arXiv · physics/0111202
A Control System of the Joint-Project Accelerator Complex
Abstract
The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at Tokai. The first beam commissioning is scheduled in 2006. In parallel with it, a 60-MeV Linac is now being constructed at KEK site at Tsukuba for R&D purpose. Recently the Project has officially decided to use the Experimental Physics and Industrial Control System (EPICS). Under the EPICS environment, we are challenging to implement the Ethernet/IP network for all communication, even at the level of end-point controllers which are so far connected via a field bus. In order to realize such a system, three new controllers (PLCs, WE7000 stations and general-purpose Ethernet boards) are being developed. A prototype EPICS driver for the PLCs works fine and is used to control the ion-source at the KEK Linac.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
J. Chiba, H. Fujii, K. Furukawa, N. Kamikubota, H. Nakagawa, N. Yamamoto, H. Sakaki, H. Yoshikawa. 2001-11-28. A Control System of the Joint-Project Accelerator Complex. https://arxiv.org/abs/physics/0111202
Cite the original work for its findings. Save a collection to share your selection of sources.