SearcharxivSearch

arXiv · 2011.06150

Total Completion Time Minimization for Scheduling with Incompatibility Cliques

Abstract

This paper considers parallel machine scheduling with incompatibilities between jobs. The jobs form a graph and no two jobs connected by an edge are allowed to be assigned to the same machine. In particular, we study the case where the graph is a collection of disjoint cliques. Scheduling with incompatibilities between jobs represents a well-established line of research in scheduling theory and the case of disjoint cliques has received increasing attention in recent years. While the research up to this point has been focused on the makespan objective, we broaden the scope and study the classical total completion time criterion. In the setting without incompatibilities, this objective is well known to admit polynomial time algorithms even for unrelated machines via matching techniques. We show that the introduction of incompatibility cliques results in a richer, more interesting picture. Scheduling on identical machines remains solvable in polynomial time, while scheduling on unrelated machines becomes APX-hard. Furthermore, we study the problem under the paradigm of fixed-parameter tractable algorithms (FPT). In particular, we consider a problem variant with assignment restrictions for the cliques rather than the jobs. We prove that it is NP-hard and can be solved in FPT time with respect to the number of cliques. Moreover, we show that the problem on unrelated machines can be solved in FPT time for reasonable parameters, e.g., the parameter pair: number of machines and maximum processing time. The latter result is a natural extension of known results for the case without incompatibilities and can even be extended to the case of total weighted completion time. All of the FPT results make use of n-fold Integer Programs that recently have received great attention by proving their usefulness for scheduling problems.

Explore related subjects

Keep this discovery

BibTeXRIS

Klaus Jansen, Alexandra Lassota, Marten Maack, Tytus Pikies. 2020-11-12. Total Completion Time Minimization for Scheduling with Incompatibility Cliques. https://arxiv.org/abs/2011.06150

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The Computational Complexity of Holant Problems on 4-regular Graphs from the Stable Subgroup Sequence of $SL(2,\mathbb{C})$

The Holant framework provides a general setting for studying counting problems and includes graph homomorphisms (\#GH) and counting constraint satisfaction problems (\#CSP) as special cases. Over the past twenty years, a series of computational complexity dichotomies have been established for Holant problems, but the classification for complex-valued signatures is still open. The main obstacle is the case in which all signatures have even arity. In this paper, we establish a dichotomy for Holant problems with a complex-valued 4-ary signature, which is a key base case for the full classification of Holant problems. We present a new strategy by introducing Schur's theorem, the classification of finite subgroups of $\mathrm{SL}(2,\mathbb{C})$ and stable subgroup sequences into the proof. These new techniques are of independent interest.

cs.CC

Topology inside NC$^1$

We show that ACC$^0$ is precisely what can be computed with constant-width circuits of polynomial size and polylogarithmic genus. This extends a characterization given by Hansen, showing that planar constant-width circuits also characterize ACC$^0$. Thus polylogarithmic genus provides no additional computational power in this model. We consider other generalizations of planarity, including crossing number and thickness. We show that constant-width circuits of polynomial size and thickness two already suffice to capture all of NC$^1$.

cs.CC