Exploring the Optimal Size of Grid-forming Energy Storage in an Off-grid Renewable P2H System under Multi-timescale Energy Management

Utility-scale off-grid renewable power-to-hydrogen systems (OReP2HS), typically comprising photovoltaic plants, wind turbines, electrolyzers (ELs), and battery energy storage system (BESS), requires at least one component, generally the BESS, working with grid-forming ability to provide frequency and voltage references and regulate them through transient power support. However, existing designs of OReP2HS based on the energy management strategies (EMSs) with 5-min or hourly resolution fail to capture fast transients and may underestimate the BESS size required to ensure adequate grid-forming ability. This paper first proposes a framework of multi-timescale EMS covers from those for power system transient behaviors to second-level EL load adjustments and minute-level intra-day scheduling to coordinate renewable power, BESS, and ELs. Then, an iterative search procedure based on high-fidelity simulation is employed to determine the cost-effective BESS size that satisfies grid-forming, long-term energy balancing over 8760 hours, and emergency support requirements. Case studies based on a planned OReP2HS project in Inner Mongolia, China, show that the proposed EMS yields a base-case LCOH of 33.212 CNY/kg, with CAPEX of BESS accounting for 17.83% of total investment. The optimal BESS capacity represents 13.6% of the rated hourly renewable output and shows a yearly degradation of 4.87%. Sensitivity analysis reveals that reducing the electrolytic load adjustment time step from 90 to 5 seconds and increasing its ramping limit from 1% to 10% rated power per second, the BESS size decreases by 53.57%, and the LCOH decreases to 25.458 CNY/kg. Considering the cost of designing and manufacturing utility-scale ELs with fast load regulation capability, a load adjustment time step of 5 to 10 seconds and a ramping limit of 4-6% rated power per second are recommended.

math.OC

Planning of Off-Grid Renewable Power to Ammonia Systems with Heterogeneous Flexibility: A Multistakeholder Equilibrium Perspective

Off-grid renewable power to ammonia (ReP2A) systems present a promising pathway toward carbon neutrality in both the energy and chemical industries. However, due to chemical safety requirements, the limited flexibility of ammonia synthesis poses a challenge when attempting to align with the variable hydrogen flow produced from renewable power. This necessitates the optimal sizing of equipment capacity for effective and coordinated production across the system. Additionally, an ReP2A system may involve multiple stakeholders with varying degrees of operational flexibility, complicating the planning problem. This paper first examines the multistakeholder sizing equilibrium (MSSE) of the ReP2A system. First, we propose an MSSE model that accounts for individual planning decisions and the competing economic interests of the stakeholders of power generation, hydrogen production, and ammonia synthesis. We then construct an equivalent optimization problem based on Karush-Kuhn-Tucker (KKT) conditions to determine the equilibrium. Following this, we decompose the problem in the temporal dimension and solve it via multicut generalized Benders decomposition (GBD) to address long-term balancing issues. Case studies based on a realistic project reveal that the equilibrium does not naturally balance the interests of all stakeholders due to their heterogeneous characteristics. Our findings suggest that benefit transfer or re-arrangement ensure mutual benefits and the successful implementation of ReP2A projects.

math.OC

A Pure Integral-Type PLL with a Damping Branch to Enhance the Stability of Grid-Tied Inverter under Weak Grids

In a phase-locked loop (PLL) synchronized inverter, due to the strong nonlinear coupling between the PLL's parame-ters and the operation power angle, the equivalent damping coefficient will quickly deteriorate while the power angle is close to 90{\deg} under an ultra-weak grid, which causes the synchronous instability. To address this issue, in this letter, a pure integral-type phase-locked loop (IPLL) with a damping branch is proposed to replace the traditional PI-type PLL. The equivalent damping coefficient of an IPLL-synchronized inverter is decoupled with the steady-state power angle. As a result, the IPLL-synchronized inverter can stably operate under an ultra-weak grid when the equilibrium point exists. Finally, time-domain simulation results verify the effectiveness and correctness of the proposed IPLL.

eess.SY

Extended Load Flexibility of Utility-Scale P2H Plants: Optimal Production Scheduling Considering Dynamic Thermal and HTO Impurity Effects

In the conversion toward a clear and sustainable energy system, the flexibility of power-to-hydrogen (P2H) production enables the admittance of volatile renewable energies on a utility scale and provides the connected electrical power system with ancillary services. To extend the load flexibility and thus improve the profitability of green hydrogen production, this paper presents an optimal production scheduling approach for utility-scale P2H plants composed of multiple alkaline electrolyzers. Unlike existing works, this work discards the conservative constant steady-state constraints and first leverages the dynamic thermal and hydrogen-to-oxygen (HTO) impurity crossover processes of electrolyzers. Doing this optimizes their effects on the loading range and energy conversion efficiency, therefore improving the load flexibility of P2H production. The proposed multiphysics-aware scheduling model is formulated as mixed-integer linear programming (MILP). It coordinates the electrolyzers' operation state transitions and load allocation subject to comprehensive thermodynamic and mass transfer constraints. A decomposition-based solution method, SDM-GS-ALM, is followingly adopted to address the scalability issue for scheduling large-scale P2H plants composed of tens of electrolyzers. With an experiment-verified dynamic electrolyzer model, case studies up to 22 electrolyzers show that the proposed method remarkably improves the hydrogen output and profit of P2H production powered by either solar or wind energy compared to the existing scheduling approach.

math.OC

Online Dynamic Parameter Estimation of an Alkaline Electrolysis System Based on Bayesian Inference

When directly coupled with fluctuating energy sources such as wind and photovoltage power, the alkaline electrolysis (AEL) in a power-to-hydrogen (P2H) system is required to operate flexibly by dynamically adjusting its hydrogen production rate. The flex-ibility characteristics, e.g., loading range and ramping rate, of an AEL system are significantly influenced by some parameters re-lated to the dynamic processes of the AEL system. These parame-ters are usually difficult to measure directly and may even change with time. To accurately evaluate the flexibility of an AEL system in online operation, this paper presents a Bayesian Inference-based Markov Chain Monte Carlo (MCMC) method to estimate these parameters. Meanwhile, posterior joint probability distribu-tions of the estimated parameters are obtained as a byproduct, which provides valuable physical insight into the AEL systems. Experiments on a 25 kW electrolyzer validate the proposed pa-rameter estimation method.

eess.SY

Extended Load Flexibility of Industrial P2H Plants: A Process Constraint-Aware Scheduling Approach

The operational flexibility of industrial power-to-hydrogen (P2H) plants enables admittance of volatile renewable power and provides auxiliary regulatory services for the power grid. Aiming to extend the flexibility of the P2H plant further, this work presents a scheduling method by considering detailed process constraints of the alkaline electrolyzers. Unlike existing works that assume constant load range, the presented scheduling framework fully exploits the dynamic processes of the electrolyzer, including temperature and hydrogen-to-oxygen (HTO) crossover, to improve operational flexibility. Varying energy conversion efficiency under different load levels and temperature is also considered. The scheduling model is solved by proper mathematical transformation as a mixed-integer linear programming (MILP), which determines the on-off-standby states and power levels of different electrolyzers in the P2H plant for daily operation. With experiment-verified constraints, a case study show that compared to the existing scheduling approach, the improved flexibility leads to a 1.627% profit increase when the P2H plant is directly coupled to the photovoltaic power.

eess.SY