SearcharxivSearch

arXiv subjects

B. Chase

Publications and source records attributed to B. Chase.

At least 19 recordsLinked to original sources

LLRF System for the Fermilab PIP-II Superconducting LINAC

PIP-II is an 800 MEV superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an ion source, RFQ and buncher cavities along with 25 superconducting cryo-modules comprised of five different acceleration \(\beta\). The LLRF system for the LINAC has to provide field and resonance control for a total of 125 RF cavities.The LLRF system design is in the final design review phase and will enter the production phase next year. The PIP-II project is an international collaboration with various partner labs contributing subsystems. The LLRF system design for the PIP-II Linac is presented and the specification requirements and system performance in various stages of testing are described in this paper.

physics.acc-ph

Closed Loop Testing of Microphonics Algorithms Using a Cavity Emulator

An analog crystal filter based cavity emulator is modified with reverse biased varactor diodes to provide a tuning range of around 160 Hz. The piezo drive voltage of the resonance controller is used to detune the cavity through the bias voltage. A signal conditioning and summing circuit allows the introduction of microphonics disturbance from a signal source or using real microphonics data from cavity testing. This setup is used in closed loop with a cavity controller and resonance controller to study the effectiveness of resonance control algorithms suitable for superconducting cavities.

physics.acc-ph

LCLS-II and HE Cryomodule Microphonics at CMTF in Fermilab*

Microphonics causes the cavity to detune. This study discusses the microphonics of sixteen 1.3 GHz cryomodules, 14 for LCLS-II and 2 for LCLS-II HE tested at CMTF. The peak detuning, as well as the RMS detuning for each cryomodule, will be discussed. For each cryomodule, the data was taken with enough soaking time to prevent any thermalization effects which can show up in the detuning. Each data capture taken was 30 minutes or longer and sampled at 1 kHz.

physics.acc-ph

LCLS-II-HE verification cryomodule high gradient performance and quench behavior

An 8-cavity, 1.3 GHz, LCLS-II-HE cryomodule was assembled and tested at Fermilab to verify performance before the start of production. Its cavities were processed with a novel nitrogen doping treatment to improve gradient performance. The cryomodule was tested with a modified protocol to process sporadic quenches, which were observed in LCLS-II production cryomodules and are attributed to multipacting. Dedicated vertical test experiments support the attribution to multipacting. The verification cryomodule achieved an acceleration voltage of 200 MV in continuous wave mode, corresponding to an average accelerating gradient of 24.1 MV/m, significantly exceeding the specification of 173 MV. The average Q0 (3.0x10^10) also exceeded its specification (2.7x10^10). After processing, no field emission was observed up to the maximum gradient of each cavity. This paper reviews the cryomodule performance and discusses operational issues and mitigations implemented during the several month program.

physics.acc-ph

PIP-II Injector Test Warm Front End: Commissioning Update

The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.

physics.acc-ph

Commissioning And First Results From The Fermilab Cryomodule Test Stand

A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.

physics.acc-ph

LLRF system for the Fermilab Muon g-2 and Mu2e projects

The Mu2e experiment measures the conversion rate of muons into electrons and the Muon g-2 experiment measures the muon magnetic moment. Both experiments require 53 MHz batches of 8 GeV protons to be re-bunched into 150 ns, 2.5 MHz pulses for extraction to the g-2 target for Muon g-2 and to a delivery ring with a single RF cavity running at 2.36 MHz for Mu2e. The LLRF system for both experiments is implemented in a SOC FPGA board integrated into the existing 53 MHz LLRF system in a VXI crate. The tight timing requirements, the large frequency difference and the non-harmonic relationship between the two RF systems provide unique challenges to the LLRF system design to achieve the required phase alignment specifications for beam formation, transfers and beam extinction between pulses. The new LLRF system design for both projects is described and the results of the initial beam commissioning tests for the Muon g-2 experiment are presented.

physics.acc-ph

Regime of a wideband phase-amplitude modulation in a CW magnetron transmitter with a phase control

A model of the CW high-power transmitter, utilizing frequency-locked magnetrons with a phase control studied initially as a prototype of controllable in phase and power an RF source for intensity-frontier superconducting linacs, was considered for telecommunication as a model of magnetron source, acceptable for a wideband phase-amplitude modulation at a precisely stable carrier frequency. The R&D conducted with CW, 2.45 GHz, 1 kW, microwave oven magnetrons demonstrated that the frequency locking of the magnetrons by the phase-modulated signal provides wideband phase and amplitude modulation at the modulating frequency at least up to 3 MHz and large magnitude, keeping the carrier frequency precisely stable, without broadening of the spectral line width. Performed experiments with power combining verified applicability of the transmitter based on the frequency-locked magnetrons for wideband phase and amplitude modulation, which may be used for telecommunication. Results of the experiments are described in the presented work.

physics.ins-det

Project X: Accelerator Reference Design

Part 1 of "Project X: Accelerator Reference Design, Physics Opportunities, Broader Impacts". Part 1 contains the volume Preface and a description of the conceptual design for a high-intensity proton accelerator facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Subjects covered include performance goals, the accelerator physics design, and the technological basis for such a facility. Part 2 is available as arXiv:1306.5009 [hep-ex] and Part 3 is available as arXiv:1306.5024 [physics.acc-ph].

physics.acc-ph

Test Results of Tesla-Style Cryomodules at Fermilab

Commissioning and operation of the first Tesla-style Cryomodule (CM-1) at Fermilab was concluded in recent months. A second Tesla Type III+ module, RFCA002, will be replacing it. CM-1 is the first 8-cavity ILC style cryomodule to be built at Fermilab and also the first accelerating cryomodule of the Advanced Superconducting Test Accelerator (ASTA). We report on the operating results of both of these cryomodules.

physics.acc-ph

Coalescing at 8 GeV in the Fermilab Main Injector

For Project X, it is planned to inject a beam of 3 10**11 particles per bunch into the Main Injector. To prepare for this by studying the effects of higher intensity bunches in the Main Injector it is necessary to perform coalescing at 8 GeV. The results of a series of experiments and simulations of 8 GeV coalescing are presented. To increase the coalescing efficiency adiabatic reduction of the 53 MHz RF is required, resulting in ~70% coalescing efficiency of 5 initial bunches. Data using wall current monitors has been taken to compare previous work and new simulations for 53 MHz RF reduction, bunch rotations and coalescing, good agreement between experiment and simulation was found. Possible schemes to increase the coalescing efficiency and generate even higher intensity bunches are discussed. These require improving the timing resolution of the low level RF and/or tuning the adiabatic voltage reduction of the 53 MHz.

physics.acc-ph

Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab

The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beamlines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750-MeV electron beam with ILC beam intensity. An expansion of this facility was recently completed that will provide the capability to upgrade the accelerator to a total beam energy of 1.5-GeV. Two new buildings were also constructed adjacent to the ASTA facility to house a new cryogenic plant and multiple superconducting RF (SRF) cryomodule test stands. In addition to testing accelerator components, this facility will be used to test RF power systems, instrumentation, and control systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

physics.acc-ph

The Six-Cavity Test - Demonstrated Acceleration of Beam with Multiple RF Cavities and a Single Klystron

The High Intensity Neutrino Source (HINS) Six-Cavity Test has demonstrated the use of high power RF vector modulators to control multiple RF cavities driven by a single high power klystron to accelerate a non-relativistic beam. Installation of 6 cavities in the existing HINS beamline has been completed and beam measurements have started. We present data showing the energy stability of the 7 mA proton beam accelerated through the six cavities from 2.5 MeV to 3.4 MeV.

physics.acc-ph

RF Test Results from Cryomodule 1 at the Fermilab SRF Beam Test Facility

Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the full cryomodule have been performed. We report on the results of these tests and lessons learned which will have an impact on future module testing at Fermilab.

physics.acc-ph

Status and plans for a SRF accelerator test faciliy at Fermilab

A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beam lines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. Expansion plans of the facility are underway that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. In addition to testing accelerator components, this facility will be used to test RF power equipment, instrumentation, LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

physics.acc-ph

A vector control and data acquisition system for the multicavity LLRF system for cryomodule1 at Fermilab

A LLRF control and data acquisition system for the 8-cavity cryomodule1 at the ILCTA has been implemented using three 33-channel ADC boards in a VXI mainframe. One card each is dedicated to the cavity probes for vector control, forward power and reverse power measurements. The system is scalable to 24 cavities or more with the commissioning of cryomodules 2 and 3 without additional hardware. The signal processing and vector control of the cavities is implemented in an FPGA and a high speed data acquisition system with up to 100 channels which stores data in external SDRAM memory. The system supports both pulsed and CW modes with a pulse rate of 5 Hz. Acquired data is transferred between pulses to auxiliary systems such as the piezo controller through the VXI slot0 controller. The performance of the vector control system is evaluated and the design of the system is described.

physics.acc-ph

First high power pulsed tests of a dressed 325 MHz superconducting single spoke resonator at Fermilab

In the recently commissioned superconducting RF cavity test facility at Fermilab (SCTF), a 325 MHz, β=0.22 superconducting single-spoke resonator (SSR1) has been tested for the first time with its input power coupler. Previously, this cavity had been tested CW with a low power, high Qext test coupler; first as a bare cavity in the Fermilab Vertical Test Stand and then fully dressed in the SCTF. For the tests described here, the design input coupler with Qext ~ 106 was used. Pulsed power was provided by a Toshiba E3740A 2.5 MW klystron.

physics.acc-ph