arXiv · 1806.05708
PIP-II Injector Test Warm Front End: Commissioning Update
Abstract
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.
Explore related subjects
Keep this discovery
L. Prost, R. Andrews, C. Baffes, J. -P. Carneiro, B. Chase, A. Chen, E. Cullerton, P. F. Derwent, J. P. Edelen, J. Einstein-Curtis, D. Frolov, B. Hanna, D. Peterson, G. Saewert, A. Saini, V. Scarpine, A. Shemyakin, J. Steimel, D. Sun, A. Warner, C. Richard, V. L. S. Sista. 2018-06-14. PIP-II Injector Test Warm Front End: Commissioning Update. https://arxiv.org/abs/1806.05708
Cite the original work for its findings. Save a collection to share your selection of sources.