SearcharxivSearch

arXiv subjects

Marten Maack

Publications and source records attributed to Marten Maack.

14 recordsLinked to original sources

Server Cloud Scheduling

Consider a set of jobs connected to a directed acyclic task graph with a fixed source and sink. The edges of this graph model precedence constraints and the jobs have to be scheduled with respect to those. We introduce the Server Cloud Scheduling problem, in which the jobs have to be processed either on a single local machine or on one of many cloud machines. Both the source and the sink have to be scheduled on the local machine. For each job, processing times both on the server and in the cloud are given. Furthermore, for each edge in the task graph, a communication delay is included in the input and has to be taken into account if one of the two jobs is scheduled on the server, the other in the cloud. The server can process jobs sequentially, whereas the cloud can serve as many as needed in parallel, but induces costs. We consider both makespan and cost minimization. The main results are an FPTAS with respect for the makespan objective for a fairly general case and strong hardness for the case with unit processing times and delays.

cs.DS

Scheduling with Many Shared Resources

Consider the many shared resource scheduling problem where jobs have to be scheduled on identical parallel machines with the goal of minimizing the makespan. However, each job needs exactly one additional shared resource in order to be executed and hence prevents the execution of jobs that need the same resource while being processed. Previously a $(2m/(m+1))$-approximation was the best known result for this problem. Furthermore, a $6/5$-approximation for the case with only two machines was known as well as a PTAS for the case with a constant number of machines. We present a simple and fast 5/3-approximation and a much more involved but still reasonable 1.5-approximation. Furthermore, we provide a PTAS for the case with only a constant number of machines, which is arguably simpler and faster than the previously known one, as well as a PTAS with resource augmentation for the general case. The approximation schemes make use of the N-fold integer programming machinery, which has found more and more applications in the field of scheduling recently. It is plausible that the latter results can be improved and extended to more general cases. Lastly, we give a $5/4 - \varepsilon$ inapproximability result for the natural problem extension where each job may need up to a constant number (in particular $3$) of different resources.

cs.DS

Online Load Balancing on Uniform Machines with Limited Migration

In the problem of online load balancing on uniformly related machines with bounded migration, jobs arrive online one after another and have to be immediately placed on one of a given set of machines without knowledge about jobs that may arrive later on. Each job has a size and each machine has a speed, and the load due to a job assigned to a machine is obtained by dividing the first value by the second. The goal is to minimize the maximum overall load any machine receives. However, unlike in the pure online case, each time a new job arrives it contributes a migration potential equal to the product of its size and a certain migration factor. This potential can be spend to reassign jobs either right away (non-amortized case) or at any later time (amortized case). Semi-online models of this flavor have been studied intensively for several fundamental problems, e.g., load balancing on identical machines and bin packing, but uniformly related machines have not been considered up to now. In the present paper, the classical doubling strategy on uniformly related machines is combined with migration to achieve an $(8/3+\varepsilon)$-competitive algorithm and a $(4+\varepsilon)$-competitive algorithm with $O(1/\varepsilon)$ amortized and non-amortized migration, respectively, while the best known competitive ratio in the pure online setting is roughly $5.828$.

cs.DS

(In-)Approximability Results for Interval, Resource Restricted, and Low Rank Scheduling

We consider variants of the restricted assignment problem where a set of jobs has to be assigned to a set of machines, for each job a size and a set of eligible machines is given, and the jobs may only be assigned to eligible machines with the goal of makespan minimization. For the variant with interval restrictions, where the machines can be arranged on a path such that each job is eligible on a subpath, we present the first better than $2$-approximation and an improved inapproximability result. In particular, we give a $(2-\frac{1}{24})$-approximation and show that no better than $9/8$-approximation is possible, unless P=NP. Furthermore, we consider restricted assignment with $R$ resource restrictions and rank $D$ unrelated scheduling. In the former problem, a machine may process a job if it can meet its resource requirements regarding $R$ (renewable) resources. In the latter, the size of a job is dependent on the machine it is assigned to and the corresponding processing time matrix has rank at most $D$. The problem with interval restrictions includes the 1 resource variant, is encompassed by the 2 resource variant, and regarding approximation the $R$ resource variant is essentially a special case of the rank $R+1$ problem. We show that no better than $3/2$, $8/7$, and $3/2$-approximation is possible (unless P=NP) for the 3 resource, 2 resource, and rank 3 variant, respectively. Both the approximation result for the interval case and the inapproximability result for the rank 3 variant are solutions to open challenges stated in previous works. Lastly, we also consider the reverse objective, that is, maximizing the minimal load any machine receives, and achieve similar results.

cs.DS

Cardinality Constrained Scheduling in Online Models

Makespan minimization on parallel identical machines is a classical and intensively studied problem in scheduling, and a classic example for online algorithm analysis with Graham's famous list scheduling algorithm dating back to the 1960s. In this problem, jobs arrive over a list and upon an arrival, the algorithm needs to assign the job to a machine. The goal is to minimize the makespan, that is, the maximum machine load. In this paper, we consider the variant with an additional cardinality constraint: The algorithm may assign at most $k$ jobs to each machine where $k$ is part of the input. While the offline (strongly NP-hard) variant of cardinality constrained scheduling is well understood and an EPTAS exists here, no non-trivial results are known for the online variant. We fill this gap by making a comprehensive study of various different online models. First, we show that there is a constant competitive algorithm for the problem and further, present a lower bound of $2$ on the competitive ratio of any online algorithm. Motivated by the lower bound, we consider a semi-online variant where upon arrival of a job of size $p$, we are allowed to migrate jobs of total size at most a constant times $p$. This constant is called the migration factor of the algorithm. Algorithms with small migration factors are a common approach to bridge the performance of online algorithms and offline algorithms. One can obtain algorithms with a constant migration factor by rounding the size of each incoming job and then applying an ordinal algorithm to the resulting rounded instance. With this in mind, we also consider the framework of ordinal algorithms and characterize the competitive ratio that can be achieved using the aforementioned approaches.

cs.DS

Total Completion Time Minimization for Scheduling with Incompatibility Cliques

This paper considers parallel machine scheduling with incompatibilities between jobs. The jobs form a graph and no two jobs connected by an edge are allowed to be assigned to the same machine. In particular, we study the case where the graph is a collection of disjoint cliques. Scheduling with incompatibilities between jobs represents a well-established line of research in scheduling theory and the case of disjoint cliques has received increasing attention in recent years. While the research up to this point has been focused on the makespan objective, we broaden the scope and study the classical total completion time criterion. In the setting without incompatibilities, this objective is well known to admit polynomial time algorithms even for unrelated machines via matching techniques. We show that the introduction of incompatibility cliques results in a richer, more interesting picture. Scheduling on identical machines remains solvable in polynomial time, while scheduling on unrelated machines becomes APX-hard. Furthermore, we study the problem under the paradigm of fixed-parameter tractable algorithms (FPT). In particular, we consider a problem variant with assignment restrictions for the cliques rather than the jobs. We prove that it is NP-hard and can be solved in FPT time with respect to the number of cliques. Moreover, we show that the problem on unrelated machines can be solved in FPT time for reasonable parameters, e.g., the parameter pair: number of machines and maximum processing time. The latter result is a natural extension of known results for the case without incompatibilities and can even be extended to the case of total weighted completion time. All of the FPT results make use of n-fold Integer Programs that recently have received great attention by proving their usefulness for scheduling problems.

cs.CC

Solving Packing Problems with Few Small Items Using Rainbow Matchings

An important area of combinatorial optimization is the study of packing and covering problems, such as Bin Packing, Multiple Knapsack, and Bin Covering. Those problems have been studied extensively from the viewpoint of approximation algorithms, but their parameterized complexity has only been investigated barely. For problem instances containing no "small" items, classical matching algorithms yield optimal solutions in polynomial time. In this paper we approach them by their distance from triviality, measuring the problem complexity by the number $k$ of small items. Our main results are fixed-parameter algorithms for vector versions of Bin Packing, Multiple Knapsack, and Bin Covering parameterized by $k$. The algorithms are randomized with one-sided error and run in time $4^{k} \cdot k! \cdot n^{O(1)}$. To achieve this, we introduce a colored matching problem to which we reduce all these packing problems. The colored matching problem is natural in itself and we expect it to be useful for other applications. We also present a deterministic fixed-parameter for Bin Packing with run time $(k!)^{2}\cdot k \cdot 2^{k}\cdot n\cdot \log(n)$.

cs.DS

Approximation Algorithms for Scheduling with Class Constraints

Assigning jobs onto identical machines with the objective to minimize the maximal load is one of the most basic problems in combinatorial optimization. Motivated by product planing and data placement, we study a natural extension called Class Constrainted Scheduling (CCS). In this problem, each job additionally belongs to a class and each machine can only schedule jobs from at most $c$ different classes. Even though this problem is closely related to the Class Constraint Bin Packing, the Class Constraint Knapsack and the Cardinality Constraint variants, CCS lacks results regarding approximation algorithms, even though it is also well-known to be NP-hard. We fill this gap by analyzing the problem considering three different ways to feasibly allot the jobs: The splittable case, where we can split and allot the jobs arbitrarily; the preemptive case, where jobs pieces belonging to the same job are not allowed to be scheduled in parallel; and finally the non-preemptive case, where no splitting is allowed at all. For each case we introduce the first PTAS where neither $c$ nor the number of all classes have to be a constant. In order to achieve this goal, we give new insights about the structure of optimal solutions. This allows us to preprocess the instance appropriately and by additionally grouping variables to set up a configuration Integer Linear Program (ILP) with N-fold structure. This N-fold structure allows us to solve the ILP efficiently. Further we developed the first simple approximation algorithms with a constant approximation ratio running in strongly polynomial time. The splittable and the preemptive case admit algorithms with ratio $2$ and a running time of $O(n^2 \log(n))$. The algorithm for the non-preemptive case has a ratio of $7/3$ and a running time of $O(n^2 \log^2(n))$. All results even hold if the number of machines cannot be bounded by a polynomial in $n$.

cs.DS

Inapproximability Results for Scheduling with Interval and Resource Restrictions

In the restricted assignment problem, the input consists of a set of machines and a set of jobs each with a processing time and a subset of eligible machines. The goal is to find an assignment of the jobs to the machines minimizing the makespan, that is, the maximum summed up processing time any machine receives. Herein, jobs should only be assigned to those machines on which they are eligible. It is well-known that there is no polynomial time approximation algorithm with an approximation guarantee of less than 1.5 for the restricted assignment problem unless P=NP. In this work, we show hardness results for variants of the restricted assignment problem with particular types of restrictions. In the case of interval restrictions the machines can be totally ordered such that jobs are eligible on consecutive machines. We resolve the open question of whether the problem admits a polynomial time approximation scheme (PTAS) in the negative (unless P=NP). There are several special cases of this problem known to admit a PTAS. Furthermore, we consider a variant with resource restriction where each machine has capacities and each job demands for a fixed number of resources. A job is eligible on a machine if its demand is at most the capacity of the machine for each resource. For one resource, this problem is known to admit a PTAS, for two, the case of interval restrictions is contained, and in general, the problem is closely related to unrelated scheduling with a low rank processing time matrix. We show that there is no polynomial time approximation algorithm with a rate smaller than 48/47 or 1.5 for scheduling with resource restrictions with 2 or 4 resources, respectively, unless P=NP. All our results can be extended to the so called Santa Claus variants of the problems where the goal is to maximize the minimal processing time any machine receives.

cs.CC

Online Bin Covering with Limited Migration

Semi-online models where decisions may be revoked in a limited way have been studied extensively in the last years. This is motivated by the fact that the pure online model is often too restrictive to model real-world applications, where some changes might be allowed. A well-studied measure of the amount of decisions that can be revoked is the migration factor $β$: When an object $o$ of size $s(o)$ arrives, the decisions for objects of total size at most $β\cdot s(o)$ may be revoked. Usually $β$ should be a constant. This means that a small object only leads to small changes. This measure has been successfully investigated for different, classic problems such as bin packing or makespan minimization. The dual of makespan minimization - the Santa Claus or machine covering problem - has also been studied, whereas the dual of bin packing - the bin covering problem - has not been looked at from such a perspective. In this work, we extensively study the bin covering problem with migration in different scenarios. We develop algorithms both for the static case - where only insertions are allowed - and for the dynamic case, where items may also depart. We also develop lower bounds for these scenarios both for amortized migration and for worst-case migration showing that our algorithms have nearly optimal migration factor and asymptotic competitive ratio (up to an arbitrary small $\eps$). We therefore resolve the competitiveness of the bin covering problem with migration.

cs.DS

Empowering the Configuration-IP $-$ New PTAS Results for Scheduling with Setups Times

Integer linear programs of configurations, or configuration IPs, are a classical tool in the design of algorithms for scheduling and packing problems, where a set of items has to be placed in multiple target locations. Herein a configuration describes a possible placement on one of the target locations, and the IP is used to chose suitable configurations covering the items. We give an augmented IP formulation, which we call the module configuration IP. It can be described within the framework of n-fold integer programming and therefore be solved efficiently. As an application, we consider scheduling problems with setup times, in which a set of jobs has to be scheduled on a set of identical machines, with the objective of minimizing the makespan. For instance, we investigate the case that jobs can be split and scheduled on multiple machines. However, before a part of a job can be processed an uninterrupted setup depending on the job has to be paid. For both of the variants that jobs can be executed in parallel or not, we obtain an efficient polynomial time approximation scheme (EPTAS) of running time $f(1/\varepsilon)\times \mathrm{poly}(|I|)$ with a single exponential term in $f$ for the first and a double exponential one for the second case. Previously, only constant factor approximations of $5/3$ and $4/3 + \varepsilon$ respectively were known. Furthermore, we present an EPTAS for a problem where classes of (non-splittable) jobs are given, and a setup has to be paid for each class of jobs being executed on one machine.

cs.DS

Scheduling on (Un-)Related Machines with Setup Times

We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches from processing jobs of one class to jobs of a different class. During such a setup, a machine cannot process jobs and the duration of a setup may depend on the machine as well as the class of the job to be processed next. For this problem, we study approximation algorithms for non-identical machines. We develop a polynomial-time approximation scheme for uniformly related machines. For unrelated machines we obtain an $O(\log n + \log m)$-approximation, which we show to be optimal (up to constant factors) unless $NP \subset RP$. We also identify two special cases that admit constant factor approximations.

cs.DS

An EPTAS for Scheduling on Unrelated Machines of Few Different Types

In the classical problem of scheduling on unrelated parallel machines, a set of jobs has to be assigned to a set of machines. The jobs have a processing time depending on the machine and the goal is to minimize the makespan, that is the maximum machine load. It is well known that this problem is NP-hard and does not allow polynomial time approximation algorithms with approximation guarantees smaller than $1.5$ unless P$=$NP. We consider the case that there are only a constant number $K$ of machine types. Two machines have the same type if all jobs have the same processing time for them. This variant of the problem is strongly NP-hard already for $K=1$. We present an efficient polynomial time approximation scheme (EPTAS) for the problem, that is, for any $\varepsilon > 0$ an assignment with makespan of length at most $(1+\varepsilon)$ times the optimum can be found in polynomial time in the input length and the exponent is independent of $1/\varepsilon$. In particular we achieve a running time of $2^{\mathcal{O}(K\log(K) \frac{1}{\varepsilon}\log^4 \frac{1}{\varepsilon})}+\mathrm{poly}(|I|)$, where $|I|$ denotes the input length. Furthermore, we study three other problem variants and present an EPTAS for each of them: The Santa Claus problem, where the minimum machine load has to be maximized; the case of scheduling on unrelated parallel machines with a constant number of uniform types, where machines of the same type behave like uniformly related machines; and the multidimensional vector scheduling variant of the problem where both the dimension and the number of machine types are constant. For the Santa Claus problem we achieve the same running time. The results are achieved, using mixed integer linear programming and rounding techniques.

cs.DS

Structural Parameters for Scheduling with Assignment Restrictions

We consider scheduling on identical and unrelated parallel machines with job assignment restrictions. These problems are NP-hard and they do not admit polynomial time approximation algorithms with approximation ratios smaller than $1.5$ unless P$=$NP. However, if we impose limitations on the set of machines that can process a job, the problem sometimes becomes easier in the sense that algorithms with approximation ratios better than $1.5$ exist. We introduce three graphs, based on the assignment restrictions and study the computational complexity of the scheduling problem with respect to structural properties of these graphs, in particular their tree- and rankwidth. We identify cases that admit polynomial time approximation schemes or FPT algorithms, generalizing and extending previous results in this area.

cs.DS