SearcharxivSearch

arXiv · 2505.05514

Uranus Flagship Science-Driven Tour Design: Community Input Poll

Abstract

The highest priority Planetary Flagship from the Planetary Science and Astrobiology Decadal Survey is the Uranus Orbiter and Probe. This mission enables broad, cross-disciplinary science of an ice giant system, including the planet, moons, rings, and magnetosphere. The ice giants represent a size class of planet that is largely unexplored but that is common among extrasolar planet systems. At the same time, Uranus is unique, possessing a regular satellite system, rings, and a complex magnetosphere surrounding a planet tilted over for extreme seasonal variation. Exploration of the Uranian system is guided by a broad suite of science Objectives and through remote sensing, in situ probe, and fields and particles experiments. Due to the rapid nature of the Decadal concept study, the orbital tour could not be perfectly optimized, but a best effort was made to include orbit insertion, probe release and relay, and multiple satellite flybys; some Objectives were necessarily better met than others by this tour. The mission's tour trajectory can be optimized to meet any of the Decadal Science Objectives, by focusing on a particular system target, for example magnetosphere, satellites, or planet interior, but the best tour will simultaneously meet the highest priority measurements for every Objective. The community-led (with no institutional or NASA sponsorship) poll described here was designed to collect broad science inputs on the tour parameters required for each Decadal Science Objective. Here we present results aggregated by Objective, as well as compared longitudinally, of the highest priority tour needs identified across all Objectives. Both the raw and aggregated data are made publicly available for future white papers, tour and trajectory work, as well as mission and instrument design teams, but the results are not binding nor decisional in any way.

Explore related subjects

Keep this discovery

BibTeXRIS

Amy Simon, Ian Cohen, Matthew Hedman, Mark Hofstadter, Kathleen Mandt, Francis Nimmo. 2025-05-07. Uranus Flagship Science-Driven Tour Design: Community Input Poll. https://arxiv.org/abs/2505.05514

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The EDD Radio Astronomy Backend Framework

Modern digital radio astronomy receivers produce increasingly wide-bandwidth, high bit-rate data streams that necessitate the development of flexible, scalable, and maintainable backend processing and recording systems. Historically, such backend instrumentation has been tightly coupled to telescope observing modes, limiting reuse between observatories and science cases. We present the Effelsberg Direct Digitisation (EDD) backend framework, a software-defined architecture for constructing real-time radio astronomy backends on commodity off-the-shelf computing infrastructure. We describe its design, implementation, supported observing modes, and operational deployments. EDD separates a common core framework from plugin-provided observing capabilities. The core provides orchestration, telescope interfaces, pipeline lifecycle management, monitoring, and deployment tooling, while plugins implement processing pipelines for specific observing modes. The framework is designed to support both single-dish and interferometric instruments through site-specific configuration and plugin selection. EDD currently supports spectroscopy and spectropolarimetry, pulsar timing and searching, baseband recording, very long baseline interferometry, correlation, and beamforming. Operational deployments include the Effelsberg 100-m telescope, the SKA-MPI prototype dish, the Thai National Radio Telescope, and the ARGOS interferometric prototype array. By separating common services, observing-mode plugins, and site-specific configuration, it allows backend capabilities to be deployed across heterogeneous telescope environments and provides a community resource for broadband radio astronomy instrumentation.

astro-ph.IM

Bayesian Superiority in On/Off analysis

We present a detailed comparison of Bayesian criteria with three non-informative priors - flat, Jeffreys, and scale-invariant - for testing a signal against an unknown background and compare them with the classical frequentist Li-Ma approach in the On/Off problem. We perform Monte Carlo simulations for various background levels and evaluate the Li-Ma and Bayesian criteria by their Type I error rates. We then simulate a nonzero signal and compare the criteria in terms of Type II error rates. We find that the Bayesian criterion with the Jeffreys prior yields lower Type I and Type II error rates than the Li-Ma criterion. In addition, we show that the Bayesian criteria are more robust than the Li-Ma criterion when the background distribution is overdispersed relative to the Poisson distribution.

astro-ph.IM

An RFSoC-based Backend and Timing System for the Balloon-borne Very Long Baseline Interferometry Experiment

We present the design and performance characterization of the digital backend and precision-timing system for the Balloon-borne Very Long Baseline Interferometry Experiment (BVEX), a pathfinder for high-frequency stratospheric VLBI at 22 GHz. The backend uses one of the four 14-bit analog-to-digital converter inputs on an AMD-Xilinx RFSoC 4x2. Although the converters support sampling rates up to 5 GSPS, the flight configuration digitizes the 2-4 GHz intermediate frequency at 4.096 GSPS. CASPER firmware provides both a high-resolution spectrometer for pointing and receiver verification, and a VLBI acquisition chain with two-bit requantization that records at a rate of about 8.2 Gbps. The timestamped data packets are sent over 100 Gigabit Ethernet (GbE) to a 16 TB NVMe array in a storage computer that draws approximately 70-80 W. The timing chain uses a Rakon oven-controlled crystal oscillator as a timing reference while a time-interval counter measures its drift relative to a GPS reference with approximately 60 ps resolution. This is the first deployment of an RFSoC-based VLBI backend and precision-timing system on a stratospheric balloon. Ground tests validated the backend, spectrometer, and timing chain. The August 2025 CSA STRATOS flight ended before reaching the target float altitude because of a balloon failure, and as a result no science observations were obtained. For the planned 2027 reflight, we are developing a conduction-cooled data storage computer with 24 TB of NVMe capacity and a direct data path from the 100 GbE interface to the NVMe array.

astro-ph.IM