arXiv · 2507.10123
Optimal Battery Placement in Power Grid
Abstract
We study the optimal placement of an unlimited-capacity battery in power grids under a centralized market model, where the independent system operator (ISO) aims to minimize total generation costs through load shifting. The optimal battery placement is not well understood by the existing literature, especially regarding the influence of network topology on minimizing generation costs. Our work starts with decomposing the Mixed-Integer Linear Programming (MILP) problem into a series of Linear Programming (LP) formulations. For power grids with sufficiently large generation capacity or tree topologies, we derive analytical cost expressions demonstrating that, under reasonable assumptions, the weighted degree is the only topological factor for optimal battery placement. We also discuss the minor impact of higher-order topological conditions on tree-topology networks. To find the localized nature of a single battery's impact, we establish that the relative cost-saving benefit of a single battery decreases as the network scales. Furthermore, we design a low-complexity algorithm for weakly-cyclic networks. Numerical experiments show that our algorithm is not only approximately 100 times faster than commercial solvers but also maintains high accuracy even when some theoretical assumptions are relaxed.
Explore related subjects
Keep this discovery
Ruotong Sun, Ermin Wei, Lihui Yi. 2025-07-14. Optimal Battery Placement in Power Grid. https://arxiv.org/abs/2507.10123
Cite the original work for its findings. Save a collection to share your selection of sources.