Searcharxiv⌕ Search

arXiv subjects

Marek Chrobak

Publications and source records attributed to Marek Chrobak.

52 records · Page 3Linked to original sources

Better Approximation Bounds for the Joint Replenishment Problem

The Joint Replenishment Problem (JRP) deals with optimizing shipments of goods from a supplier to retailers through a shared warehouse. Each shipment involves transporting goods from the supplier to the warehouse, at a fixed cost C, followed by a redistribution of these goods from the warehouse to the retailers that ordered them, where transporting goods to a retailer $ρ$ has a fixed cost $c_ρ$. In addition, retailers incur waiting costs for each order. The objective is to minimize the overall cost of satisfying all orders, namely the sum of all shipping and waiting costs. JRP has been well studied in Operations Research and, more recently, in the area of approximation algorithms. For arbitrary waiting cost functions, the best known approximation ratio is 1.8. This ratio can be reduced to 1.574 for the JRP-D model, where there is no cost for waiting but orders have deadlines. As for hardness results, it is known that the problem is APX-hard and that the natural linear program for JRP has integrality gap at least 1.245. Both results hold even for JRP-D. In the online scenario, the best lower and upper bounds on the competitive ratio are 2.64 and 3, respectively. The lower bound of 2.64 applies even to the restricted version of JRP, denoted JRP-L, where the waiting cost function is linear. We provide several new approximation results for JRP. In the offline case, we give an algorithm with ratio 1.791, breaking the barrier of 1.8. In the online case, we show a lower bound of 2.754 on the competitive ratio for JRP-L (and thus JRP as well), improving the previous bound of 2.64. We also study the online version of JRP-D, for which we prove that the optimal competitive ratio is 2.

cs.DS↗

LP-rounding Algorithms for the Fault-Tolerant Facility Placement Problem

The Fault-Tolerant Facility Placement problem (FTFP) is a generalization of the classic Uncapacitated Facility Location Problem (UFL). In FTFP we are given a set of facility sites and a set of clients. Opening a facility at site $i$ costs $f_i$ and connecting client $j$ to a facility at site $i$ costs $d_{ij}$. We assume that the connection costs (distances) $d_{ij}$ satisfy the triangle inequality. Multiple facilities can be opened at any site. Each client $j$ has a demand $r_j$, which means that it needs to be connected to $r_j$ different facilities (some of which could be located on the same site). The goal is to minimize the sum of facility opening cost and connection cost. The main result of this paper is a 1.575-approximation algorithm for FTFP, based on LP-rounding. The algorithm first reduces the demands to values polynomial in the number of sites. Then it uses a technique that we call adaptive partitioning, which partitions the instance by splitting clients into unit demands and creating a number of (not yet opened) facilities at each site. It also partitions the optimal fractional solution to produce a fractional solution for this new instance. The partitioned instance satisfies a number of properties that allow us to exploit existing LP-rounding methods for UFL to round our partitioned solution to an integral solution, preserving the approximation ratio. In particular, our 1.575-approximation algorithm is based on the ideas from the 1.575-approximation algorithm for UFL by Byrka et al., with changes necessary to satisfy the fault-tolerance requirement.

cs.DS↗

New Results on the Fault-Tolerant Facility Placement Problem

We studied the Fault-Tolerant Facility Placement problem (FTFP) which generalizes the uncapacitated facility location problem (UFL). In FTFP, we are given a set F of sites at which facilities can be built, and a set C of clients with some demands that need to be satisfied by different facilities. A client $j$ has demand $r_j$. Building one facility at a site $i$ incurs a cost $f_i$, and connecting one unit of demand from client $j$ to a facility at site $i\in\fac$ costs $d_{ij}$. $d_{ij}$'s are assumed to form a metric. A feasible solution specifies the number of facilities to be built at each site and the way to connect demands from clients to facilities, with the restriction that demands from the same client must go to different facilities. Facilities at the same site are considered different. The goal is to find a solution with minimum total cost. We gave a 1.7245-approximation algorithm to the FTFP problem. Our technique is via a reduction to the Fault-Tolerant Facility Location problem, in which each client has demand $r_j$ but each site can have at most one facility built.

cs.DS↗

Better Bounds for Incremental Frequency Allocation in Bipartite Graphs

We study frequency allocation in wireless networks. A wireless network is modeled by an undirected graph, with vertices corresponding to cells. In each vertex we have a certain number of requests, and each of those requests must be assigned a different frequency. Edges represent conflicts between cells, meaning that frequencies in adjacent vertices must be different as well. The objective is to minimize the total number of used frequencies. The offline version of the problem is known to be NP-hard. In the incremental version, requests for frequencies arrive over time and the algorithm is required to assign a frequency to a request as soon as it arrives. Competitive incremental algorithms have been studied for several classes of graphs. For paths, the optimal (asymptotic) ratio is known to be 4/3, while for hexagonal-cell graphs it is between 1.5 and 1.9126. For k-colorable graphs, the ratio of (k+1)/2 can be achieved. In this paper, we prove nearly tight bounds on the asymptotic competitive ratio for bipartite graphs, showing that it is between 1.428 and 1.433. This improves the previous lower bound of 4/3 and upper bound of 1.5. Our proofs are based on reducing the incremental problem to a purely combinatorial (equivalent) problem of constructing set families with certain intersection properties.

cs.DS↗

Tile Packing Tomography is NP-hard

Discrete tomography deals with reconstructing finite spatial objects from lower dimensional projections and has applications for example in timetable design. In this paper we consider the problem of reconstructing a tile packing from its row and column projections. It consists of disjoint copies of a fixed tile, all contained in some rectangular grid. The projections tell how many cells are covered by a tile in each row and column. How difficult is it to construct a tile packing satisfying given projections? It was known to be solvable by a greedy algorithm for bars (tiles of width or height 1), and NP-hardness results were known for some specific tiles. This paper shows that the problem is NP-hard whenever the tile is not a bar.

cs.CC↗

Polynomial Time Algorithms for Minimum Energy Scheduling

The aim of power management policies is to reduce the amount of energy consumed by computer systems while maintaining satisfactory level of performance. One common method for saving energy is to simply suspend the system during the idle times. No energy is consumed in the suspend mode. However, the process of waking up the system itself requires a certain fixed amount of energy, and thus suspending the system is beneficial only if the idle time is long enough to compensate for this additional energy expenditure. In the specific problem studied in the paper, we have a set of jobs with release times and deadlines that need to be executed on a single processor. Preemptions are allowed. The processor requires energy L to be woken up and, when it is on, it uses one unit of energy per one unit of time. It has been an open problem whether a schedule minimizing the overall energy consumption can be computed in polynomial time. We solve this problem in positive, by providing an O(n^5)-time algorithm. In addition we provide an O(n^4)-time algorithm for computing the minimum energy schedule when all jobs have unit length.

cs.DS↗

Algorithms for Placing Monitors in a Flow Network

In the Flow Edge-Monitor Problem, we are given an undirected graph G=(V,E), an integer k > 0 and some unknown circulation ψon G. We want to find a set of k edges in G, so that if we place k monitors on those edges to measure the flow along them, the total number of edges for which the flow can be uniquely determined is maximized. In this paper, we first show that the Flow Edge-Monitor Problem is NP-hard, and then we give two approximation algorithms: a 3-approximation algorithm with running time O((m+n)^2) and a 2-approximation algorithm with running time O((m+n)^3), where n = |V| and m=|E|.

cs.DS↗

Generalized Whac-a-Mole

We consider online competitive algorithms for the problem of collecting weighted items from a dynamic set S, when items are added to or deleted from S over time. The objective is to maximize the total weight of collected items. We study the general version, as well as variants with various restrictions, including the following: the uniform case, when all items have the same weight, the decremental sets, when all items are present at the beginning and only deletion operations are allowed, and dynamic queues, where the dynamic set is ordered and only its prefixes can be deleted (with no restriction on insertions). The dynamic queue case is a generalization of bounded-delay packet scheduling (also referred to as buffer management). We present several upper and lower bounds on the competitive ratio for these variants.

cs.DS↗

Algorithms for Temperature-Aware Task Scheduling in Microprocessor Systems

We study scheduling problems motivated by recently developed techniques for microprocessor thermal management at the operating systems level. The general scenario can be described as follows. The microprocessor's temperature is controlled by the hardware thermal management system that continuously monitors the chip temperature and automatically reduces the processor's speed as soon as the thermal threshold is exceeded. Some tasks are more CPU-intensive than other and thus generate more heat during execution. The cooling system operates non-stop, reducing (at an exponential rate) the deviation of the processor's temperature from the ambient temperature. As a result, the processor's temperature, and thus the performance as well, depends on the order of the task execution. Given a variety of possible underlying architectures, models for cooling and for hardware thermal management, as well as types of tasks, this scenario gives rise to a plethora of interesting and never studied scheduling problems. We focus on scheduling real-time jobs in a simplified model for cooling and thermal management. A collection of unit-length jobs is given, each job specified by its release time, deadline and heat contribution. If, at some time step, the temperature of the system is t and the processor executes a job with heat contribution h, then the temperature at the next step is (t+h)/2. The temperature cannot exceed the given thermal threshold T. The objective is to maximize the throughput, that is, the number of tasks that meet their deadlines. We prove that, in the offline case, computing the optimum schedule is NP-hard, even if all jobs are released at the same time. In the online case, we show a 2-competitive deterministic algorithm and a matching lower bound.

cs.DS↗

The Complexity of Mean Flow Time Scheduling Problems with Release Times

We study the problem of preemptive scheduling n jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. We show that when all jobs have equal processing times then the problem can be solved in polynomial time using linear programming. Our algorithm can also be applied to the open-shop problem with release times and unit processing times. For the general case (when processing times are arbitrary), we show that the problem is unary NP-hard.

cs.DS↗

The reverse greedy algorithm for the metric k-median problem

The Reverse Greedy algorithm (RGreedy) for the k-median problem works as follows. It starts by placing facilities on all nodes. At each step, it removes a facility to minimize the resulting total distance from the customers to the remaining facilities. It stops when k facilities remain. We prove that, if the distance function is metric, then the approximation ratio of RGreedy is between ?(log n/ log log n) and O(log n).

cs.DS↗

Preemptive Multi-Machine Scheduling of Equal-Length Jobs to Minimize the Average Flow Time

We study the problem of preemptive scheduling of n equal-length jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. Recently, Brucker and Kravchenko proved that the optimal schedule can be computed in polynomial time by solving a linear program with O(n^3) variables and constraints, followed by some substantial post-processing (where n is the number of jobs.) In this note we describe a simple linear program with only O(mn) variables and constraints. Our linear program produces directly the optimal schedule and does not require any post-processing.

cs.DS↗

Preemptive Scheduling of Equal-Length Jobs to Maximize Weighted Throughput

We study the problem of computing a preemptive schedule of equal-length jobs with given release times, deadlines and weights. Our goal is to maximize the weighted throughput, which is the total weight of completed jobs. In Graham's notation this problem is described as (1 | r_j;p_j=p;pmtn | sum w_j U_j). We provide an O(n^4)-time algorithm for this problem, improving the previous bound of O(n^{10}) by Baptiste.

cs.DS↗

A Note on Tiling under Tomographic Constraints

Given a tiling of a 2D grid with several types of tiles, we can count for every row and column how many tiles of each type it intersects. These numbers are called the_projections_. We are interested in the problem of reconstructing a tiling which has given projections. Some simple variants of this problem, involving tiles that are 1x1 or 1x2 rectangles, have been studied in the past, and were proved to be either solvable in polynomial time or NP-complete. In this note we make progress toward a comprehensive classification of various tiling reconstruction problems, by proving NP-completeness results for several sets of tiles.

cs.CC↗

Reconstructing hv-Convex Polyominoes from Orthogonal Projections

Tomography is the area of reconstructing objects from projections. Here we wish to reconstruct a set of cells in a two dimensional grid, given the number of cells in every row and column. The set is required to be an hv-convex polyomino, that is all its cells must be connected and the cells in every row and column must be consecutive. A simple, polynomial algorithm for reconstructing hv-convex polyominoes is provided, which is several orders of magnitudes faster than the best previously known algorithm from Barcucci et al. In addition, the problem of reconstructing a special class of centered hv-convex polyominoes is addressed. (An object is centered if it contains a row whose length equals the total width of the object). It is shown that in this case the reconstruction problem can be solved in linear time.

cs.DS↗

Reconstructing Polyatomic Structures from Discrete X-Rays: NP-Completeness Proof for Three Atoms

We address a discrete tomography problem that arises in the study of the atomic structure of crystal lattices. A polyatomic structure T can be defined as an integer lattice in dimension D>=2, whose points may be occupied by $c$ distinct types of atoms. To ``analyze'' T, we conduct ell measurements that we call_discrete X-rays_. A discrete X-ray in direction xi determines the number of atoms of each type on each line parallel to xi. Given ell such non-parallel X-rays, we wish to reconstruct T. The complexity of the problem for c=1 (one atom type) has been completely determined by Gardner, Gritzmann and Prangenberg, who proved that the problem is NP-complete for any dimension D>=2 and ell>=3 non-parallel X-rays, and that it can be solved in polynomial time otherwise. The NP-completeness result above clearly extends to any c>=2, and therefore when studying the polyatomic case we can assume that ell=2. As shown in another article by the same authors, this problem is also NP-complete for c>=6 atoms, even for dimension D=2 and axis-parallel X-rays. They conjecture that the problem remains NP-complete for c=3,4,5, although, as they point out, the proof idea does not seem to extend to c<=5. We resolve the conjecture by proving that the problem is indeed NP-complete for c>=3 in 2D, even for axis-parallel X-rays. Our construction relies heavily on some structure results for the realizations of 0-1 matrices with given row and column sums.

cs.DS↗