SearcharxivSearch

arXiv subjects

Tivadar Kiss

Publications and source records attributed to Tivadar Kiss.

2 recordsLinked to original sources

Trigger and Timing Distributions using the TTC-PON and GBT Bridge Connection in ALICE for the LHC Run 3 Upgrade

The ALICE experiment at CERN is preparing for a major upgrade for the third phase of data taking run (Run 3), when the high luminosity phase of the Large Hadron Collider (LHC) starts. The increase in the beam luminosity will result in high interaction rate causing the data acquisition rate to exceed 3 TB/sec. In order to acquire data for all the events and to handle the increased data rate, a transition in the readout electronics architecture from the triggered to the trigger-less acquisition mode is required. In this new architecture, a dedicated electronics block called the Common Readout Unit (CRU) is defined to act as a nodal communication point for detector data aggregation and as a distribution point for timing, trigger and control (TTC) information. TTC information in the upgraded triggerless readout architecture uses two asynchronous high-speed serial links connections: the TTC-PON and the GBT. We have carried out a study to evaluate the quality of the embedded timing signals forwarded by the CRU to the connected electronics using the TTC-PON and GBT bridge connection. We have used four performance metrics to characterize the communication bridge: (a)the latency added by the firmware logic, (b)the jitter cleaning effect of the PLL on the timing signal, (c)BER analysis for quantitative measurement of signal quality, and (d)the effect of optical transceivers parameter settings on the signal strength. Reliability study of the bridge connection in maintaining the phase consistency of timing signals is conducted by performing multiple iterations of power on/off cycle, firmware upgrade and reset assertion/de-assertion cycle (PFR cycle). The test results are presented and discussed concerning the performance of the TTC-PON and GBT bridge communication chain using the CRU prototype and its compliance with the ALICE timing requirements.

physics.ins-det

Design and Performance of the Data Acquisition System for the NA61/SHINE Experiment at CERN

This paper describes the hardware, firmware and software systems used in data acquisition for the NA61/SHINE experiment at the CERN SPS accelerator. Special emphasis is given to the design parameters of the readout electronics for the 40m^3 volume Time Projection Chamber detectors, as these give the largest contribution to event data among all the subdetectors: events consisting of 8bit ADC values from 256 timeslices of 200k electronic channels are to be read out with ~100Hz rate. The data acquisition system is organized in "push-data mode", i.e. local systems transmit data asynchronously. Techniques of solving subevent synchronization are also discussed.

physics.ins-det