arXiv · 2405.04632
Synchronization and Phase Locking of Resonant Magnet Power Supplies For Mu2e Experiment at Fermilab
Abstract
The Muon-to-Electron Conversion (Mu2e) Experiment demands a highly precise magnet and collimator system to achieve a stringent extinction level of $1\times 10^{-10}$ for out-of-time beam particles. Extinction is ensured by an AC Dipole system consisting of two magnet components: a 295 kHz system to allow for the passage of a 590 kHz beam at the nodes, and a 4.42 MHz system to minimize in-time beam slewing. Both components must be accurately phase-locked to the Delivery Ring's bunch rate as well as be synchronized with beam transfers from the Recycler. In this paper, we present the design, implementation, and results of a control system for the Mu2e magnet system based on an Intel Arria 10 FPGA. This system handles the phase-locking of the magnets to the Delivery Ring, as well as the phase jumps required for synchronization with transfers from the Recycler.
Explore related subjects
Keep this discovery
Ryan Hensley, Eric Prebys, Sridhar Tripathy. 2024-05-07. Synchronization and Phase Locking of Resonant Magnet Power Supplies For Mu2e Experiment at Fermilab. https://doi.org/10.18429/jacow-ipac2023-thpa075
Cite the original work for its findings. Save a collection to share your selection of sources.