SearcharxivSearch

arXiv · 2003.06317

A telescope control and scheduling system for the Gravitational-wave Optical Transient Observer

Abstract

The detection of the first electromagnetic counterpart to a gravitational-wave signal in August 2017 marked the start of a new era of multi-messenger astrophysics. An unprecedented number of telescopes around the world were involved in hunting for the source of the signal, and although more gravitational-wave signals have been since detected, no further electromagnetic counterparts have been found. In this thesis, I present my work to help build a telescope dedicated to the hunt for these elusive sources: the Gravitational-wave Optical Transient Observer (GOTO). I detail the creation of the GOTO Telescope Control System, G-TeCS, which includes the software required to control multiple wide-field telescopes on a single robotic mount. G-TeCS also includes software that enables the telescope to complete a sky survey and transient alert follow-up observations completely autonomously, whilst monitoring the weather conditions and automatically fixing any hardware issues that arise. I go on to describe the routines used to determine target priorities, as well as how the all-sky survey grid is defined, how gravitational-wave and other transient alerts are received and processed, and how the optimum follow-up strategies for these events were determined. The GOTO prototype, situated on La Palma, saw first light in June 2017. I detail the work I carried out on the site to help commission the prototype, and how the control software was developed during the commissioning phase. I also analyse the GOTO CCD cameras and optics, building a complete theoretical model of the system to confirm the performance of the prototype. Finally, I describe the results of simulations I carried out predicting the future of the GOTO project, with multiple robotic telescopes on La Palma and in Australia, and how G-TeCS might be modified to operate these telescopes as a single, global observatory.

Explore related subjects

Keep this discovery

BibTeXRIS

Martin J Dyer. 2020-03-13. A telescope control and scheduling system for the Gravitational-wave Optical Transient Observer. https://arxiv.org/abs/2003.06317

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The EDD Radio Astronomy Backend Framework

Modern digital radio astronomy receivers produce increasingly wide-bandwidth, high bit-rate data streams that necessitate the development of flexible, scalable, and maintainable backend processing and recording systems. Historically, such backend instrumentation has been tightly coupled to telescope observing modes, limiting reuse between observatories and science cases. We present the Effelsberg Direct Digitisation (EDD) backend framework, a software-defined architecture for constructing real-time radio astronomy backends on commodity off-the-shelf computing infrastructure. We describe its design, implementation, supported observing modes, and operational deployments. EDD separates a common core framework from plugin-provided observing capabilities. The core provides orchestration, telescope interfaces, pipeline lifecycle management, monitoring, and deployment tooling, while plugins implement processing pipelines for specific observing modes. The framework is designed to support both single-dish and interferometric instruments through site-specific configuration and plugin selection. EDD currently supports spectroscopy and spectropolarimetry, pulsar timing and searching, baseband recording, very long baseline interferometry, correlation, and beamforming. Operational deployments include the Effelsberg 100-m telescope, the SKA-MPI prototype dish, the Thai National Radio Telescope, and the ARGOS interferometric prototype array. By separating common services, observing-mode plugins, and site-specific configuration, it allows backend capabilities to be deployed across heterogeneous telescope environments and provides a community resource for broadband radio astronomy instrumentation.

astro-ph.IM

Bayesian Superiority in On/Off analysis

We present a detailed comparison of Bayesian criteria with three non-informative priors - flat, Jeffreys, and scale-invariant - for testing a signal against an unknown background and compare them with the classical frequentist Li-Ma approach in the On/Off problem. We perform Monte Carlo simulations for various background levels and evaluate the Li-Ma and Bayesian criteria by their Type I error rates. We then simulate a nonzero signal and compare the criteria in terms of Type II error rates. We find that the Bayesian criterion with the Jeffreys prior yields lower Type I and Type II error rates than the Li-Ma criterion. In addition, we show that the Bayesian criteria are more robust than the Li-Ma criterion when the background distribution is overdispersed relative to the Poisson distribution.

astro-ph.IM

An RFSoC-based Backend and Timing System for the Balloon-borne Very Long Baseline Interferometry Experiment

We present the design and performance characterization of the digital backend and precision-timing system for the Balloon-borne Very Long Baseline Interferometry Experiment (BVEX), a pathfinder for high-frequency stratospheric VLBI at 22 GHz. The backend uses one of the four 14-bit analog-to-digital converter inputs on an AMD-Xilinx RFSoC 4x2. Although the converters support sampling rates up to 5 GSPS, the flight configuration digitizes the 2-4 GHz intermediate frequency at 4.096 GSPS. CASPER firmware provides both a high-resolution spectrometer for pointing and receiver verification, and a VLBI acquisition chain with two-bit requantization that records at a rate of about 8.2 Gbps. The timestamped data packets are sent over 100 Gigabit Ethernet (GbE) to a 16 TB NVMe array in a storage computer that draws approximately 70-80 W. The timing chain uses a Rakon oven-controlled crystal oscillator as a timing reference while a time-interval counter measures its drift relative to a GPS reference with approximately 60 ps resolution. This is the first deployment of an RFSoC-based VLBI backend and precision-timing system on a stratospheric balloon. Ground tests validated the backend, spectrometer, and timing chain. The August 2025 CSA STRATOS flight ended before reaching the target float altitude because of a balloon failure, and as a result no science observations were obtained. For the planned 2027 reflight, we are developing a conduction-cooled data storage computer with 24 TB of NVMe capacity and a direct data path from the 100 GbE interface to the NVMe array.

astro-ph.IM