SearcharxivSearch

arXiv · 2309.16560

1-arcsecond imaging of ELAIS-N1 field at 144MHz using the LoTSS survey with international LOFAR telescope

Abstract

We present the first wide area (2.5 x 2.5 deg^2) LOFAR High Band Antenna image at a resolution of 1.2'' x 2'' with a median noise of approximately 80 microJy per beam. It was made from an 8-hour International LOFAR Telescope (ILT) observation of the ELAIS-N1 field at frequencies ranging from 120 to 168 MHz with the most up-to-date ILT imaging methods. This intermediate resolution falls between the highest possible resolution (0.3'') achievable by using all International LOFAR Telescope (ILT) baselines and the standard 6-arcsecond resolution in the LoTSS (LOFAR Two-meter Sky Survey) image products utilising the LOFAR Dutch baselines only. This is the first demonstration of the feasibility of imaging using the ILT at a resolution of around 1'', which provides unique information on source morphology at scales that fall below the surface brightness limits at higher resolutions. The total calibration and imaging computational time is approximately 52,000 core hours, nearly 5 times more than required to produce a 6'' resolution image. We also present a radio source catalogue containing 2263 sources detected over the 2.5 x 2.5 deg^2 image of the ELAIS-N1 field, with a peak intensity threshold of 5.5 sigma. The catalogue has been cross-matched with the LoTSS deep ELAIS-N1 field radio catalogue, and its flux density and positional accuracy have been investigated and corrected accordingly. We find that approximately 80% of sources which we expect to be detectable based on their peak brightness in the LoTSS 6'' resolution image are detected in this image, which is approximately a factor of two higher than for 0.3'' resolution imaging in the Lockman Hole, implying there is a wealth of information on these intermediate scales.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Haoyang Ye, Frits Sweijen, Reinout van Weeren, Wendy Williams, Jurjen de Jong, Leah K. Morabito, Huub Rottgering, T. W. Shimwell, P. N. Best, Marco Bondi, Marcus Brüggen, Francesco de Gasperin, C. Tasse. 2023-09-28. 1-arcsecond imaging of ELAIS-N1 field at 144MHz using the LoTSS survey with international LOFAR telescope. https://doi.org/10.1051/0004-6361%2F202348103

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The EDD Radio Astronomy Backend Framework

Modern digital radio astronomy receivers produce increasingly wide-bandwidth, high bit-rate data streams that necessitate the development of flexible, scalable, and maintainable backend processing and recording systems. Historically, such backend instrumentation has been tightly coupled to telescope observing modes, limiting reuse between observatories and science cases. We present the Effelsberg Direct Digitisation (EDD) backend framework, a software-defined architecture for constructing real-time radio astronomy backends on commodity off-the-shelf computing infrastructure. We describe its design, implementation, supported observing modes, and operational deployments. EDD separates a common core framework from plugin-provided observing capabilities. The core provides orchestration, telescope interfaces, pipeline lifecycle management, monitoring, and deployment tooling, while plugins implement processing pipelines for specific observing modes. The framework is designed to support both single-dish and interferometric instruments through site-specific configuration and plugin selection. EDD currently supports spectroscopy and spectropolarimetry, pulsar timing and searching, baseband recording, very long baseline interferometry, correlation, and beamforming. Operational deployments include the Effelsberg 100-m telescope, the SKA-MPI prototype dish, the Thai National Radio Telescope, and the ARGOS interferometric prototype array. By separating common services, observing-mode plugins, and site-specific configuration, it allows backend capabilities to be deployed across heterogeneous telescope environments and provides a community resource for broadband radio astronomy instrumentation.

astro-ph.IM

Bayesian Superiority in On/Off analysis

We present a detailed comparison of Bayesian criteria with three non-informative priors - flat, Jeffreys, and scale-invariant - for testing a signal against an unknown background and compare them with the classical frequentist Li-Ma approach in the On/Off problem. We perform Monte Carlo simulations for various background levels and evaluate the Li-Ma and Bayesian criteria by their Type I error rates. We then simulate a nonzero signal and compare the criteria in terms of Type II error rates. We find that the Bayesian criterion with the Jeffreys prior yields lower Type I and Type II error rates than the Li-Ma criterion. In addition, we show that the Bayesian criteria are more robust than the Li-Ma criterion when the background distribution is overdispersed relative to the Poisson distribution.

astro-ph.IM

An RFSoC-based Backend and Timing System for the Balloon-borne Very Long Baseline Interferometry Experiment

We present the design and performance characterization of the digital backend and precision-timing system for the Balloon-borne Very Long Baseline Interferometry Experiment (BVEX), a pathfinder for high-frequency stratospheric VLBI at 22 GHz. The backend uses one of the four 14-bit analog-to-digital converter inputs on an AMD-Xilinx RFSoC 4x2. Although the converters support sampling rates up to 5 GSPS, the flight configuration digitizes the 2-4 GHz intermediate frequency at 4.096 GSPS. CASPER firmware provides both a high-resolution spectrometer for pointing and receiver verification, and a VLBI acquisition chain with two-bit requantization that records at a rate of about 8.2 Gbps. The timestamped data packets are sent over 100 Gigabit Ethernet (GbE) to a 16 TB NVMe array in a storage computer that draws approximately 70-80 W. The timing chain uses a Rakon oven-controlled crystal oscillator as a timing reference while a time-interval counter measures its drift relative to a GPS reference with approximately 60 ps resolution. This is the first deployment of an RFSoC-based VLBI backend and precision-timing system on a stratospheric balloon. Ground tests validated the backend, spectrometer, and timing chain. The August 2025 CSA STRATOS flight ended before reaching the target float altitude because of a balloon failure, and as a result no science observations were obtained. For the planned 2027 reflight, we are developing a conduction-cooled data storage computer with 24 TB of NVMe capacity and a direct data path from the 100 GbE interface to the NVMe array.

astro-ph.IM