity, including crossing number and thickness. We show that constant-width circuits of polynomial size and thickness two already suffice to capture all of NC$^1$.

cs.CC