SearcharxivSearch

arXiv · 2602.19286

Safety Acquisitions: Redundancy for non-repeatable multi-orbit STIS visits

Abstract

For observations of supernovae, kilonovae, tidal disruption events, and other non-repeatable observations, it is important the science data is taken successfully within a specific time window. Part of obtaining that data is often centering objects in the aperture to a higher accuracy than is available from Hubble Space Telescope's (HST's) blind pointing. On HST STIS the sequence of exposures responsible for this centering is the target acquisition or STIS ACQ sequence, and it is most often placed only at the beginning of a visit. Unfortunately, STIS ACQ sequences will fail if the observatory experiences issues locating guide stars in time for the start of the required exposures. If the guide stars are located at a later point in the visit, the remaining science exposures can be taken but the pointing might not be as accurate as is required. This work discusses both the frequency of this issue and the feasibility of placing redundant or "safety" STIS ACQ sequences in a multi-orbit visit to regain the desired pointing accuracy in an affected visit. To do so we select a subset of all 113 STIS ACQ sequences from September 2018 to September 2023 which have experienced this issue. We find that this problem occurs in ~5% of the total STIS ACQ sequences taken during that time period, with a recent increase in the rate to ~9% from March to September 2023. Since the observatory goes through periods of better or worse pointing performance, this recent increased failure rate is not guaranteed to continue. For those failed visits which span multiple orbits, ~39% never obtain a lock on the guide stars and thus take no data. Of the multi-orbit visits that do recover the guide stars, the majority (~78%) do so before the beginning of science exposures in the second orbit. We also provide advice for users on how to make a risk assessment based on the analysis presented here.

Explore related subjects

Keep this discovery

BibTeXRIS

Matthew M. Dallas, Matthew R. Siebert. 2026-02-22. Safety Acquisitions: Redundancy for non-repeatable multi-orbit STIS visits. https://arxiv.org/abs/2602.19286

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The EDD Radio Astronomy Backend Framework

Modern digital radio astronomy receivers produce increasingly wide-bandwidth, high bit-rate data streams that necessitate the development of flexible, scalable, and maintainable backend processing and recording systems. Historically, such backend instrumentation has been tightly coupled to telescope observing modes, limiting reuse between observatories and science cases. We present the Effelsberg Direct Digitisation (EDD) backend framework, a software-defined architecture for constructing real-time radio astronomy backends on commodity off-the-shelf computing infrastructure. We describe its design, implementation, supported observing modes, and operational deployments. EDD separates a common core framework from plugin-provided observing capabilities. The core provides orchestration, telescope interfaces, pipeline lifecycle management, monitoring, and deployment tooling, while plugins implement processing pipelines for specific observing modes. The framework is designed to support both single-dish and interferometric instruments through site-specific configuration and plugin selection. EDD currently supports spectroscopy and spectropolarimetry, pulsar timing and searching, baseband recording, very long baseline interferometry, correlation, and beamforming. Operational deployments include the Effelsberg 100-m telescope, the SKA-MPI prototype dish, the Thai National Radio Telescope, and the ARGOS interferometric prototype array. By separating common services, observing-mode plugins, and site-specific configuration, it allows backend capabilities to be deployed across heterogeneous telescope environments and provides a community resource for broadband radio astronomy instrumentation.

astro-ph.IM

Bayesian Superiority in On/Off analysis

We present a detailed comparison of Bayesian criteria with three non-informative priors - flat, Jeffreys, and scale-invariant - for testing a signal against an unknown background and compare them with the classical frequentist Li-Ma approach in the On/Off problem. We perform Monte Carlo simulations for various background levels and evaluate the Li-Ma and Bayesian criteria by their Type I error rates. We then simulate a nonzero signal and compare the criteria in terms of Type II error rates. We find that the Bayesian criterion with the Jeffreys prior yields lower Type I and Type II error rates than the Li-Ma criterion. In addition, we show that the Bayesian criteria are more robust than the Li-Ma criterion when the background distribution is overdispersed relative to the Poisson distribution.

astro-ph.IM

An RFSoC-based Backend and Timing System for the Balloon-borne Very Long Baseline Interferometry Experiment

We present the design and performance characterization of the digital backend and precision-timing system for the Balloon-borne Very Long Baseline Interferometry Experiment (BVEX), a pathfinder for high-frequency stratospheric VLBI at 22 GHz. The backend uses one of the four 14-bit analog-to-digital converter inputs on an AMD-Xilinx RFSoC 4x2. Although the converters support sampling rates up to 5 GSPS, the flight configuration digitizes the 2-4 GHz intermediate frequency at 4.096 GSPS. CASPER firmware provides both a high-resolution spectrometer for pointing and receiver verification, and a VLBI acquisition chain with two-bit requantization that records at a rate of about 8.2 Gbps. The timestamped data packets are sent over 100 Gigabit Ethernet (GbE) to a 16 TB NVMe array in a storage computer that draws approximately 70-80 W. The timing chain uses a Rakon oven-controlled crystal oscillator as a timing reference while a time-interval counter measures its drift relative to a GPS reference with approximately 60 ps resolution. This is the first deployment of an RFSoC-based VLBI backend and precision-timing system on a stratospheric balloon. Ground tests validated the backend, spectrometer, and timing chain. The August 2025 CSA STRATOS flight ended before reaching the target float altitude because of a balloon failure, and as a result no science observations were obtained. For the planned 2027 reflight, we are developing a conduction-cooled data storage computer with 24 TB of NVMe capacity and a direct data path from the 100 GbE interface to the NVMe array.

astro-ph.IM