SearcharxivSearch

arXiv · 1806.01350

Trigger and Timing Distributions using the TTC-PON and GBT Bridge Connection in ALICE for the LHC Run 3 Upgrade

Abstract

The ALICE experiment at CERN is preparing for a major upgrade for the third phase of data taking run (Run 3), when the high luminosity phase of the Large Hadron Collider (LHC) starts. The increase in the beam luminosity will result in high interaction rate causing the data acquisition rate to exceed 3 TB/sec. In order to acquire data for all the events and to handle the increased data rate, a transition in the readout electronics architecture from the triggered to the trigger-less acquisition mode is required. In this new architecture, a dedicated electronics block called the Common Readout Unit (CRU) is defined to act as a nodal communication point for detector data aggregation and as a distribution point for timing, trigger and control (TTC) information. TTC information in the upgraded triggerless readout architecture uses two asynchronous high-speed serial links connections: the TTC-PON and the GBT. We have carried out a study to evaluate the quality of the embedded timing signals forwarded by the CRU to the connected electronics using the TTC-PON and GBT bridge connection. We have used four performance metrics to characterize the communication bridge: (a)the latency added by the firmware logic, (b)the jitter cleaning effect of the PLL on the timing signal, (c)BER analysis for quantitative measurement of signal quality, and (d)the effect of optical transceivers parameter settings on the signal strength. Reliability study of the bridge connection in maintaining the phase consistency of timing signals is conducted by performing multiple iterations of power on/off cycle, firmware upgrade and reset assertion/de-assertion cycle (PFR cycle). The test results are presented and discussed concerning the performance of the TTC-PON and GBT bridge communication chain using the CRU prototype and its compliance with the ALICE timing requirements.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Jubin Mitra, Erno David, Eduardo Mendez, Shuaib Ahmad Khan, Tivadar Kiss, Sophie Baron, Alex Kluge, Tapan Nayak. 2018-06-04. Trigger and Timing Distributions using the TTC-PON and GBT Bridge Connection in ALICE for the LHC Run 3 Upgrade. https://doi.org/10.1016/j.nima.2018.12.076

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

High-Speed Semi-FE Readout Module for ATLAS MDT at HL-LHC: Design and Production-Level Characterization

The High-Luminosity upgrade of the Large Hadron Collider (HL-LHC) introduces increased demands on the ATLAS Muon Spectrometer, particularly in terms of data throughput, timing distribution and system reliability. The Phase-II Chamber Service Module (CSM) is a key component of the upgraded Monitored Drift Tube (MDT) trigger and readout system, providing a high-speed interface between the front-end electronics and the backend systems. This paper describes the design and implementation of the Phase-II CSM, together with its validation. The results show that the CSM supports two independent optical uplinks, each operating at a line rate of 10.24 Gbps, together with clock distribution and slow control in the expected operating environment. Integration with small-diameter MDT (sMDT) chambers and tests with the prototype L0MDT trigger system are also presented. The CSM boards are now in production and will be used for installation and integration during the upcoming LHC Long Shutdown.

physics.ins-det

Spectral Discrimination of Deposited Gamma-Ray Energies in a Simulated CeBr$_3$ Scintillator

We show that wavelength measurements of individual detected optical photons may provide additional information about gamma-ray energy deposited in a CeBr$_3$ crystal when the detected-photon-count distributions overlap for nearby gamma-ray energies. Monoenergetic 662 and 629 keV gammas are used in a Geant4 simulation of a $25\times25\times20~\mathrm{mm^3}$ CeBr$_3$ crystal. Assuming a light yield of $6.0\times10^4$ photons/MeV, a wavelength-independent photon-detection efficiency of 30%, and a wavelength resolution of $\sigma_{\lambda}=40$ nm, we find that the fraction of photons reconstructed above 385 nm gives an event-level separation of $\sim$ 2 standard deviations between the 662 and 629 keV event populations selected within the same $\sim$ 1%-wide detected-photon-count interval. No timing or reconstructed interaction-position information is used. The result demonstrates, within the present simulation model, that event-dependent optical spectra can retain energy information beyond an undifferentiated photon count.

physics.ins-det

Operation of a negative ion gas time projection chamber without electronegative fill gases

The high fidelity reconstruction of particle tracks in micropatterned gaseous time projection chambers renders this technology ideal for future rare-event searches, including direction-sensitive dark matter experiments. Large drift distances are typically required for such experiments, so that the overall spatial resolution is limited by diffusion. Negative ion drift exhibits lower diffusion than electron drift and is thus an attractive option for realising a large-scale detector. The use of electronegative gases to create negative ions introduces technical challenges, most notably a reduction in gain when compared to conventional gas mixtures. In this study, we demonstrate a new method for negative ion generation via dissociative electron attachment using the conventional molecular fill gas CF$_4$. Our optical measurements of negative ion drift indicate electron attachment lengths of $<$1 mm and comparable gain to electron avalanches. The individual negative ion avalanches were also time-resolved, allowing the number of ions reaching the readout to be counted. We measure an improved energy resolution by single ion counting, relative to an integrated electron avalanche signal measured under identical gain conditions.

physics.ins-det