SearcharxivSearch

arXiv · 2204.12362

The carbon footprint of IRAP

Abstract

We present an assessment of the greenhouse gases emissions of the Institute for Research in Astrophysics and Planetology (IRAP), located in Toulouse (France). It was performed following the established "Bilan Carbone" methodology, over a large scope compared to similar previous studies, including in particular the contribution from the purchase of goods and services as well as IRAP's use of external research infrastructures, such as ground-based observatories and space-borne facilities. The carbon footprint of the institute for the reference year 2019 is 7400 +/- 900 tCO2e. If we exclude the contribution from external research infrastructures to focus on a restricted perimeter over which the institute has some operational control, IRAP's emissions in 2019 amounted to 3300 +/- 400 tCO2e. Over the restricted perimeter, the contribution from purchasing goods and services is dominant, about 40% of the total, slightly exceeding the contribution from professional travel including hotel stays, which accounts for 38%. Local infrastructures make a smaller contribution to IRAP's carbon footprint, about 25% over the restricted perimeter. We note that this repartition may be specific to IRAP, since the energy used to produce the electricity and heating has a relatively low carbon footprint. Over the full perimeter, the large share from the use of ground-based observatories and space-borne facilities and the fact that the majority of IRAP purchases are related to instrument development indicate that research infrastructures represent the most significant challenge for reducing the carbon footprint of research at our institute. With ~260 staff members employed, our results imply that performing research in astronomy and astrophysics at IRAP according to the standards of 2019 produces average GHG emissions of 28 tCO2e/yr per person involved in that activity (Abridged).

Explore related subjects

Keep this discovery

BibTeXRIS

Pierrick Martin, Sylvie Brau-Nogué, Mickael Coriat, Philippe Garnier, Annie Hughes, Jürgen Knödlseder, Luigi Tibaldo. 2022-04-26. The carbon footprint of IRAP. https://arxiv.org/abs/2204.12362

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The EDD Radio Astronomy Backend Framework

Modern digital radio astronomy receivers produce increasingly wide-bandwidth, high bit-rate data streams that necessitate the development of flexible, scalable, and maintainable backend processing and recording systems. Historically, such backend instrumentation has been tightly coupled to telescope observing modes, limiting reuse between observatories and science cases. We present the Effelsberg Direct Digitisation (EDD) backend framework, a software-defined architecture for constructing real-time radio astronomy backends on commodity off-the-shelf computing infrastructure. We describe its design, implementation, supported observing modes, and operational deployments. EDD separates a common core framework from plugin-provided observing capabilities. The core provides orchestration, telescope interfaces, pipeline lifecycle management, monitoring, and deployment tooling, while plugins implement processing pipelines for specific observing modes. The framework is designed to support both single-dish and interferometric instruments through site-specific configuration and plugin selection. EDD currently supports spectroscopy and spectropolarimetry, pulsar timing and searching, baseband recording, very long baseline interferometry, correlation, and beamforming. Operational deployments include the Effelsberg 100-m telescope, the SKA-MPI prototype dish, the Thai National Radio Telescope, and the ARGOS interferometric prototype array. By separating common services, observing-mode plugins, and site-specific configuration, it allows backend capabilities to be deployed across heterogeneous telescope environments and provides a community resource for broadband radio astronomy instrumentation.

astro-ph.IM

Bayesian Superiority in On/Off analysis

We present a detailed comparison of Bayesian criteria with three non-informative priors - flat, Jeffreys, and scale-invariant - for testing a signal against an unknown background and compare them with the classical frequentist Li-Ma approach in the On/Off problem. We perform Monte Carlo simulations for various background levels and evaluate the Li-Ma and Bayesian criteria by their Type I error rates. We then simulate a nonzero signal and compare the criteria in terms of Type II error rates. We find that the Bayesian criterion with the Jeffreys prior yields lower Type I and Type II error rates than the Li-Ma criterion. In addition, we show that the Bayesian criteria are more robust than the Li-Ma criterion when the background distribution is overdispersed relative to the Poisson distribution.

astro-ph.IM

An RFSoC-based Backend and Timing System for the Balloon-borne Very Long Baseline Interferometry Experiment

We present the design and performance characterization of the digital backend and precision-timing system for the Balloon-borne Very Long Baseline Interferometry Experiment (BVEX), a pathfinder for high-frequency stratospheric VLBI at 22 GHz. The backend uses one of the four 14-bit analog-to-digital converter inputs on an AMD-Xilinx RFSoC 4x2. Although the converters support sampling rates up to 5 GSPS, the flight configuration digitizes the 2-4 GHz intermediate frequency at 4.096 GSPS. CASPER firmware provides both a high-resolution spectrometer for pointing and receiver verification, and a VLBI acquisition chain with two-bit requantization that records at a rate of about 8.2 Gbps. The timestamped data packets are sent over 100 Gigabit Ethernet (GbE) to a 16 TB NVMe array in a storage computer that draws approximately 70-80 W. The timing chain uses a Rakon oven-controlled crystal oscillator as a timing reference while a time-interval counter measures its drift relative to a GPS reference with approximately 60 ps resolution. This is the first deployment of an RFSoC-based VLBI backend and precision-timing system on a stratospheric balloon. Ground tests validated the backend, spectrometer, and timing chain. The August 2025 CSA STRATOS flight ended before reaching the target float altitude because of a balloon failure, and as a result no science observations were obtained. For the planned 2027 reflight, we are developing a conduction-cooled data storage computer with 24 TB of NVMe capacity and a direct data path from the 100 GbE interface to the NVMe array.

astro-ph.IM