Software stage-effort estimation based on association rule mining and fuzzy set theory

Relaying on early effort estimation to predict the required number of resources is not often sufficient, and could lead to under or over estimation. It is widely acknowledge that that software development process should be refined regularly and that software prediction made at early stage of software development is yet kind of guesses. Even good predictions are not sufficient with inherent uncertainty and risks. The stage-effort estimation allows project manager to re-allocate correct number of resources, re-schedule project and control project progress to finish on time and within budget. In this paper we propose an approach to utilize prior effort records to predict stage effort. The proposed model combines concepts of Fuzzy set theory and association rule mining. The results were good in terms of prediction accuracy and have potential to deliver good stage-effort estimation.

cs.SE↗

Software effort estimation based on optimized model tree

Background: It is widely recognized that software effort estimation is a regression problem. Model Tree (MT) is one of the Machine Learning based regression techniques that is useful for software effort estimation, but as other machine learning algorithms, the MT has a large space of configuration and requires to carefully setting its parameters. The choice of such parameters is a dataset dependent so no general guideline can govern this process which forms the motivation of this work. Aims: This study investigates the effect of using the most recent optimization algorithm called Bees algorithm to specify the optimal choice of MT parameters that fit a dataset and therefore improve prediction accuracy. Method: We used MT with optimal parameters identified by the Bees algorithm to construct software effort estimation model. The model has been validated over eight datasets come from two main sources: PROMISE and ISBSG. Also we used 3-Fold cross validation to empirically assess the prediction accuracies of different estimation models. As benchmark, results are also compared to those obtained with Stepwise Regression Case-Based Reasoning and Multi-Layer Perceptron. Results: The results obtained from combination of MT and Bees algorithm are encouraging and outperforms other well-known estimation methods applied on employed datasets. They are also interesting enough to suggest the effectiveness of MT among the techniques that are suitable for effort estimation. Conclusions: The use of the Bees algorithm enabled us to automatically find optimal MT parameters required to construct effort estimation models that fit each individual dataset. Also it provided a significant improvement on prediction accuracy.

cs.SE↗

An Optimized Analogy-Based Project Effort Estimation

Despite the predictive performance of Analogy-Based Estimation (ABE) in generating better effort estimates, there is no consensus on how to predict the best number of analogies, and which adjustment technique produces better estimates. This paper proposes a new adjusted ABE model based on optimizing and approximating complex relationships between features and reflects that approximation on the final estimate. The results show that the predictive performance of ABE has noticeably been improved, and the number of analogies was remarkably variable for each test project.

cs.SE↗

Analogy-based effort estimation: a new method to discover set of analogies from dataset characteristics

Analogy-based effort estimation (ABE) is one of the efficient methods for software effort estimation because of its outstanding performance and capability of handling noisy datasets. Conventional ABE models usually use the same number of analogies for all projects in the datasets in order to make good estimates. The authors' claim is that using same number of analogies may produce overall best performance for the whole dataset but not necessarily best performance for each individual project. Therefore there is a need to better understand the dataset characteristics in order to discover the optimum set of analogies for each project rather than using a static k nearest projects. Method: We propose a new technique based on Bisecting k-medoids clustering algorithm to come up with the best set of analogies for each individual project before making the prediction. Results & Conclusions: With Bisecting k-medoids it is possible to better understand the dataset characteristic, and automatically find best set of analogies for each test project. Performance figures of the proposed estimation method are promising and better than those of other regular ABE models

cs.SE↗

Fuzzy Model Tree For Early Effort Estimation

Use Case Points (UCP) is a well-known method to estimate the project size, based on Use Case diagram, at early phases of software development. Although the Use Case diagram is widely accepted as a de-facto model for analyzing object oriented software requirements over the world, UCP method did not take sufficient amount of attention because, as yet, there is no consensus on how to produce software effort from UCP. This paper aims to study the potential of using Fuzzy Model Tree to derive effort estimates based on UCP size measure using a dataset collected for that purpose. The proposed approach has been validated against Treeboost model, Multiple Linear Regression and classical effort estimation based on the UCP model. The obtained results are promising and show better performance than those obtained by classical UCP, Multiple Linear Regression and slightly better than those obtained by Tree boost model.

cs.SE↗

Model tree based adaption strategy for software effort estimation by analogy

Background: Adaptation technique is a crucial task for analogy based estimation. Current adaptation techniques often use linear size or linear similarity adjustment mechanisms which are often not suitable for datasets that have complex structure with many categorical attributes. Furthermore, the use of nonlinear adaptation technique such as neural network and genetic algorithms needs many user interactions and parameters optimization for configuring them (such as network model, number of neurons, activation functions, training functions, mutation, selection, crossover, ... etc.). Aims: In response to the abovementioned challenges, the present paper proposes a new adaptation strategy using Model Tree based attribute distance to adjust estimation by analogy and derive new estimates. Using Model Tree has an advantage to deal with categorical attributes, minimize user interaction and improve efficiency of model learning through classification. Method: Seven well known datasets have been used with 3-Fold cross validation to empirically validate the proposed approach. The proposed method has been investigated using various K analogies from 1 to 3. Results: Experimental results showed that the proposed approach produced better results when compared with those obtained by using estimation by analogy based linear size adaptation, linear similarity adaptation, 'regression towards the mean' and null adaptation. Conclusions: Model Tree could form a useful extension for estimation by analogy especially for complex data sets with large number of categorical attributes.

cs.SE↗

Learning best K analogies from data distribution for case-based software effort estimation

Case-Based Reasoning (CBR) has been widely used to generate good software effort estimates. The predictive performance of CBR is a dataset dependent and subject to extremely large space of configuration possibilities. Regardless of the type of adaptation technique, deciding on the optimal number of similar cases to be used before applying CBR is a key challenge. In this paper we propose a new technique based on Bisecting k-medoids clustering algorithm to better understanding the structure of a dataset and discovering the the optimal cases for each individual project by excluding irrelevant cases. Results obtained showed that understanding of the data characteristic prior prediction stage can help in automatically finding the best number of cases for each test project. Performance figures of the proposed estimation method are better than those of other regular K-based CBR methods.

cs.SE↗

Dataset Quality Assessment: An extension for analogy based effort estimation

Estimation by Analogy (EBA) is an increasingly active research method in the area of software engineering. The fundamental assumption of this method is that the similar projects in terms of attribute values will also be similar in terms of effort values. It is well recognized that the quality of software datasets has a considerable impact on the reliability and accuracy of such method. Therefore, if the software dataset does not satisfy the aforementioned assumption then it is not rather useful for EBA method. This paper presents a new method based on Kendall's row-wise rank correlation that enables data quality evaluation and providing a data preprocessing stage for EBA. The proposed method provides sound statistical basis and justification for the process of data quality evaluation. Unlike Analogy-X, our method has the ability to deal with categorical attributes individually without the need for partitioning the dataset. Experimental results showed that the proposed method could form a useful extension for EBA as it enables: dataset quality evaluation, attribute selection and identifying abnormal observations.

cs.SE↗

An empirical evaluation of ensemble adjustment methods for analogy-based effort estimation

Objective: This paper investigates the potential of ensemble learning for variants of adjustment methods used in analogy-based effort estimation. The number k of analogies to be used is also investigated. Method We perform a large scale comparison study where many ensembles constructed from n out of 40 possible valid variants of adjustment methods are applied to eight datasets. The performance of each method was evaluated based on standardized accuracy and effect size. Results: The results have been subjected to statistical significance testing, and show reasonable significant improvements on the predictive performance where ensemble methods are applied. Conclusion: Our conclusions suggest that ensembles of adjustment methods can work well and achieve good performance, even though they are not always superior to single methods. We also recommend constructing ensembles from only linear adjustment methods, as they have shown better performance and were frequently ranked higher.

cs.SE↗

Pareto Efficient Multi Objective Optimization for Local Tuning of Analogy Based Estimation

Analogy Based Effort Estimation (ABE) is one of the prominent methods for software effort estimation. The fundamental concept of ABE is closer to the mentality of expert estimation but with an automated procedure in which the final estimate is generated by reusing similar historical projects. The main key issue when using ABE is how to adapt the effort of the retrieved nearest neighbors. The adaptation process is an essential part of ABE to generate more successful accurate estimation based on tuning the selected raw solutions, using some adaptation strategy. In this study we show that there are three interrelated decision variables that have great impact on the success of adaptation method: (1) number of nearest analogies (k), (2) optimum feature set needed for adaptation, and (3) adaptation weights. To find the right decision regarding these variables, one need to study all possible combinations and evaluate them individually to select the one that can improve all prediction evaluation measures. The existing evaluation measures usually behave differently, presenting sometimes opposite trends in evaluating prediction methods. This means that changing one decision variable could improve one evaluation measure while it is decreasing the others. Therefore, the main theme of this research is how to come up with best decision variables that improve adaptation strategy and thus, the overall evaluation measures without degrading the others. The impact of these decisions together has not been investigated before, therefore we propose to view the building of adaptation procedure as a multi-objective optimization problem. The Particle Swarm Optimization Algorithm (PSO) is utilized to find the optimum solutions for such decision variables based on optimizing multiple evaluation measures

cs.SE↗

A Hybrid Model for Estimating Software Project Effort from Use Case Points

Early software effort estimation is a hallmark of successful software project management. Building a reliable effort estimation model usually requires historical data. Unfortunately, since the information available at early stages of software development is scarce, it is recommended to use software size metrics as key cost factor of effort estimation. Use Case Points (UCP) is a prominent size measure designed mainly for object-oriented projects. Nevertheless, there are no established models that can translate UCP into its corresponding effort, therefore, most models use productivity as a second cost driver. The productivity in those models is usually guessed by experts and does not depend on historical data, which makes it subject to uncertainty. Thus, these models were not well examined using a large number of historical data. In this paper, we designed a hybrid model that consists of classification and prediction stages using a support vector machine and radial basis neural networks. The proposed model was constructed over a large number of observations collected from industrial and student projects. The proposed model was compared against previous UCP prediction models. The validation and empirical results demonstrated that the proposed model significantly surpasses these models on all datasets. The main conclusion is that the environmental factors of UCP can be used to classify and estimate productivity.

cs.SE↗

A Comparison Between Decision Trees and Decision Tree Forest Models for Software Development Effort Estimation

Accurate software effort estimation has been a challenge for many software practitioners and project managers. Underestimation leads to disruption in the projects estimated cost and delivery. On the other hand, overestimation causes outbidding and financial losses in business. Many software estimation models exist; however, none have been proven to be the best in all situations. In this paper, a decision tree forest (DTF) model is compared to a traditional decision tree (DT) model, as well as a multiple linear regression model (MLR). The evaluation was conducted using ISBSG and Desharnais industrial datasets. Results show that the DTF model is competitive and can be used as an alternative in software effort prediction.