SearcharxivSearch

arXiv · 2208.05418

Instrumentation for Radio Interferometers with Antennas on a Regular Grid

Abstract

In the past two decades, a rebirth of interest in low-frequency radio astronomy for 21 cm tomography of the Epoch of Reionization, has given rise to a new class of radio interferometers with $N \gg 100$ antennas. The availability of low-noise receivers that do not require cryogenic cooling has driven down the cost of antennas, making it affordable to build sensitivity with numerous small antennas rather than large dish structures. However, the computational- and storage-costs of such radio arrays, determined by the $\mathcal{O}(N^2)$ scaling of visibility products required for calibration and imaging, become proportional to the cost of the array itself and drive up the overall cost of the radio telescope. When antennas in the array are built on a regular grid, direct-imaging methods based on spatial Fourier transforms of the array can be exploited to avoid computing the intermediate visibility matrices that drive the unfavorable scaling. However, such methods rely on the availability of calibrated antenna voltages which are themselves difficult to obtain without using visibility matrices. In this thesis, I explore two real-time calibration strategies that can operate on subsets of visibility matrices, which can be computed without compromising on the $\mathcal{O}(N\log{N})$ scaling of direct-imaging systems. For more general radio interferometer layouts, baseline-dependent averaging with fringe stopping can be used to decrease the data rate of visibility products. The signal processing pipeline built for the Hydrogen Epoch of Reionization Array (HERA) is outlined in this thesis, which implements both fringe stopping and baseline dependent averaging to bring down the data rate from nearly 1 Tbps to 15 Gbps.

Explore related subjects

Keep this discovery

BibTeXRIS

Deepthi Gorthi. 2022-08-08. Instrumentation for Radio Interferometers with Antennas on a Regular Grid. https://arxiv.org/abs/2208.05418

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The EDD Radio Astronomy Backend Framework

Modern digital radio astronomy receivers produce increasingly wide-bandwidth, high bit-rate data streams that necessitate the development of flexible, scalable, and maintainable backend processing and recording systems. Historically, such backend instrumentation has been tightly coupled to telescope observing modes, limiting reuse between observatories and science cases. We present the Effelsberg Direct Digitisation (EDD) backend framework, a software-defined architecture for constructing real-time radio astronomy backends on commodity off-the-shelf computing infrastructure. We describe its design, implementation, supported observing modes, and operational deployments. EDD separates a common core framework from plugin-provided observing capabilities. The core provides orchestration, telescope interfaces, pipeline lifecycle management, monitoring, and deployment tooling, while plugins implement processing pipelines for specific observing modes. The framework is designed to support both single-dish and interferometric instruments through site-specific configuration and plugin selection. EDD currently supports spectroscopy and spectropolarimetry, pulsar timing and searching, baseband recording, very long baseline interferometry, correlation, and beamforming. Operational deployments include the Effelsberg 100-m telescope, the SKA-MPI prototype dish, the Thai National Radio Telescope, and the ARGOS interferometric prototype array. By separating common services, observing-mode plugins, and site-specific configuration, it allows backend capabilities to be deployed across heterogeneous telescope environments and provides a community resource for broadband radio astronomy instrumentation.

astro-ph.IM

Bayesian Superiority in On/Off analysis

We present a detailed comparison of Bayesian criteria with three non-informative priors - flat, Jeffreys, and scale-invariant - for testing a signal against an unknown background and compare them with the classical frequentist Li-Ma approach in the On/Off problem. We perform Monte Carlo simulations for various background levels and evaluate the Li-Ma and Bayesian criteria by their Type I error rates. We then simulate a nonzero signal and compare the criteria in terms of Type II error rates. We find that the Bayesian criterion with the Jeffreys prior yields lower Type I and Type II error rates than the Li-Ma criterion. In addition, we show that the Bayesian criteria are more robust than the Li-Ma criterion when the background distribution is overdispersed relative to the Poisson distribution.

astro-ph.IM

An RFSoC-based Backend and Timing System for the Balloon-borne Very Long Baseline Interferometry Experiment

We present the design and performance characterization of the digital backend and precision-timing system for the Balloon-borne Very Long Baseline Interferometry Experiment (BVEX), a pathfinder for high-frequency stratospheric VLBI at 22 GHz. The backend uses one of the four 14-bit analog-to-digital converter inputs on an AMD-Xilinx RFSoC 4x2. Although the converters support sampling rates up to 5 GSPS, the flight configuration digitizes the 2-4 GHz intermediate frequency at 4.096 GSPS. CASPER firmware provides both a high-resolution spectrometer for pointing and receiver verification, and a VLBI acquisition chain with two-bit requantization that records at a rate of about 8.2 Gbps. The timestamped data packets are sent over 100 Gigabit Ethernet (GbE) to a 16 TB NVMe array in a storage computer that draws approximately 70-80 W. The timing chain uses a Rakon oven-controlled crystal oscillator as a timing reference while a time-interval counter measures its drift relative to a GPS reference with approximately 60 ps resolution. This is the first deployment of an RFSoC-based VLBI backend and precision-timing system on a stratospheric balloon. Ground tests validated the backend, spectrometer, and timing chain. The August 2025 CSA STRATOS flight ended before reaching the target float altitude because of a balloon failure, and as a result no science observations were obtained. For the planned 2027 reflight, we are developing a conduction-cooled data storage computer with 24 TB of NVMe capacity and a direct data path from the 100 GbE interface to the NVMe array.

astro-ph.IM