arXiv · 2111.00304
Electronics integration for the GE2/1 and ME0 GEM detector systems for the CMS Phase-2 Muon System Upgrade
Abstract
The Large Hadron Collider is currently undergoing its High Luminosity upgrade, which is set to increase the instantaneous luminosity by about a factor of five. Consequently, the Compact Muon Solenoid experiment is upgrading its muon spectrometer to cope with the increased muon flux in the forward region. The GE2/1 triple-Gas Electron Multiplier detector, which has recently entered the mass production phase, and the ME0 triple-GEM detector system, which is in the late prototyping phase, are undergoing electronics integration. These proceedings briefly discuss the frontend electronics for the GE2/1 and ME0 detector systems, the electronics integration testing process, and the future plans for the frontend electronics of these two detector systems by the CMS GEM Collaboration.
Explore related subjects
Keep this discovery
Stephen D. Butalla, Marcus Hohlmann. 2021-10-30. Electronics integration for the GE2/1 and ME0 GEM detector systems for the CMS Phase-2 Muon System Upgrade. https://doi.org/10.1088/1748-0221%2F17%2F05%2Fc05002
Cite the original work for its findings. Save a collection to share your selection of sources.